roofy

3950 Bronx Boulevard

Bronx, NY 10466BBL 2-04820-0028Map

Owner of record: 224th Street Aparts.limited Liability Co Mpany

3950 Bronx Boulevard is an elevator apartment building built in 1929 in Bronx, 10466. It has 59 residential units across 6 floors. The owner of record is 224th Street Aparts.limited Liability Co Mpany. HPD has recorded 268 housing violations here, most recently on October 7, 2026. 37 of the 50 most recent violations are still open. City tax records listed 50 rent-stabilized apartments here in 2024.

HPD violations
268
DOB violations
33
ECB violations
21
HPD complaints
435

What to know

Concern
9 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
50
About 85% of the building's 59 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 268

  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Oct 7, 2026 · Apt 2A

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at the ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Oct 7, 2026 · Apt 2A

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Oct 7, 2026 · Apt 2A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the foyer , the kitchen , the 1st private hallway from east, the bathroom , the 2nd private hallway from east located at apt 2a, 2nd story, 1st apartment from north at east

    Oct 7, 2026 · Apt 2A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 1st window frame from north at east wall in the 1st room from east located at apt 2a, 2nd story, 1st apartment from north at east

    Oct 7, 2026 · Apt 2A

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Oct 7, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at west wall in the 4th room from east located at apt 5a, 5th story, 3rd apartment from north at east

    Sep 19, 2026 · Apt 5A

    Open — Civ14 mailed
  • B

    M/d law abate the nuisance consisting of consisting of vinyl floor tile creating potential trip hazard in the private hallway located at apt 5a, 5th story, 3rd apartment from north at east

    Jul 15, 2026 · Apt 5A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 4th room from east located at apt 5a, 5th story, 3rd apartment from north at east

    Jul 15, 2026 · Apt 5A

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of consisting of bicycles, tables, chairs and household items south section) at public hall, 1st story

    Jul 15, 2026

    Open — Nov sent out
Show 40 more ↓
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    May 28, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story

    Jan 30, 2026

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of construction material (sheet rock, grout ) at public hall, 1st story

    Jan 14, 2026

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of construction materials (sheetrock) at public hall, 1st story

    Dec 21, 2025

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west

    Dec 7, 2025 · Apt 2D

    Open — Notice of issuance sent to tenant
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all balconies at 2nd fire escape from north at west exterior wall (building front) at fire escape

    Oct 11, 2025

    Open — Nov sent out
  • C

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at 2nd fire escape from north at west exterior wall building front at fire escape

    Oct 11, 2025

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of key opperated lock set installed on door to room with fire escape in the 1st room from north at west located at apt 5d, 5th story, 1st apartment from south at west , section ''south''

    Oct 11, 2025 · Apt 5D

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5d, 5th story, 1st apartment from south at west , section ''south''

    Oct 11, 2025 · Apt 5D

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of lint blowing out into west yard emitting lint and blowing into the apartments at public hall

    Oct 11, 2025

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration illegal laundry room at basement at public hall

    Oct 11, 2025

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective spring balance at 2nd lower sash window from north at east wall at 1st story at public hall

    Oct 11, 2025

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of screws at 1st window from north at east wall at 1st story at public hall

    Oct 11, 2025

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of sealed window at 1st window from north at east wall at 1st story at public hall

    Oct 11, 2025

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective spring balance at 2nd lower sash window from south at west wall in the 1st room from north at west located at apt 5d, 5th story, 1st apartment from south at west , section ''south''

    Oct 11, 2025 · Apt 5D

    Open — Nov sent out
  • C

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods out of guide at second fire escape from north at west exterior wall front of building at fire escape

    Oct 8, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 2d, 2nd story, 1st apartment from south at west

    Jun 27, 2025 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Replace with new the missing counter top at north wall in the kitchen located at apt 2d, 2nd story, 1st apartment from south at west

    Jun 27, 2025 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Properly secure the loose telephone wire at east wall in the 1st room from east at south located at apt 2d, 2nd story, 1st apartment from south at west

    Jun 27, 2025 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective ceramic tiled floor in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west

    Jun 27, 2025 · Apt 2D

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west

    Jun 27, 2025 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Properly repair or replace the broken or defective ....electrical outlet at west wall. in the 1st room from east at south located at apt 2d, 2nd story, 1st apartment from south at west

    Jun 7, 2025 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Properly repair or replace the broken or defective ....ceramic tiles at floor in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west

    Jun 7, 2025 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Properly repair or replace the broken or defective ...electrical light fixture at ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west

    Jun 7, 2025 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Remove all encumbrances consisting of construction material at public hall, 1st story

    Jan 19, 2025

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5a, 5th story, 3rd apartment from east at south

    Jan 19, 2025 · Apt 5A

    Closed — Violation closed
  • B

    Provide escutcheon plate at riser at ceiling in the bathroom located at apt 5a, 5th story, 3rd apartment from east at south

    Jan 19, 2025 · Apt 5A

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system locked door at boiler room

    Jan 19, 2025

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5a, 5th story, 3rd apartment from east at south

    Jan 19, 2025 · Apt 5A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west

    Jan 8, 2025 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 2d, 2nd story, 1st apartment from south at west

    Dec 6, 2024 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east window sill in the 1st room from east located at apt 2d, 2nd story, 1st apartment from south at west

    Dec 6, 2024 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Properly repair and abate unsafe electric wiring condition consisting of extension cords at south and north wall in the 1st room from east located at apt 2d, 2nd story, 1st apartment from south at west

    Dec 6, 2024 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Properly repair and abate unsafe electric wiring condition consisting of at north wall in the entrance located at apt 2d, 2nd story, 1st apartment from south at west

    Dec 6, 2024 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west

    Dec 6, 2024 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west

    Dec 6, 2024 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Remove all encumbrances consisting of building items (lumber ect) at public hall, 1st story

    Nov 18, 2024

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west

    Sep 1, 2024 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Properly repair or replace the broken or defective spring balances lower window sash in the 1st room from east located at apt 5a, 5th story, 3rd apartment from north at east

    Apr 29, 2024 · Apt 5A

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east located at apt 5a, 5th story, 3rd apartment from north at east

    Apr 29, 2024 · Apt 5A

    Closed — Violation closed

DOB building violations · 33

  • Construction other optional

    Emergency work order due to hazardous materials observed at exp1 & 4.o bserved step cracks at parapet level near the corner of the building.o bserved loose brick near window lintel at exp4.observed crack brick th roughout the facade 1,2,3,4.observed cracked stone at entrance.remedy immediately remove loose material noted.provide safety measures

    Jun 7, 2024

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building in a code compliant manner.at the time of inspection observed at exp1 loose,damaged missing mortar joints at num erous areas.observed cracks in brick and at entrance.at exp4 observed step crack at parapet level near corner of building.remedy:repair or r eplace

    Jun 7, 2024

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 18, 2021

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Oct 1, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 7, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 30, 2016

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2015

    Dob violation - active
Show 23 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 22, 2014

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 1, 2014

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 9, 2012

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 30, 2012

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 30, 2012

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 30, 2012

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 30, 2012

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - active
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Mar 7, 2012

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Mar 2, 2012

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 4, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 1, 2008

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 21, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 15, 2004

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Oct 12, 1989

    Dob violation - dismissed
  • Elevator elevatorrequired

    (51) file a bn and secure a permit for the installation or new brake installed as per nyc admin code rs 18

    May 5, 1989

    Dob violation - resolved
  • Elevator elevatorrequired

    51-secure smoke hole grating 52-properly label button in car

    Dec 30, 1988

    Dob violation - resolved

ECB violations · 21

  • Class - 2

    Observed failure to conduct or file a final inspection of permitted work for job # x08001736-i1-gc, conduct/file final inspection

    Oct 29, 2025

    Resolve
  • Class - 2

    1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess

    Feb 25, 2025

    Resolve
  • Class - 2

    Unapproved,unsafe,unsuitable electrical equipment apparatus materials devices appliances or wiring in use.extension cords used as permanent wiring in the boiler room.conduit not properly installed in the boiler

    Mar 4, 2019 · Penalty $800

    Resolve
  • Class - 2

    Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #808713. rmdy: submit required technical report.

    Oct 15, 2018

    Resolve
  • Class - 1

    Failure to maintain exterior bldg facade and appurtenance.noted:at thetime of inspection observe cracks/loose bricks,mortar /deteriorated juliet masonry balcony(set back)on 3rd fl.exposure#1,northwest&southwest

    Nov 18, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to maintain exterior bldg.north/west corner on exposure #2 hasvertical cracking.rem:maintain exterior bldg provide safety measures,repair & restore damaged facade as per 1rcny 103-04.

    Mar 19, 2014 · Penalty $250

    Resolve
  • Class - 2

    Following the receipt of a permit to erect a sidewalk shed the permit holder shall post a readily visible sign on the sidewalk shed. no signon shed. rem:comply with code.

    Jul 12, 2012

    Resolve
  • Class - 2

    Work without a permit. post no permit for sidewalk shed. rem:renew obtain & post permit of sidewalk shed.

    Jun 19, 2012 · Penalty $400

    Resolve
  • Class - 1

    Work without permit. work noted:at exposure 4 a stacked row of bricks felled from the 5th flr apart #5d to the sidewalk below. violation #34936724p was issued on 3-1-12 for the defect. violation states to obtai

    Mar 6, 2012 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. a row of stacked bricks from the 5th flr apartment #5d fellto city sidewalk. the work to restore or replace the row of stacked br

    Mar 6, 2012 · Penalty $2,400

    Resolve
Show 11 more ↓
  • Class - 1

    Failure to maintain exterior of building defect:there are approx 4 decorative ornamental pieces with defects. the lintels have rotted there are cracks missing mortar & they are in danger of collapse. the orname

    Mar 6, 2012 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to maintain exterior building. defect: at exposure 4,bricks have fallen from the 5th floor window. a row of stacked bricks on the exterior of the 5th fl apt #5d bathroom,has fallen on city sidewalk.

    Mar 1, 2012 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to file an acceptalbe sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.remed

    Apr 15, 2011 · Penalty $2,000

    Resolve
  • Class - 2

    Failure to maintain exterior bldg east elevation(exp#3)observe cracks & deterioating in lintel facade;step crack and displacement in facade sills;storage stored on fire escape landing)south elevation (exp#4)

    Mar 14, 2011 · Penalty $500

    Resolve
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic inspection of exterior walls & appurtenaces as required by article 28.302 & the dob rules & regulations.360107

    Jul 12, 2010 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations

    Nov 27, 2009 · Penalty $800

    Resolve
  • Class - 2

    Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules & regulations

    Feb 6, 2009 · Penalty $4,000

    Resolve
  • Non-hazardous

    Failure to provide a system of automatic spinklers where required found (2) commercial dryer with no sprinkler coverage over them remedy:provide automatic spinklers

    Jul 29, 2005 · Penalty $400

    Active
  • Non-hazardous

    Use of installation of plumbing materials or equipments which do not comply with rs-16 found (2) commercial dryer with flex hose on back of dryer.remedy:remove non-complying material or equipment

    Jul 29, 2005 · Penalty $400

    Active
  • Non-hazardous

    08v17l21l40u 17-l-no wire glass hoistway door's floors 4 thru 6-basement h/o. glass broken 40tag governor 5 yr test.

    Oct 27, 1997

    Resolve
  • Non-hazardous

    14m,22d,46b,50y,55i,57o 46)shorten hoist caldes 55)renew broken pit light.

    Apr 8, 1991 · Penalty $75

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Oct 8, 2026 · Apt 2D

    Close
  • Unsanitary condition

    Mold

    Sep 30, 2026 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Sep 30, 2026 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Jul 23, 2026 · Apt 5A

    Close
  • Water leak

    Slow leak

    Jul 23, 2026 · Apt 5A

    Close
  • Paint/plaster

    Wall

    Jul 9, 2026 · Apt 5A

    Close
  • Water leak

    Damp spot

    Jul 9, 2026 · Apt 5A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 19, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    May 19, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 19, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 11, 2026 · Apt BLDG

    Close
  • Appliance

    Electric/gas range

    Apr 10, 2026 · Apt 5F

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2026 · Apt 5A

    Close
  • Heat/hot water

    Apartment only

    Jan 13, 2026 · Apt 2D

    Close
  • Heat/hot water

    Apartment only

    Dec 19, 2025 · Apt 2D

    Close
  • Heat/hot water

    Apartment only

    Dec 5, 2025 · Apt 2D

    Close
  • Heat/hot water

    Apartment only

    Oct 16, 2025 · Apt 5A

    Close
  • Plumbing

    Water supply

    Oct 13, 2025 · Apt 5A

    Close
  • Heat/hot water

    Apartment only

    Oct 10, 2025 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Sep 22, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Sep 22, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Jun 25, 2025 · Apt 2D

    Close
  • Flooring/stairs

    Floor

    Jun 25, 2025 · Apt 2D

    Close
  • Electric

    Outlet/switch

    Jun 25, 2025 · Apt 2D

    Close
  • Electric

    Wiring

    Jun 25, 2025 · Apt 2D

    Close
  • General

    Cabinet

    Jun 25, 2025 · Apt 2D

    Close
  • Plumbing

    Basin/sink

    Jun 25, 2025 · Apt 2D

    Close
  • Flooring/stairs

    Floor

    Jun 25, 2025 · Apt 2D

    Close
  • Flooring/stairs

    Floor

    Jun 2, 2025 · Apt 2D

    Close
  • Flooring/stairs

    Floor

    Jun 2, 2025 · Apt 2D

    Close
  • Electric

    Outlet/switch

    Jun 1, 2025 · Apt 2D

    Close
  • Electric

    Lighting

    Jun 1, 2025 · Apt 2D

    Close
  • Electric

    Wiring

    Jun 1, 2025 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Mar 7, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 11, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2025 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Jan 10, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 5, 2025 · Apt 2J

    Close
  • General

    Cabinet

    Dec 20, 2024 · Apt 2D

    Close
  • Paint/plaster

    Ceiling

    Dec 4, 2024 · Apt 2D

    Close
  • Plumbing

    Radiator

    Dec 4, 2024 · Apt 2D

    Close
  • Paint/plaster

    Wall

    Dec 4, 2024 · Apt 2D

    Close
  • Door/window

    Door

    Dec 4, 2024 · Apt 2D

    Close
  • Electric

    Outlet/switch

    Dec 4, 2024 · Apt 2D

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1929
Floors
6
Residential units
59
Building area
54,115 ft²
Lot area
12,024 ft²
Zoning
R7-1
Community board
212
Council district
12
Block / lot
4820 / 28
Assessed value
$1,916,100
Landmark / historic district
No

HPD registration #209440, last renewed Aug 25, 2025.

Questions about 3950 Bronx Boulevard

Who owns 3950 Bronx Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is 224th Street Aparts.limited Liability Co Mpany.

Does 3950 Bronx Boulevard have violations?

Yes. NYC HPD has recorded 268 housing violations at this property.

Is 3950 Bronx Boulevard rent stabilized?

NYC Department of Finance tax bills listed 50 rent-stabilized units here in 2024 (about 85% of its 59 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 3950 Bronx Boulevard built?

City records list 1929 as the year it was built.

How many apartments are in 3950 Bronx Boulevard?

It has 59 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.