3950 Bronx Boulevard
Bronx, NY 10466BBL 2-04820-0028Map
Owner of record: 224th Street Aparts.limited Liability Co Mpany
3950 Bronx Boulevard is an elevator apartment building built in 1929 in Bronx, 10466. It has 59 residential units across 6 floors. The owner of record is 224th Street Aparts.limited Liability Co Mpany. HPD has recorded 268 housing violations here, most recently on October 7, 2026. 37 of the 50 most recent violations are still open. City tax records listed 50 rent-stabilized apartments here in 2024.
- HPD violations
- 268
- DOB violations
- 33
- ECB violations
- 21
- HPD complaints
- 435
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 268
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Oct 7, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at the ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east
Oct 7, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Oct 7, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the foyer , the kitchen , the 1st private hallway from east, the bathroom , the 2nd private hallway from east located at apt 2a, 2nd story, 1st apartment from north at east
Oct 7, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 1st window frame from north at east wall in the 1st room from east located at apt 2a, 2nd story, 1st apartment from north at east
Oct 7, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Oct 7, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the 4th room from east located at apt 5a, 5th story, 3rd apartment from north at east
Sep 19, 2026 · Apt 5A
Open — Civ14 mailed - BHazardous
M/d law abate the nuisance consisting of consisting of vinyl floor tile creating potential trip hazard in the private hallway located at apt 5a, 5th story, 3rd apartment from north at east
Jul 15, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 4th room from east located at apt 5a, 5th story, 3rd apartment from north at east
Jul 15, 2026 · Apt 5A
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of consisting of bicycles, tables, chairs and household items south section) at public hall, 1st story
Jul 15, 2026
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
May 28, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story
Jan 30, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of construction material (sheet rock, grout ) at public hall, 1st story
Jan 14, 2026
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of construction materials (sheetrock) at public hall, 1st story
Dec 21, 2025
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west
Dec 7, 2025 · Apt 2D
Open — Notice of issuance sent to tenant - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all balconies at 2nd fire escape from north at west exterior wall (building front) at fire escape
Oct 11, 2025
Open — Nov sent out - CImmediately hazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at 2nd fire escape from north at west exterior wall building front at fire escape
Oct 11, 2025
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of key opperated lock set installed on door to room with fire escape in the 1st room from north at west located at apt 5d, 5th story, 1st apartment from south at west , section ''south''
Oct 11, 2025 · Apt 5D
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5d, 5th story, 1st apartment from south at west , section ''south''
Oct 11, 2025 · Apt 5D
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of lint blowing out into west yard emitting lint and blowing into the apartments at public hall
Oct 11, 2025
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration illegal laundry room at basement at public hall
Oct 11, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at 2nd lower sash window from north at east wall at 1st story at public hall
Oct 11, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of screws at 1st window from north at east wall at 1st story at public hall
Oct 11, 2025
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of sealed window at 1st window from north at east wall at 1st story at public hall
Oct 11, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at 2nd lower sash window from south at west wall in the 1st room from north at west located at apt 5d, 5th story, 1st apartment from south at west , section ''south''
Oct 11, 2025 · Apt 5D
Open — Nov sent out - CImmediately hazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods out of guide at second fire escape from north at west exterior wall front of building at fire escape
Oct 8, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 2d, 2nd story, 1st apartment from south at west
Jun 27, 2025 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Replace with new the missing counter top at north wall in the kitchen located at apt 2d, 2nd story, 1st apartment from south at west
Jun 27, 2025 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Properly secure the loose telephone wire at east wall in the 1st room from east at south located at apt 2d, 2nd story, 1st apartment from south at west
Jun 27, 2025 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective ceramic tiled floor in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west
Jun 27, 2025 · Apt 2D
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west
Jun 27, 2025 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective ....electrical outlet at west wall. in the 1st room from east at south located at apt 2d, 2nd story, 1st apartment from south at west
Jun 7, 2025 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective ....ceramic tiles at floor in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west
Jun 7, 2025 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective ...electrical light fixture at ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west
Jun 7, 2025 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Remove all encumbrances consisting of construction material at public hall, 1st story
Jan 19, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5a, 5th story, 3rd apartment from east at south
Jan 19, 2025 · Apt 5A
Closed — Violation closed - BHazardous
Provide escutcheon plate at riser at ceiling in the bathroom located at apt 5a, 5th story, 3rd apartment from east at south
Jan 19, 2025 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 19, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5a, 5th story, 3rd apartment from east at south
Jan 19, 2025 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west
Jan 8, 2025 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 2d, 2nd story, 1st apartment from south at west
Dec 6, 2024 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east window sill in the 1st room from east located at apt 2d, 2nd story, 1st apartment from south at west
Dec 6, 2024 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of extension cords at south and north wall in the 1st room from east located at apt 2d, 2nd story, 1st apartment from south at west
Dec 6, 2024 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of at north wall in the entrance located at apt 2d, 2nd story, 1st apartment from south at west
Dec 6, 2024 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west
Dec 6, 2024 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west
Dec 6, 2024 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Remove all encumbrances consisting of building items (lumber ect) at public hall, 1st story
Nov 18, 2024
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west
Sep 1, 2024 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective spring balances lower window sash in the 1st room from east located at apt 5a, 5th story, 3rd apartment from north at east
Apr 29, 2024 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east located at apt 5a, 5th story, 3rd apartment from north at east
Apr 29, 2024 · Apt 5A
Closed — Violation closed
DOB building violations · 33
- Construction other optional
Emergency work order due to hazardous materials observed at exp1 & 4.o bserved step cracks at parapet level near the corner of the building.o bserved loose brick near window lintel at exp4.observed crack brick th roughout the facade 1,2,3,4.observed cracked stone at entrance.remedy immediately remove loose material noted.provide safety measures
Jun 7, 2024
Dob violation - dismissed - Construction other optional
Failure to maintain building in a code compliant manner.at the time of inspection observed at exp1 loose,damaged missing mortar joints at num erous areas.observed cracks in brick and at entrance.at exp4 observed step crack at parapet level near corner of building.remedy:repair or r eplace
Jun 7, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 18, 2021
Dob violation - active - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Oct 1, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 7, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 9, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2016
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - active
Show 23 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 22, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 1, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 9, 2012
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - active - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Mar 7, 2012
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Mar 2, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 1, 2008
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 15, 2004
Dob violation - resolved - Construction other optional
C-construction other optional
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
(51) file a bn and secure a permit for the installation or new brake installed as per nyc admin code rs 18
May 5, 1989
Dob violation - resolved - Elevator elevatorrequired
51-secure smoke hole grating 52-properly label button in car
Dec 30, 1988
Dob violation - resolved
ECB violations · 21
- Class - 2
Observed failure to conduct or file a final inspection of permitted work for job # x08001736-i1-gc, conduct/file final inspection
Oct 29, 2025
Resolve - Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025
Resolve - Class - 2
Unapproved,unsafe,unsuitable electrical equipment apparatus materials devices appliances or wiring in use.extension cords used as permanent wiring in the boiler room.conduit not properly installed in the boiler
Mar 4, 2019 · Penalty $800
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #808713. rmdy: submit required technical report.
Oct 15, 2018
Resolve - Class - 1
Failure to maintain exterior bldg facade and appurtenance.noted:at thetime of inspection observe cracks/loose bricks,mortar /deteriorated juliet masonry balcony(set back)on 3rd fl.exposure#1,northwest&southwest
Nov 18, 2017 · Penalty $1,000
Resolve - Class - 2
Failure to maintain exterior bldg.north/west corner on exposure #2 hasvertical cracking.rem:maintain exterior bldg provide safety measures,repair & restore damaged facade as per 1rcny 103-04.
Mar 19, 2014 · Penalty $250
Resolve - Class - 2
Following the receipt of a permit to erect a sidewalk shed the permit holder shall post a readily visible sign on the sidewalk shed. no signon shed. rem:comply with code.
Jul 12, 2012
Resolve - Class - 2
Work without a permit. post no permit for sidewalk shed. rem:renew obtain & post permit of sidewalk shed.
Jun 19, 2012 · Penalty $400
Resolve - Class - 1
Work without permit. work noted:at exposure 4 a stacked row of bricks felled from the 5th flr apart #5d to the sidewalk below. violation #34936724p was issued on 3-1-12 for the defect. violation states to obtai
Mar 6, 2012 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. a row of stacked bricks from the 5th flr apartment #5d fellto city sidewalk. the work to restore or replace the row of stacked br
Mar 6, 2012 · Penalty $2,400
Resolve
Show 11 more ↓
- Class - 1
Failure to maintain exterior of building defect:there are approx 4 decorative ornamental pieces with defects. the lintels have rotted there are cracks missing mortar & they are in danger of collapse. the orname
Mar 6, 2012 · Penalty $1,000
Resolve - Class - 1
Failure to maintain exterior building. defect: at exposure 4,bricks have fallen from the 5th floor window. a row of stacked bricks on the exterior of the 5th fl apt #5d bathroom,has fallen on city sidewalk.
Mar 1, 2012 · Penalty $1,000
Resolve - Class - 2
Failure to file an acceptalbe sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.remed
Apr 15, 2011 · Penalty $2,000
Resolve - Class - 2
Failure to maintain exterior bldg east elevation(exp#3)observe cracks & deterioating in lintel facade;step crack and displacement in facade sills;storage stored on fire escape landing)south elevation (exp#4)
Mar 14, 2011 · Penalty $500
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic inspection of exterior walls & appurtenaces as required by article 28.302 & the dob rules & regulations.360107
Jul 12, 2010 · Penalty $2,400
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations
Nov 27, 2009 · Penalty $800
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules & regulations
Feb 6, 2009 · Penalty $4,000
Resolve - Non-hazardous
Failure to provide a system of automatic spinklers where required found (2) commercial dryer with no sprinkler coverage over them remedy:provide automatic spinklers
Jul 29, 2005 · Penalty $400
Active - Non-hazardous
Use of installation of plumbing materials or equipments which do not comply with rs-16 found (2) commercial dryer with flex hose on back of dryer.remedy:remove non-complying material or equipment
Jul 29, 2005 · Penalty $400
Active - Non-hazardous
08v17l21l40u 17-l-no wire glass hoistway door's floors 4 thru 6-basement h/o. glass broken 40tag governor 5 yr test.
Oct 27, 1997
Resolve - Non-hazardous
14m,22d,46b,50y,55i,57o 46)shorten hoist caldes 55)renew broken pit light.
Apr 8, 1991 · Penalty $75
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 8, 2026 · Apt 2D
Close - Unsanitary condition
Mold
Sep 30, 2026 · Apt 2A
Close - Paint/plaster
Wall
Sep 30, 2026 · Apt 2A
Close - Paint/plaster
Wall
Jul 23, 2026 · Apt 5A
Close - Water leak
Slow leak
Jul 23, 2026 · Apt 5A
Close - Paint/plaster
Wall
Jul 9, 2026 · Apt 5A
Close - Water leak
Damp spot
Jul 9, 2026 · Apt 5A
Close - Unsanitary condition
Garbage/recycling storage
May 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 19, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
May 19, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 19, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Appliance
Electric/gas range
Apr 10, 2026 · Apt 5F
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Jan 13, 2026 · Apt 2D
Close - Heat/hot water
Apartment only
Dec 19, 2025 · Apt 2D
Close - Heat/hot water
Apartment only
Dec 5, 2025 · Apt 2D
Close - Heat/hot water
Apartment only
Oct 16, 2025 · Apt 5A
Close - Plumbing
Water supply
Oct 13, 2025 · Apt 5A
Close - Heat/hot water
Apartment only
Oct 10, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Sep 22, 2025 · Apt 5A
Close - Unsanitary condition
Pests
Sep 22, 2025 · Apt 5A
Close - Unsanitary condition
Pests
Jun 25, 2025 · Apt 2D
Close - Flooring/stairs
Floor
Jun 25, 2025 · Apt 2D
Close - Electric
Outlet/switch
Jun 25, 2025 · Apt 2D
Close - Electric
Wiring
Jun 25, 2025 · Apt 2D
Close - General
Cabinet
Jun 25, 2025 · Apt 2D
Close - Plumbing
Basin/sink
Jun 25, 2025 · Apt 2D
Close - Flooring/stairs
Floor
Jun 25, 2025 · Apt 2D
Close - Flooring/stairs
Floor
Jun 2, 2025 · Apt 2D
Close - Flooring/stairs
Floor
Jun 2, 2025 · Apt 2D
Close - Electric
Outlet/switch
Jun 1, 2025 · Apt 2D
Close - Electric
Lighting
Jun 1, 2025 · Apt 2D
Close - Electric
Wiring
Jun 1, 2025 · Apt 2D
Close - Heat/hot water
Entire building
Mar 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 17, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Jan 10, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 5, 2025 · Apt 2J
Close - General
Cabinet
Dec 20, 2024 · Apt 2D
Close - Paint/plaster
Ceiling
Dec 4, 2024 · Apt 2D
Close - Plumbing
Radiator
Dec 4, 2024 · Apt 2D
Close - Paint/plaster
Wall
Dec 4, 2024 · Apt 2D
Close - Door/window
Door
Dec 4, 2024 · Apt 2D
Close - Electric
Outlet/switch
Dec 4, 2024 · Apt 2D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1929
- Floors
- 6
- Residential units
- 59
- Building area
- 54,115 ft²
- Lot area
- 12,024 ft²
- Zoning
- R7-1
- Community board
- 212
- Council district
- 12
- Block / lot
- 4820 / 28
- Assessed value
- $1,916,100
- Landmark / historic district
- No
HPD registration #209440, last renewed Aug 25, 2025.
Questions about 3950 Bronx Boulevard
Who owns 3950 Bronx Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 224th Street Aparts.limited Liability Co Mpany.
Does 3950 Bronx Boulevard have violations?
Yes. NYC HPD has recorded 268 housing violations at this property.
Is 3950 Bronx Boulevard rent stabilized?
NYC Department of Finance tax bills listed 50 rent-stabilized units here in 2024 (about 85% of its 59 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3950 Bronx Boulevard built?
City records list 1929 as the year it was built.
How many apartments are in 3950 Bronx Boulevard?
It has 59 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.