roofy

50 Nevins Street

Brooklyn, NY 11217BBL 3-00172-7501Map

Owner of record: Icl Nevins Street Housing Development Fu Nd Corp.

50 Nevins Street is a condominium built in 1926 in Brooklyn, 11217. It has 129 residential units across 7 floors. The owner of record is Icl Nevins Street Housing Development Fu Nd Corp.. HPD has recorded 41 housing violations here, most recently on September 4, 2026. 4 of the 41 most recent violations are still open. City tax records listed 129 rent-stabilized apartments here in 2024.

HPD violations
41
DOB violations
11
ECB violations
31
HPD complaints
131

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Sep 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
129
About 100% of the building's 129 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 41

  • B

    Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 2g, 2nd story, 3rd apartment from north at east

    Sep 4, 2026 · Apt 2G

    Open — Nov sent out
  • A

    Replace with new the missing safety covers or caps at all electric outlets at all walls at public hall, 1st story

    Jul 8, 2026

    Open — Nov certified on time
  • A

    Replace with new the missing safety covers or caps at all electric outlets at all walls at public hall, 2nd story

    Jul 8, 2026

    Open — Nov certified on time
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the private hallway located at apt 2g, 2nd story, 2nd apartment from east at south

    Jul 8, 2026 · Apt 2G

    Open — Civ14 mailed
  • B

    Properly repair the source and abate the evidence of a water leak at north wall in the bathroom located at apt 2g, 2nd story, 3rd apartment from north at east

    Apr 12, 2026 · Apt 2G

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 2g, 2nd story, 3rd apartment from north at east

    Apr 12, 2026 · Apt 2G

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective caulking around west wall at sink countertop in the kitchen located at apt 10p, 10th story, 1st apartment from south at west

    Sep 18, 2025 · Apt 10P

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective reglaze bathtub in the bathroom located at apt 10p, 10th story, 1st apartment from south at west

    Aug 18, 2025 · Apt 10P

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective reglaze bath tub in the bathroom located at apt 10p, 10th story, 1st apartment from south at west , section ''north''

    Jul 17, 2025 · Apt 10P

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective chain guard at door in the entrance located at apt 10h, 10th story, 2nd apartment from north at east

    Mar 7, 2025 · Apt 10H

    Closed — Violation dismissed
Show 31 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 10h, 10th story, 2nd apartment from north at east

    Mar 7, 2025 · Apt 10H

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 10h, 10th story, 2nd apartment from north at east

    Mar 7, 2025 · Apt 10H

    Closed — Violation dismissed
  • C

    Repair the roof so that it will not leak over ceiling in the 3rd room from north at west located at apt 10p, 10th story, 1st apartment from south at west

    Aug 15, 2024 · Apt 10P

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north at west located at apt 10p, 10th story, 1st apartment from south at west

    Aug 15, 2024 · Apt 10P

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over west wall, ceiling in the bathroom located at apt 10p, 10th story, 1st apartment from south at west

    Aug 15, 2024 · Apt 10P

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, ceiling in the bathroom located at apt 10p, 10th story, 1st apartment from south at west

    Aug 15, 2024 · Apt 10P

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 10p, 10th story, 1st apartment from south at west

    Aug 15, 2024 · Apt 10P

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over ceiling in the kitchen located at apt 10p, 10th story, 1st apartment from south at west

    Aug 15, 2024 · Apt 10P

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over east wall, ceiling in the 3rd room from north at east located at apt 10p, 10th story, 1st apartment from south at west

    Aug 15, 2024 · Apt 10P

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective enamel surface at bathtub in the bathroom located at apt 10p, 10th story, 1st apartment from south at west

    Aug 15, 2024 · Apt 10P

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at west, the 3rd room from north at east, the bathroom , the kitchen located at apt 10p, 10th story, 1st apartment from south at west

    Aug 15, 2024 · Apt 10P

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling in the 3rd room from north at east located at apt 10p, 10th story, 1st apartment from south at west

    Aug 15, 2024 · Apt 10P

    Closed — Violation dismissed
  • B

    Abate the infestation consisting of vermin gnats in the entire apartment located at apt 2g, 2nd story, 3rd apartment from north at east

    Jun 27, 2024 · Apt 2G

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2g, 2nd story, 3rd apartment from north at east

    Jun 22, 2024 · Apt 2G

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 20, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 1, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 1, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 12, 2021

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the room located at b-room 519, 5th story, 3rd b-room from south at west

    Jan 1, 2018 · Apt 519

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jan 1, 2018

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 28, 2017

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt rm320, 3rd story, 2nd apartment from west at north

    Mar 15, 2017 · Apt RM320

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at community bathroom, 3rd story

    Mar 15, 2017

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling (aprx. 8 sq.ft.) at community bathroom, 3rd story

    Mar 15, 2017

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system boiler room door locked at cellar

    Mar 15, 2017

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective vinil tiles at floor at center located at b-room 630, 6th story, 9th b-room from east at south

    Dec 31, 2015 · Apt 630

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling located at b-room 630, 6th story, 9th b-room from east at south

    Dec 31, 2015 · Apt 630

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 20, 2015

    Closed — Violation dismissed
  • A

    No decorating in 3 years. paint with light colored paint to the satisfaction of this department all walls and ceiling through-out in the 1st room from east located at apt 630, 6th story, 4th apartment from north at east

    Apr 6, 2015 · Apt 630

    Closed — Violation dismissed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint radiator cover at east wall in the 1st room from east located at apt 630, 6th story, 4th apartment from north at east

    Apr 6, 2015 · Apt 630

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 1, 2015

    Closed — Violation closed

DOB building violations · 11

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2022

    Apr 22, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 5, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 5, 2022

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 23, 2021

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2021

    Dob violation - dismissed
Show 1 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 9, 2020

    Dob violation - dismissed

ECB violations · 31

  • Class - 2

    Adjust bottom landing hoistway door access hole. misaligned cab mirror. expired maintenance log.

    Jun 10, 2025 · Penalty $625

    Resolve
  • Class - 2

    At the time of my inspection, i observed two sidewalk post installed less than 7 feet near an active parking garage driveway on expo# 4; the two posts have neither a knee bracing to prevent vehicular displaceme

    Sep 8, 2022 · Penalty $2,400

    Resolve
  • Class - 2

    At the time of my inspection, i observed that the project information board on expo # 2 and 4 are torn and defaced. also, the fence viewing panels are defaced. the project information panel and the viewing pan

    Sep 8, 2022

    Resolve
  • Class - 1

    In response to an incident of pedestrian walking underneath the sidewalk at exp. 1, slipping and falling observed sidewalk been recently repaired by the contractor with concrete being cured and area barricaded

    Jun 21, 2022 · Penalty $625

    Resolve
  • Class - 2

    Bc 3307.2.1 failure to comply w/ dot regulations-barriers. i observed active site at punchlist phase. barriers w/ chainlink fence on top at exp 1,2 and 4 were leaning into the storage zone and not plumb. upon r

    Mar 9, 2022

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments.at time of inspection of active job site oberved operation at grade level unsafely review of site safety plans contrary to pla

    Oct 8, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3307.5 failure to provide flag person as required.at time of inspection of active job site concrete pouring operatoins at exp #2 observed no flag person to direct pedestrians trucks were observed entering and

    Oct 8, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications-no alternative walkway provided.at time of inspection of active job site exterior work in progress at grade level cement truck entering and leaving job si

    Oct 8, 2021 · Penalty $2,400

    Resolve
  • Class - 1

    Permit holder failed to ensure workers attend preshift safety meeting prior to commencement of work.@time of insp of active jobsite in response to accident where worker(luis fernando loja) was injured while per

    Feb 8, 2021

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping.@time of insp in response toaccident where worker was injured while coming down hoist ramp w/materials,active site.i observed ramp being used&ground wet creating slippi

    Feb 8, 2021 · Penalty $625

    Resolve
Show 21 more ↓
  • Class - 1

    Failure to institute&maintain safety equipment measures.@time of my insp in response to accident where worker was injured coming down hoist ramp.insp revealed no safety measures provided to safeguard personnel

    Feb 8, 2021 · Penalty $10,000

    Resolve
  • Class - 1

    Hydrostatic test note:at the time of my inspection of a 10 story bldg construction work in progress,i observed bldg at roof level,upon request for hydrostatic test for stand pipe none was provided did a researc

    Feb 4, 2021 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to notify the dept of an accident/incident that resulted in a fatality or an incident. a carpenter was injured while drilling a holefor a dowel,he suffered a laceration on his pinky finger. he went to a

    Sep 12, 2020

    Resolve
  • Class - 1

    Sec. 3301.2 uncapped rebars. note: at the time of inspection observed enlargement of existing bldg under construction at 8th fl level. active job site,workers working on it. also observed uncapped rebars at 1st

    Sep 9, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Inadequate housekeeping. note: at the time of inspection,observed enlargement of existing bldg under construction at 8th fl level. active job site,workers working on it. also observed inadequate housekeeping at

    Sep 9, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3301.2 failure to maintain safety operation: unsafe platform. note: at the time of inspection observed enlargement of existing bldg under construction at 8th fl level. active jobsite,workers working on it.

    Sep 9, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3301.2 failure to safeguard: no ppe. note: at the time of inspection observed enlargement of existing bldg under construction at 8th fl level. active job site,workers working on it. also observed a plywood

    Sep 9, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Inadequate guardrails systerm: missing toe board. note: at the time ofinspection observed enlargement of existing bldg under construction at8th fl level. active job site,workers working on it. also observed

    Sep 9, 2020

    Resolve
  • Class - 2

    Flaggers @time of inspection @an active alt const job site, i observedworkers off-loading rebar from wiring in the said location during suchoperations.rem: provide flaggers/comply with code.

    May 11, 2020

    Resolve
  • Class - 1

    Permit.at the timeof inspection i observed active jobsite.i noted use of mini excavator machine equipment for demolition without permit.remedy:comply with code/maintain permit.

    Mar 26, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Demolition sequence.at the time of inspection i observed active jobsite.upon review of demolition sequence provide.as per#(1.3)no temporary shoring provided or installed as per sequence.this condition is hazard

    Mar 26, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Material/equipment surcititae.at the time of inspection i observed active jobsite mth excavation and demo on-going.i observed excavated material,equipment i-beams,wooden planks scattered entirely excavated area

    Mar 26, 2020 · Penalty $625

    Resolve
  • Class - 1

    Bc33034-egress.at the time of inspection i observed active jobsite.i noted excavation on-going activities with no at least one means of egress to the excavated area.this condition is hazardous the entire jobsit

    Mar 26, 2020 · Penalty $625

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurteannces required by 28-302.4 for control #809055.agg2 history of noncompliance o

    Feb 13, 2020 · Penalty $6,250

    Resolve
  • Class - 1

    Work does not confrom to approved construction documents/amendments.note:at time of my inspection of a 10 story building alt1 work in progress,i observed supported scaffold in place and readely available to use

    Feb 7, 2020 · Penalty $6,250

    Resolve
  • Class - 2

    Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control#709055. remedy: submit required technical report.

    Mar 7, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain exterior bldg:defects noted:1-horizontal cracks inbricks and cracks at entrance canopy 2 corroded steel lintels;3-cracksin stone,terra cotta and cornice.noted location:exposures #1 and 4,lev

    Sep 1, 2015 · Penalty $530

    Resolve
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat

    Jan 26, 2015 · Penalty $800

    Resolve
  • Class - 3

    B354 25a 25b 32a. (50a) boiler room not a storage room.

    Jun 21, 2014 · Penalty $250

    Resolve
  • Class - 2

    B254 32a 36.

    Jun 21, 2014 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to file an acceptable technical report in compliance with codeprovisions: periodic inspection of exterior walls and appurtenances asrequired by article 28.302 and the department of buildings rules and s

    Dec 21, 2013 · Penalty $4,000

    Resolve

Complaints

  • Paint/plaster

    Wall

    Oct 22, 2026 · Apt 2G

    Open
  • Paint/plaster

    Wall

    Oct 22, 2026 · Apt 2G

    Open
  • Door/window

    Door

    Oct 22, 2026 · Apt 2G

    Open
  • Safety

    Smoke detector

    Oct 9, 2026 · Apt 7E

    Open
  • Paint/plaster

    Wall

    Oct 9, 2026 · Apt 7E

    Open
  • Door/window

    Door

    Oct 5, 2026 · Apt 2G

    Open
  • Paint/plaster

    Wall

    Oct 5, 2026 · Apt 2G

    Open
  • Heat/hot water

    Entire building

    Oct 2, 2026 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Jul 29, 2026 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    Jul 29, 2026 · Apt 2G

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Jul 28, 2026 · Apt 2G

    Close
  • Safety

    Carbon monoxide detector

    Jul 28, 2026 · Apt 2G

    Close
  • Safety

    Smoke detector

    Jul 28, 2026 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    Jul 28, 2026 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    Jun 26, 2026 · Apt 2G

    Close
  • Paint/plaster

    Wall

    Jun 26, 2026 · Apt 2G

    Close
  • Safety

    Carbon monoxide detector

    Jun 26, 2026 · Apt 2G

    Close
  • Safety

    Smoke detector

    Jun 26, 2026 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    Jun 5, 2026 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    Jun 5, 2026 · Apt 2G

    Close
  • Paint/plaster

    Wall

    Jun 5, 2026 · Apt 2G

    Close
  • Paint/plaster

    Wall

    Jun 5, 2026 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    May 15, 2026 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    May 15, 2026 · Apt 2G

    Close
  • Paint/plaster

    Wall

    May 15, 2026 · Apt 2G

    Close
  • Paint/plaster

    Wall

    Jan 28, 2026 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    Jan 28, 2026 · Apt 2G

    Close
  • Heat/hot water

    Apartment only

    Jan 28, 2026 · Apt 2G

    Close
  • Paint/plaster

    Wall

    Dec 21, 2025 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    Dec 21, 2025 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    Dec 9, 2025 · Apt 2G

    Close
  • Paint/plaster

    Wall

    Dec 9, 2025 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    Dec 9, 2025 · Apt 2G

    Close
  • Flooring/stairs

    Floor

    Dec 4, 2025 · Apt 4D

    Close
  • Flooring/stairs

    Floor

    Dec 4, 2025 · Apt 10H

    Close
  • Paint/plaster

    Wall

    Nov 25, 2025 · Apt 2G

    Close
  • Door/window

    Window frame

    Nov 25, 2025 · Apt 2G

    Close
  • Unsanitary condition

    Mold

    Nov 20, 2025 · Apt 7L

    Close
  • Plumbing

    Bathtub/shower

    Sep 19, 2025 · Apt 10P

    Close
  • Plumbing

    Basin/sink

    Sep 19, 2025 · Apt 10P

    Close
  • Outside building

    Skylight

    Sep 19, 2025 · Apt 10P

    Close
  • Plumbing

    Toilet

    Sep 19, 2025 · Apt 10P

    Close
  • Door/window

    Window frame

    Sep 19, 2025 · Apt 10P

    Close
  • Paint/plaster

    Door/frame

    Sep 19, 2025 · Apt 10P

    Close
  • Plumbing

    Basin/sink

    Sep 13, 2025 · Apt 7J

    Close
  • Unsanitary condition

    Pests

    Sep 13, 2025 · Apt 7J

    Close
  • Plumbing

    Basin/sink

    Sep 8, 2025 · Apt 10P

    Close
  • Paint/plaster

    Ceiling

    Sep 8, 2025 · Apt 10P

    Close
  • Plumbing

    Toilet

    Sep 8, 2025 · Apt 10P

    Close
  • Plumbing

    Bathtub/shower

    Sep 8, 2025 · Apt 10P

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
1926
Floors
7
Residential units
129
Building area
109,815 ft²
Lot area
12,740 ft²
Zoning
C6-4
Community board
302
Council district
33
Block / lot
172 / 7501
Assessed value
$10,085,850
Landmark / historic district
No

HPD registration #346295, last renewed Aug 12, 2025.

Questions about 50 Nevins Street

Who owns 50 Nevins Street?

The owner of record in NYC Department of City Planning PLUTO data is Icl Nevins Street Housing Development Fu Nd Corp..

Does 50 Nevins Street have violations?

Yes. NYC HPD has recorded 41 housing violations at this property.

Is 50 Nevins Street rent stabilized?

NYC Department of Finance tax bills listed 129 rent-stabilized units here in 2024 (about 100% of its 129 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 50 Nevins Street built?

City records list 1926 as the year it was built.

How many apartments are in 50 Nevins Street?

It has 129 residential units and 130 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.