766 East 215 Street
Bronx, NY 10467BBL 2-04662-0056Map
Owner of record: Rose 215 LLC
766 East 215 Street is a walk-up apartment building built in 1928 in Bronx, 10467. It has 6 residential units across 3 floors. The owner of record is Rose 215 LLC. HPD has recorded 806 housing violations here, most recently on August 5, 2026. 14 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2019.
- HPD violations
- 806
- DOB violations
- 19
- ECB violations
- 3
- HPD complaints
- 869
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 806
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 2r, 1st story, 1st apartment from east at south
Aug 5, 2026 · Apt 2R
Open — Invalid certification - BHazardous
Properly repair the source and abate the evidence of a water leak at ceilingand north wall in the bathroom located at apt 2r, 1st story, 1st apartment from east at south
Aug 5, 2026 · Apt 2R
Open — Invalid certification - CImmediately hazardous
Properly repair with similar material the broken or defective 12th wooden baluster up from bottom at public hall stairs, 1st story
Jun 11, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective 3rd wooden baluster from east at south at public hall, 2nd story
Jun 11, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of electrical wiring at circuit breaker box in the foyer located at apt 2r, 1st story, 1st apartment from east at south
Jun 11, 2026 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 1st story, 1st apartment from east at south
Jun 11, 2026 · Apt 2R
Open — Not complied with - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures no power at all electrical fixtures (light switch and outlets) in the entire apartment located at apt 2r, 1st story, 1st apartment from east at south
Jun 11, 2026 · Apt 2R
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2r, 1st story, 1st apartment from east at south
Jun 11, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroom located at apt 2r, 1st story, 1st apartment from east at south
Jun 11, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 2r, 1st story, 1st apartment from east at south
Jun 11, 2026 · Apt 2R
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 2r, 1st story, 1st apartment from east at south
Jun 11, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of gabage cans at public hall, 3rd story
May 15, 2026
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective latch set and its assemblies at roof door at 1st public hall bulkhead from north, 3rd story
May 15, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at roof door at 1st public hall bulkhead from north, 3rd story
May 15, 2026
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft inside 1st and 2nd window casings at north wall in the 1st room from north at east located at apt 5, 3rd story, 1st apartment from south at west original violation 18849519 issued 03-may-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
May 3, 2026 · Apt 5
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sq inside window casing in the 1st room from north at west located at apt 5, 3rd story, 1st apartment from south at west original violation 18849516 issued 03-may-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
May 3, 2026 · Apt 5
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft inside window casing in the 2nd room from north located at apt 5, 3rd story, 1st apartment from south at west original violation 18849515 issued 03-may-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
May 3, 2026 · Apt 5
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5, 3rd story, 1st apartment from south at west
May 3, 2026 · Apt 5
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft inside 1st and 2nd window casings at north wall in the 1st room from north at east located at apt 5, 3rd story, 1st apartment from south at west
May 3, 2026 · Apt 5
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5, 3rd story, 1st apartment from south at west
May 3, 2026 · Apt 5
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5, 3rd story, 1st apartment from south at west
May 3, 2026 · Apt 5
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood sub flooring in the 1st room from north at east located at apt 5, 3rd story, 1st apartment from south at west
May 3, 2026 · Apt 5
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq inside window casing in the 1st room from north at west located at apt 5, 3rd story, 1st apartment from south at west
May 3, 2026 · Apt 5
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft inside window casing in the 2nd room from north located at apt 5, 3rd story, 1st apartment from south at west
May 3, 2026 · Apt 5
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at building entrance at public hall, 1st story
Apr 6, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall. in the bathroom located at apt 2r, 1st story, 1st apartment from east at south
Apr 6, 2026 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2r, 1st story, 1st apartment from east at south
Apr 6, 2026 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2r, 1st story, 1st apartment from east at south
Apr 6, 2026 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2r, 1st story, 1st apartment from east at south
Apr 6, 2026 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2r, 1st story, 1st apartment from east at south
Apr 6, 2026 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Dec 30, 2025 · Apt 1
Closed — Violation dismissed - ANon-hazardous
M/d law abate the nuisance consisting of vinyl flooring in the 2nd room from north located at apt 1, 1st story, 1st apartment from south at west
Dec 30, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lower sash window at west wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Dec 30, 2025 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Dec 30, 2025 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower inner glass pane at the west window in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Dec 18, 2025 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain glaze enamel at the bathtub in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Dec 18, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Dec 18, 2025 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Dec 18, 2025 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door to basement locked at 1st sty public hall. at boiler room
Nov 7, 2025
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance door hinge , 1st story
Nov 7, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Nov 7, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign present but, un-readable
Nov 3, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system lock door at boiler room
Nov 3, 2025
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6, 3rd story, 1st apartment from east at south
Nov 3, 2025 · Apt 6
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6, 3rd story, 1st apartment from east at south
Nov 3, 2025 · Apt 6
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6, 3rd story, 1st apartment from east at south
Nov 3, 2025 · Apt 6
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6, 3rd story, 1st apartment from east at south
Nov 3, 2025 · Apt 6
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wodden balster 25th up from bottom at public hall stairs, 1st story
Oct 26, 2025
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electricall wiring at south wall in the kitchen located at apt 2a, 2nd story, 1st apartment from east at south
Oct 1, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and assembly at building entrance door (street to vestibule) at public hall, 1st story
Oct 1, 2025
Closed — Violation closed
DOB building violations · 19
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 7, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
Show 9 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Apr 23, 1993
Dob violation - dismissed
ECB violations · 3
- Class - 2
Failure to maintain building in code compliant manner:fixture not properly vented.in apt #6 drain line for kitchen sink is not properly vented. remedy: properly vent fixtures.
Jul 17, 2015 · Penalty $250
Resolve - Class - 1
Failure to maintain building in code compliant manner.i observed at 2:30pm in all apt's gas lines left open not plugged off.gas meter's inside bathrooms.gas main still connected.no protection from any amount of
Jul 17, 2015 · Penalty $1,000
Resolve - Non-hazardous
Replace safty value with asme type side blow down install check value (back flow preventer
Jul 6, 2001 · Penalty $2,500
Resolve
Complaints
- Electric
No lighting
Jun 5, 2026 · Apt 2R
Close - Paint/plaster
Ceiling
Jun 5, 2026 · Apt 2R
Close - Water leak
Slow leak
Jun 5, 2026 · Apt 2R
Close - Heat/hot water
Entire building
May 6, 2026 · Apt 1
Close - Door/window
Door
May 1, 2026 · Apt 5
Close - Outside building
Roof door/hatch
May 1, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
May 1, 2026 · Apt 6
Close - Door/window
Door
May 1, 2026 · Apt 6
Close - Plumbing
Water supply
May 1, 2026 · Apt 6
Close - Unsanitary condition
Pests
May 1, 2026 · Apt 5
Close
Show 40 more ↓
- Unsanitary condition
Mold
May 1, 2026 · Apt 5
Close - Unsanitary condition
Mold
May 1, 2026 · Apt 5
Close - Heat/hot water
Apartment only
May 1, 2026 · Apt 5
Close - Heat/hot water
Apartment only
May 1, 2026 · Apt 5
Close - Safety
Window guard broken/missing
May 1, 2026 · Apt 4
Close - Safety
Window guard broken/missing
May 1, 2026 · Apt 4
Close - Heat/hot water
Apartment only
May 1, 2026 · Apt 4
Close - Safety
Window guard broken/missing
May 1, 2026 · Apt 4
Close - Door/window
Door
May 1, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
May 1, 2026 · Apt 5
Close - Unsanitary condition
Pests
May 1, 2026 · Apt 4
Close - Door/window
Door
May 1, 2026 · Apt 4
Close - Heat/hot water
Entire building
Apr 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 4, 2026 · Apt BLDG
Close - Safety
Fire escape
Mar 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt 1
Close - Water leak
Slow leak
Feb 17, 2026 · Apt 2R
Close - Water leak
Slow leak
Feb 6, 2026 · Apt 2R
Close - Flooring/stairs
Floor
Feb 6, 2026 · Apt 2R
Close - Paint/plaster
Ceiling
Feb 6, 2026 · Apt 2R
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt 1
Close - Door/window
Window pane
Dec 16, 2025 · Apt 1
Close - Plumbing
Bathtub/shower
Dec 16, 2025 · Apt 1
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt 4
Close - Heat/hot water
Entire building
Nov 5, 2025 · Apt 1
Close - Heat/hot water
Entire building
Nov 2, 2025 · Apt 1R
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt 6
Close - Heat/hot water
Entire building
Oct 25, 2025 · Apt 2S
Close - Heat/hot water
Entire building
Oct 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt 1R
Close - Safety
Carbon monoxide detector
Aug 13, 2025 · Apt 6
Close - Unsanitary condition
Mold
Aug 13, 2025 · Apt 5
Close - Safety
Carbon monoxide detector
Aug 13, 2025 · Apt 5
Close - Unsanitary condition
Pests
Aug 13, 2025 · Apt 6
Close - Unsanitary condition
Pests
Aug 13, 2025 · Apt 6
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1928
- Floors
- 3
- Residential units
- 6
- Building area
- 4,875 ft²
- Lot area
- 3,125 ft²
- Zoning
- R6A
- Community board
- 212
- Council district
- 12
- Block / lot
- 4662 / 56
- Assessed value
- $538,200
- Landmark / historic district
- No
HPD registration #216586, last renewed Oct 22, 2025.
Questions about 766 East 215 Street
Who owns 766 East 215 Street?
The owner of record in NYC Department of City Planning PLUTO data is Rose 215 LLC.
Does 766 East 215 Street have violations?
Yes. NYC HPD has recorded 806 housing violations at this property.
Is 766 East 215 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2019 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 766 East 215 Street built?
City records list 1928 as the year it was built.
How many apartments are in 766 East 215 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.