678 East 225 Street
Bronx, NY 10466BBL 2-04826-0081Map
Owner of record: Kodra Rlty Corp
678 East 225 Street is a walk-up apartment building built in 1928 in Bronx, 10466. It has 43 residential units across 5 floors. The owner of record is Kodra Rlty Corp. HPD has recorded 646 housing violations here, most recently on May 16, 2026. 5 of the 50 most recent violations are still open. City tax records listed 42 rent-stabilized apartments here in 2024.
- HPD violations
- 646
- DOB violations
- 5
- ECB violations
- 3
- HPD complaints
- 1,142
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 646
- CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable 2 motion electromagnetic locking device installed at building entrance door , 1st story
May 16, 2026
Open — Not complied with - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance door , 1st story
May 16, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wasteline at wash basin in the bathroom located at apt 3i, 4th story, 2nd apartment from east at south , section ''west''
Apr 15, 2026 · Apt 3I
Closed — Violation dismissed - CImmediately hazardous
Provide security in-event of an power outage by means of heavy duty lock and latch set install at building entrance door at public hall, 1st story
Apr 15, 2026
Open — Not complied with - BHazardous
Provide approved type wire mesh installed at skilight at 1st public hall bulkhead from east, 5th story, section ''east''
Apr 15, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tile creating cut hazard in the kitchen located at apt 3i, 4th story, 2nd apartment from east at south , section ''west''
Apr 15, 2026 · Apt 3I
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening lockable slide bolt installed on door at 1st public hall bulkhead from east, 5th story, section ''east''
Apr 15, 2026
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3i, 4th story, 2nd apartment from east at south , section ''west''
Apr 15, 2026 · Apt 3I
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing located at apt 3i, 4th story, 2nd apartment from east at south , section ''west''
Apr 15, 2026 · Apt 3I
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective raised wood floor creating trip hazard in the foyer located at apt 3i, 4th story, 2nd apartment from east at south , section ''west''
Apr 15, 2026 · Apt 3I
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2b, 3rd story
Apr 15, 2026 · Apt 2B
Closed — Violation closed - BHazardous
Provide security in the event of a power failure by means of an accepatable mechanical heavy duty lock and latch set at door [street to public hall] , 1st story
Apr 8, 2026
Open — Not complied with - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at door [street to public hall] , 1st story
Apr 8, 2026
Open — Not complied with - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1b, 2nd story, 1st apartment from west at north , section ''east''
Apr 8, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing located at apt 1b, 2nd story, 1st apartment from west at north , section ''east''
Apr 8, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in at wasteline at bathtub in the bathroom located at apt 1b, 2nd story, 1st apartment from west at north , section ''east''
Apr 8, 2026 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 1b, 2nd story, 1st apartment from west at north , section ''east''
Apr 8, 2026 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 1b, 2nd story, 1st apartment from west at north , section ''east''
Apr 8, 2026 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 2nd story, 1st apartment from west at north , section ''east''
Apr 8, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing located at apt 1b, 2nd story, 1st apartment from west at north , section ''east''
Apr 8, 2026 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 1d, 2nd story, 2nd apartment from east at south , section at east
Mar 12, 2026 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 2c, 3rd story, 1st apartment from east at south , section at east
Mar 12, 2026 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 2b, 3rd story, 1st apartment from west at north , section at east
Mar 12, 2026 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 3a, 4th story, 2nd apartment from west at north , section at east
Mar 12, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 4c, 5th story, 1st apartment from east at south , section at east
Mar 12, 2026 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 3i, 4th story, 2nd apartment from east at south , section at west
Mar 12, 2026 · Apt 3I
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 3g, 4th story, 1st apartment from west at north , section at west
Mar 12, 2026 · Apt 3G
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 1b, 2nd story, 1st apartment from west at north , section at east
Mar 12, 2026 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at north wall, baseboard at west wall, baseboard at east wall, 1st door from north at east wall in the 3rd room from east located at apt 2h, 3rd story, 1st apartment from east at south
Mar 3, 2026 · Apt 2H
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the private hallway , the bathroom , the foyer , the kitchen located at apt 2h, 3rd story, 1st apartment from east at south
Mar 3, 2026 · Apt 2H
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 2h, 3rd story, 1st apartment from east at south
Mar 3, 2026 · Apt 2H
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at south located at apt 2h, 3rd story, 1st apartment from east at south
Mar 3, 2026 · Apt 2H
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the 3rd room from east located at apt 2h, 3rd story, 1st apartment from east at south
Mar 3, 2026 · Apt 2H
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall, 1st radiator from east at south wall in the 3rd room from east located at apt 2h, 3rd story, 1st apartment from east at south
Mar 3, 2026 · Apt 2H
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). south wall, east wall in the 3rd room from east located at apt 2h, 3rd story, 1st apartment from east at south
Mar 3, 2026 · Apt 2H
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall in the 3rd room from east located at apt 2h, 3rd story, 1st apartment from east at south
Mar 3, 2026 · Apt 2H
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 2h, 3rd story, 1st apartment from east at south , section ''west''
Mar 1, 2026 · Apt 2H
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the foyer located at apt 2h, 3rd story, 1st apartment from east at south , section ''west''
Mar 1, 2026 · Apt 2H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 2h, 3rd story, 1st apartment from east at south , section ''west''
Mar 1, 2026 · Apt 2H
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the foyer located at apt 2h, 3rd story, 1st apartment from east at south , section ''west''
Mar 1, 2026 · Apt 2H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east corner wall in the 1st room from east at south located at apt 2h, 3rd story, 1st apartment from east at south , section ''west''
Mar 1, 2026 · Apt 2H
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the 1st room from east at south located at apt 2h, 3rd story, 1st apartment from east at south , section ''west''
Mar 1, 2026 · Apt 2H
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 2h, 3rd story, 1st apartment from east at south , section ''west''
Mar 1, 2026 · Apt 2H
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of wire running from south light switch to light fixture at ceiling in the 3rd room from east located at apt 2h, 3rd story, 1st apartment from east at south , section ''west''
Mar 1, 2026 · Apt 2H
Closed — Violation dismissed - ANon-hazardous
Provide striker plate at door frame in the entrance located at apt 2h, 3rd story, 1st apartment from east at south , section ''west''
Mar 1, 2026 · Apt 2H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 2h, 3rd story, 1st apartment from east at south , section ''west''
Mar 1, 2026 · Apt 2H
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at all cold water fixtures in the bathroom located at apt 2h, 3rd story, 1st apartment from east at south , section ''west''
Mar 1, 2026 · Apt 2H
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at hot water fixtures in the bathroom located at apt 2h, 3rd story, 1st apartment from east at south , section ''west''
Mar 1, 2026 · Apt 2H
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of wire installed running from north wall light switch to light fixture at ceiling in the bathroom located at apt 2h, 3rd story, 1st apartment from east at south , section ''west''
Mar 1, 2026 · Apt 2H
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2h, 3rd story, 1st apartment from east at south , section ''west''
Mar 1, 2026 · Apt 2H
Closed — Violation dismissed
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active
ECB violations · 3
- Class - 2
Found opening on ceiling, exposed wiring, body drains missing on safety relief valves, flue pipe not properly supported, latches and bolts missing on boiler doors, coil plate corroded.
Jul 14, 2021 · Penalty $625
Active - Class - 1
Failure to provide unobstructed exit passageway. at the time of inspection noted tree branches throughout rear fire escape and drop ladder obstructing building secondary means of egress in case of an emergency.
Jun 2, 2020 · Penalty $312
Resolve - Non-hazardous
Failure to maintain building at bulkhead north side door is out of plumb not locking or shuting at the alley north side door is missing entire lockset and is not self closing from fire corridor .remedy:fix item
Nov 17, 2004 · Penalty $180
Resolve
Complaints
- Appliance
Refrigerator
Oct 20, 2026 · Apt APT3G
Open - Flooring/stairs
Floor
Jul 15, 2026 · Apt 3I
Open - Line of travel
Line of travel
Mar 20, 2026 · Apt 1D
Close - Line of travel
Line of travel
Mar 20, 2026 · Apt 1B
Close - Line of travel
Line of travel
Mar 20, 2026 · Apt 2C
Close - Line of travel
Line of travel
Mar 20, 2026 · Apt 2B
Close - Line of travel
Line of travel
Mar 20, 2026 · Apt 3A
Close - Line of travel
Line of travel
Mar 20, 2026 · Apt 4C
Close - Line of travel
Line of travel
Mar 20, 2026 · Apt 3I
Close - Line of travel
Line of travel
Mar 20, 2026 · Apt 3G
Close
Show 40 more ↓
- Plumbing
Toilet
Mar 1, 2026 · Apt 2H
Close - Plumbing
Toilet
Mar 1, 2026 · Apt 2H
Close - Plumbing
Bathtub/shower
Mar 1, 2026 · Apt 2H
Close - Plumbing
Toilet
Mar 1, 2026 · Apt 2H
Close - Plumbing
Basin/sink
Mar 1, 2026 · Apt 2H
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 1I
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Plumbing
Bathtub/shower
Jan 31, 2026 · Apt 1IONEE
Close - Plumbing
Bathtub/shower
Jan 31, 2026 · Apt 1IONEE
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 2I
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt 1I
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt 1I
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Plumbing
Radiator
Jan 21, 2026 · Apt 1I
Close - Plumbing
Basin/sink
Jan 3, 2026 · Apt 3I
Close - Flooring/stairs
Floor
Jan 3, 2026 · Apt 3I
Close - Flooring/stairs
Floor
Jan 3, 2026 · Apt 3I
Close - Plumbing
Bathtub/shower
Jan 3, 2026 · Apt 3I
Close - Flooring/stairs
Floor
Dec 24, 2025 · Apt 3F
Close - General
Cabinet
Dec 24, 2025 · Apt 3F
Close - Paint/plaster
Wall
Nov 5, 2025 · Apt 3F
Close - Plumbing
Steam pipe/riser
Nov 5, 2025 · Apt 3F
Close - Flooring/stairs
Floor
Oct 20, 2025 · Apt 3I
Close - Plumbing
Bathtub/shower
Oct 20, 2025 · Apt 3I
Close - Flooring/stairs
Floor
Oct 20, 2025 · Apt 3I
Close - General
Cabinet
Mar 19, 2025 · Apt 3F
Close - Heat/hot water
Apartment only
Mar 19, 2025 · Apt 3F
Close - Unsanitary condition
Mold
Mar 19, 2025 · Apt 3F
Close - Unsanitary condition
Pests
Mar 19, 2025 · Apt 3F
Close - Paint/plaster
Ceiling
Feb 21, 2025 · Apt 4I
Close - Plumbing
Radiator
Feb 21, 2025 · Apt 4I
Close - General
Cabinet
Feb 21, 2025 · Apt 4I
Close - Paint/plaster
Wall
Feb 17, 2025 · Apt 3I
Close - Flooring/stairs
Floor
Feb 17, 2025 · Apt 3I
Close - Plumbing
Bathtub/shower
Feb 11, 2025 · Apt 1I
Close - Paint/plaster
Ceiling
Feb 11, 2025 · Apt 1I
Close - Plumbing
Basin/sink
Feb 11, 2025 · Apt 1I
Close - Unsanitary condition
Pests
Feb 11, 2025 · Apt 1I
Close - Door/window
Window frame
Feb 11, 2025 · Apt 1I
Close - Safety
Fire escape
Feb 11, 2025 · Apt 1I
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1928
- Floors
- 5
- Residential units
- 43
- Building area
- 40,300 ft²
- Lot area
- 11,452 ft²
- Zoning
- R6A
- Community board
- 212
- Council district
- 12
- Block / lot
- 4826 / 81
- Assessed value
- $641,700
- Landmark / historic district
- No
HPD registration #205673, last renewed Sep 3, 2025.
Questions about 678 East 225 Street
Who owns 678 East 225 Street?
The owner of record in NYC Department of City Planning PLUTO data is Kodra Rlty Corp.
Does 678 East 225 Street have violations?
Yes. NYC HPD has recorded 646 housing violations at this property.
Is 678 East 225 Street rent stabilized?
NYC Department of Finance tax bills listed 42 rent-stabilized units here in 2024 (about 98% of its 43 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 678 East 225 Street built?
City records list 1928 as the year it was built.
How many apartments are in 678 East 225 Street?
It has 43 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.