East 211th Street

Bronx, NY 10467BBL 2-04657-0001Map

Owner of record: Gunhill Bh LLC

East 211th Street is an elevator apartment building built in 2022 in Bronx, 10467. It has 134 residential units across 8 floors. The owner of record is Gunhill Bh LLC. HPD has recorded 47 housing violations here, most recently on July 23, 2025. 2 of the 47 most recent violations are still open. City tax records listed 134 rent-stabilized apartments here in 2024.

HPD violations
47
DOB violations
4
ECB violations
39
HPD complaints
85

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jul 23, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
134
About 100% of the building's 134 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 47

  • B

    Trace and repair the source and abate the visible mold condition... less than 10sq.ft at ceiling in the 2nd room from east located at apt 2b, 2nd story, 7th apartment from north at east original violation 18111404 issued 23-jul-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Jul 23, 2025 · Apt 2B

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 2b, 2nd story, 7th apartment from north at east

    Jul 23, 2025 · Apt 2B

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 2b, 2nd story, 7th apartment from north at east

    Jul 23, 2025 · Apt 2B

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq.ft at ceiling in the 2nd room from east located at apt 2b, 2nd story, 7th apartment from north at east

    Jul 23, 2025 · Apt 2B

    Closed — Violation closed
  • C

    Remove the illegal fastening consisting of key operated lock installed on north and south bulkhead door leading to roof , 8th story

    May 1, 2025

    Closed — Violation closed
  • B

    Provide handset and unobstructed on north and south bulkhead roof door that allow re-entry from roof to public hall, 8 story , 8th story

    May 1, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2q, 2nd story, 1st apartment from east at south

    Apr 29, 2025 · Apt 2Q

    Closed — Violation dismissed
  • C

    Properly secure the loose ceiling light fixture in the bathroom located at apt 3q, 3rd story, 1st apartment from east at south

    Apr 29, 2025 · Apt 3Q

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 3q, 3rd story, 1st apartment from east at south

    Apr 29, 2025 · Apt 3Q

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6q, 6th story, 1st apartment from east at south

    Apr 29, 2025 · Apt 6Q

    Closed — Violation dismissed
Show 37 more ↓
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 2t, 2nd story, 1st apartment from west at north

    Apr 24, 2025 · Apt 2T

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 2t, 2nd story, 1st apartment from west at north

    Apr 24, 2025 · Apt 2T

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at north located at apt 2t, 2nd story, 1st apartment from west at north

    Apr 24, 2025 · Apt 2T

    Closed — Violation dismissed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at north located at apt 2t, 2nd story, 1st apartment from west at north

    Apr 24, 2025 · Apt 2T

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective bell and buzzer/return intercom system from vestibule to the pannel at wall in the foyer located at apt 6r, 6th story, 2nd apartment from west at north

    Apr 24, 2025 · Apt 6R

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective bell and buzzer/return intercom system from vestibule to pannel at wall in the entrance located at apt 3t, 3rd story, 1st apartment from west at north

    Apr 24, 2025 · Apt 3T

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing sign at public hall, 1st story

    Mar 24, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch set at door at compactor closet, 2nd story

    Mar 24, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at door at compactor closet, 2nd story

    Mar 24, 2025

    Closed — Violation closed
  • I

    Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts # 6q under vacate order 259357, posted 3/14/2025 in the entire apartment located at apt, 6th story, 1st apartment from east at south

    Mar 14, 2025

    Closed — Violation closed
  • I

    Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts # 5q under vacate order 259357, posted 3/14/2025 in the entire apartment located at apt, 5th story, 1st apartment from east at south

    Mar 14, 2025

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3q, 3rd story, 1st apartment from east at south

    Mar 4, 2025 · Apt 3Q

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 3q, 3rd story, 1st apartment from east at south

    Mar 4, 2025 · Apt 3Q

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling and wall outlets in the 3rd room from east located at apt 3q, 3rd story, 1st apartment from east at south

    Mar 4, 2025 · Apt 3Q

    Closed — Violation closed
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at celing (missing light fixture) in the 2nd room from east located at apt 3q, 3rd story, 1st apartment from east at south

    Mar 4, 2025 · Apt 3Q

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 3t, 3rd story, 1st apartment from west at north

    Mar 4, 2025 · Apt 3T

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from east located at apt 3t, 3rd story, 1st apartment from west at north

    Mar 4, 2025 · Apt 3T

    Closed — Violation closed
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the 2nd room from east located at apt 3t, 3rd story, 1st apartment from west at north

    Mar 4, 2025 · Apt 3T

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3q, 3rd story, 1st apartment from east at south

    Mar 4, 2025 · Apt 3Q

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 5q, 5th story, 1st apartment from east at south

    Mar 4, 2025 · Apt 5Q

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 5r, 5th story, 2nd apartment from west at north

    Mar 4, 2025 · Apt 5R

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5r, 5th story, 2nd apartment from west at north

    Mar 4, 2025 · Apt 5R

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the floor in the 1st room from east located at apt 6r, 6th story, 2nd apartment from west at north

    Mar 4, 2025 · Apt 6R

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective bell buzzer intercom system at south wall in the foyer located at apt 6r, 6th story, 2nd apartment from west at north

    Mar 4, 2025 · Apt 6R

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 5m, 5th story, 5th apartment from south at west

    Mar 4, 2025 · Apt 5M

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 2q, 2nd story, 1st apartment from east at south

    Mar 4, 2025 · Apt 2Q

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2q, 2nd story, 1st apartment from east at south

    Mar 4, 2025 · Apt 2Q

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures and oulets in the 2nd room from east located at apt 2q, 2nd story, 1st apartment from east at south

    Mar 4, 2025 · Apt 2Q

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 6q, 6th story, 1st apartment from east at south

    Mar 4, 2025 · Apt 6Q

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6t, 6th story, 1st apartment from west at north

    Oct 15, 2024 · Apt 6T

    Closed — Violation dismissed
  • C

    Provide a safe and adequate supply of electric service to the fixtures at all walls and ceilings throughout in the entire apartment located at apt 8j, 8th story, 1st apartment from east at south

    Sep 12, 2024 · Apt 8J

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 8j, 8th story, 1st apartment from east at south

    Sep 12, 2024 · Apt 8J

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective bell and buzzer intercom return intercom system vestibule to in the foyer located at apt 2q, 2nd story, 1st apartment from north at east

    Aug 22, 2024 · Apt 2Q

    Open — Not complied with
  • C

    Provide ready access to buildings heating system door locked at boiler room

    May 28, 2024

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2n, 2nd story, 1st apartment from north at east

    May 28, 2024 · Apt 2N

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective door lock and assembly at vestibule to public hall , 1st story

    May 28, 2024

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 18, 2024

    Closed — Violation dismissed

DOB building violations · 4

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2023

    Dob violation - dismissed

ECB violations · 39

  • Class - 2

    Observed on the roof standing water is not draining towards the roof drain. fire stopping is missing around pipe penetrations into mechanical room. laundry room sink piping lack escutcheons. first floor bathroo

    Jan 9, 2026

    Resolve
  • Class - 2

    Observed throughout the building sprinkler heads obstructed. in basement using pvc waste which is contrary to code section bc 903.3.3 and pc 1101.10, repair and/or replace

    Jan 9, 2026

    Resolve
  • Class - 1

    Class 1 cease use item: door zone restrictor inoperative. this is a safety feature which ensures passenger safety. remedy: to restore service, email the d.o.b. [email protected]. for a reinspection. class 2

    Jan 5, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. found gas leak behind the dryers on floors 6 and 4 in laundry rooms. co ed pin and shut off gas to laundry room riser., repair and/or replace

    Apr 15, 2025

    Resolve
  • Class - 1

    Upon my request to see training for confined space, foreman statement no training. permitholder failed to provide required training for workers before the entry to confined space (1910.146 b). no understanding,

    May 15, 2023 · Penalty $12,500

    Resolve
  • Class - 1

    Permitholder failed to informed workers about the working conditions, hazardous and not arranging adequate supervision for the operation creating an immediate hazardous and causing injuries.stop all hot work an

    May 15, 2023 · Penalty $12,500

    Resolve
  • Class - 1

    Permitholder failed to safeguard property causing damage as starting fire in detention tank and smoke spread around the area creating an immediate hazardous and causing injuries of burning and suffocation.stop

    May 15, 2023

    Resolve
  • Class - 1

    Permitholder failed to comply as manufacturer specification, warning of materials are flammable, however the contractor exposed the materials to igniting source make fire occurred and creating an immediate haza

    May 15, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Upon my request to review the fdny permit for generator, they submitted expired permit on 2-13-2023 in contrary with code3303.4.6 storage of combustible material and equipment. the permitholder failed to comply

    May 15, 2023 · Penalty $625

    Resolve
  • Class - 1

    At time of inspection of nb 8 story active jobsite observed workers on jobsite upon request from workers to see the sst cards it was observed 2 workers( german a villatoro benitez, angel cardona) card provided

    Apr 12, 2023 · Penalty $2,500

    Resolve
Show 29 more ↓
  • Class - 1

    At time of inspection of nb 8 story building active jobsite observed workers performing work at elevator machine room which leads to elevator shaft, without tied off, inadequate guardrail system or caz, this co

    Apr 12, 2023 · Penalty $5,000

    Resolve
  • Class - 1

    At the time of the inspection 8 stories nb i observed building over 75 feet high no ssp provided reflect existing condition on site to reflect building above 75' .observed shed on street need to provide wood ba

    Mar 14, 2023

    Resolve
  • Class - 1

    At the time of inspection 8 stories nb i observed stand pipe reached to the roof and when i request the hydrostatic pressure test since the building reached over 75 feet as per architectural approved drawing r

    Mar 14, 2023 · Penalty $5,000

    Resolve
  • Class - 2

    At the time of inspection 8 stories new building i observed the elevators not working as still in installation process and building over 75 feet.stop all work above 75 feet no work above 7 fl level provide elev

    Mar 14, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    At the time of inspection 8 stories nb i observed deliveries trucks with sheetrock at exp#3 and the window open and workers handling materials from the opening on 3rd floor not tied off to any anchors location

    Mar 14, 2023 · Penalty $625

    Resolve
  • Class - 2

    At the time of inspection 8 stories nb i observed two delivery truck loaded with sheetrock and blocking e211 street that between holland ave & white plains rd after search on dot website no permit for blocking

    Mar 14, 2023 · Penalty $625

    Resolve
  • Class - 1

    At the time of inspection 8 stories nb i observed workers on site didn't receive orientation i requested the orientations for these workers temur latauri, besarion tadumadze, nino zejnilovic,telmurez kapanadze,

    Mar 14, 2023

    Resolve
  • Class - 2

    At the time of inspection 8 stories nb i observed a lot of garbage bags in some floors and mason debris in the basement and alot debris in rear back at exp#3,4. provide housekeeping all over the building interi

    Mar 14, 2023 · Penalty $625

    Resolve
  • Class - 2

    At the time of inspection 8 stories nb i observed magni machine stand on concrete roof slab of the garage about 52800lb on the slab and when we request the load imposed letter by pe to make sure the stabilize o

    Mar 14, 2023 · Penalty $625

    Resolve
  • Class - 2

    At time of inspection, observed a construction site open and unlawfully working against stop work order. at 8 floor level observed approx. 30 mason workers installing cmu block work on leading edge. violation 1

    Dec 19, 2022

    Resolve
  • Class - 1

    At time of inspection, observed at 8 floor approx. 30 mason workers currently installing cmu block wall at leading edge. partial stop work order was issued on 12-14-2022 complaint number 2357300 which states n

    Dec 19, 2022 · Penalty $5,000

    Resolve
  • Class - 1

    At time of inspection, observed a supported scaffold at exp. 1, 3 and 4. during inspection observed excessive debris on multiple levels and exposures, including mortar waste, bricks, planks and supported scaffo

    Dec 16, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    At time of inspection, observed inadequate housekeeping on different levels of the site specially on top floor. no safe path for egress for workers tripping hazards everywhere. debris pile up, flammable materia

    Dec 16, 2022

    Resolve
  • Class - 1

    At time of inspection, at different floor and exposures inadequate guardrail system, including missing toe boards, mid rails and netting. at exposure 2 they have a delivery area with unenclosed perimeters and i

    Dec 16, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    At time of inspection on proposed 8 story nb active jobsite under construction, i observed workers performing const activities on 8th fl level with no elevator in the state of readiness and upon request for fdn

    Dec 14, 2022

    Resolve
  • Class - 2

    At the time of inspection on proposed 8 story nb active jobsite , i observed temp steel post as shoring, not adequately secured and used in supporting concrete beam at exp#-3 entrance & at multiple locations on

    Dec 14, 2022 · Penalty $620

    Resolve
  • Class - 2

    At time of inspection on proposed 8 story nb active jobsite, i observed on 8th fl level with workers performing floor deck & cmu block wall installation with body harnesses, not tie-back, no anchor point & no p

    Dec 14, 2022

    Resolve
  • Class - 2

    At time of inspection on proposed 8 story nb active jobsite, i observed in place on 7th to 8th fl level used structural steel stairway not maintained-missing in-filled wood planks in stair treads & inadequate g

    Dec 14, 2022 · Penalty $1,280

    Resolve
  • Class - 1

    At time of inspection on proposed 8 story nb active jobsite, i observed welder by name francisco a. lantigua performing welding ops on 8th fl joist, upon request for required issued dob welder license or certif

    Dec 14, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    At time of inspection on proposed 8 story nb active jobsite, i observed pipe scaffold installed on steel-i beam spaning across sws with the use of 2feet modified scaffold frame in place at exp#-1 close to corne

    Dec 14, 2022 · Penalty $1,280

    Resolve
  • Class - 2

    Failure to maintain documents/ orientation as per 3301.11.4maintain documents/ stop all work except installation of sidewalk shed, back fill exposure #2 and maintain construction fence.

    Aug 17, 2022

    Resolve
  • Class - 2

    Construction fence not maintained, panels missing exposure #2maintain construction fence

    Aug 17, 2022 · Penalty $500

    Resolve
  • Class - 1

    Work does not conform to approved plans at time of inspection observedat active jobsite of a proposed 8 story nb.during inspection noted that the excavation work does not conform to the soe approved plans.soe p

    Jul 5, 2022 · Penalty $625

    Resolve
  • Class - 1

    Bc 3301.2 unsafe gas line.at time of inspection observed an active jobsite of a proposed 8 story nb.during inspection noted that the gas line of the adjoining property runs on the construction site where it is

    Jul 5, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Bc 1704.1.1 statement of responsibility tr1 not filed at time of inspection observed an active jobsite of a proposed 8 story nb.during inspection after search on bis noted that there is no tr-1 for adjoining pr

    Jul 5, 2022

    Resolve
  • Class - 1

    Unlawfully continued work while on notice of a stop work order.at timeof inspection observed an active jobsite of a proposed 8 story bldg atfoundation stage.during inspection after comparing previous photos wit

    Jul 5, 2022 · Penalty $5,000

    Resolve
  • Class - 1

    Construction superintendent failed to perform duties per code.at time of inspection noted an active jobsite of a proposed 8 story nb,during inspection noted that the construction superintendent failed to perfor

    Jul 5, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    Work contrary to approved documents:on exposure 2 at cellar level rear on foundation area for adjoint property not maintained a 45 gradus as per soe plan required .provide maintain 45 gradus on excavation as

    Jun 22, 2022

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping for section requirements.at time of inspection i observed active site with competent person onsiteupon inspection was noted a pile of construction debris as garbage cre

    May 25, 2022

    Resolve

Complaints

  • Electric

    Lighting

    Oct 7, 2026 · Apt 2N

    Open
  • Water leak

    Damp spot

    Oct 7, 2026 · Apt 2N

    Open
  • Heat/hot water

    Entire building

    Mar 15, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 7, 2026 · Apt 7O

    Close
  • Heat/hot water

    Apartment only

    Feb 28, 2026 · Apt 7O

    Close
  • Heat/hot water

    Entire building

    Feb 28, 2026 · Apt 5R

    Close
  • Heat/hot water

    Apartment only

    Feb 27, 2026 · Apt 5R

    Close
  • Safety

    Smoke detector

    Feb 10, 2026 · Apt 3T

    Close
  • Safety

    Carbon monoxide detector

    Feb 10, 2026 · Apt 3T

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 7R

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Jan 28, 2026 · Apt 7R

    Close
  • Heat/hot water

    Apartment only

    Jan 28, 2026 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 4Q

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt 7T

    Close
  • Heat/hot water

    Apartment only

    Jan 24, 2026 · Apt 7O

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2026 · Apt 7O

    Close
  • Heat/hot water

    Apartment only

    Dec 20, 2025 · Apt 7O

    Close
  • Heat/hot water

    Apartment only

    Dec 10, 2025 · Apt 70

    Close
  • Door/window

    Door

    Nov 16, 2025 · Apt 6N

    Close
  • Paint/plaster

    Ceiling

    Nov 12, 2025 · Apt 4G

    Close
  • Unsanitary condition

    Pests

    Nov 10, 2025 · Apt 6N

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 23, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2025 · Apt 7B

    Close
  • Electric

    Wiring

    Sep 8, 2025 · Apt 2N

    Close
  • Water leak

    Damp spot

    Sep 8, 2025 · Apt 2N

    Close
  • General

    Ventilation system

    Sep 8, 2025 · Apt 2N

    Close
  • Electric

    Outlet/switch

    Sep 8, 2025 · Apt 2N

    Close
  • Unsanitary condition

    Mold

    Sep 8, 2025 · Apt 2N

    Close
  • Paint/plaster

    Wall

    Sep 8, 2025 · Apt 2N

    Close
  • Electric

    Wiring

    Jul 26, 2025 · Apt 8K

    Close
  • Paint/plaster

    Ceiling

    Jul 23, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Jul 23, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Jul 20, 2025 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Jun 1, 2025 · Apt 8K

    Close
  • General

    Cabinet

    Jun 1, 2025 · Apt 8K

    Close
  • Paint/plaster

    Ceiling

    Jun 1, 2025 · Apt 8K

    Close
  • General

    Bell/buzzer/intercom

    Jun 1, 2025 · Apt 8K

    Close
  • General

    Bell/buzzer/intercom

    May 3, 2025 · Apt 4Q

    Close
  • General

    Bell/buzzer/intercom

    Mar 27, 2025 · Apt 3T

    Close
  • Safety

    Carbon monoxide detector

    Mar 3, 2025 · Apt 5Q

    Close
  • Safety

    Smoke detector

    Mar 3, 2025 · Apt 5Q

    Close
  • Unsanitary condition

    Mold

    Mar 3, 2025 · Apt 5Q

    Close
  • Appliance

    Refrigerator

    Mar 3, 2025 · Apt 5Q

    Close
  • Water leak

    Heavy flow

    Mar 3, 2025 · Apt 5Q

    Close
  • Water leak

    Damp spot

    Mar 3, 2025 · Apt 4Q

    Close
  • Appliance

    Refrigerator

    Mar 3, 2025 · Apt 4Q

    Close
  • Electric

    Outlet/switch

    Mar 3, 2025 · Apt 4Q

    Close
  • Heat/hot water

    Apartment only

    Mar 3, 2025 · Apt 4Q

    Close
  • Paint/plaster

    Wall

    Mar 3, 2025 · Apt 5Q

    Close
  • Electric

    Wiring

    Mar 3, 2025 · Apt 5Q

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
2022
Floors
8
Residential units
134
Building area
116,515 ft²
Lot area
17,836 ft²
Zoning
R7A
Community board
212
Council district
12
Block / lot
4657 / 1
Assessed value
$7,088,850
Landmark / historic district
No

HPD registration #228862, last renewed Jul 15, 2025.

Questions about East 211th Street

Who owns East 211th Street?

The owner of record in NYC Department of City Planning PLUTO data is Gunhill Bh LLC.

Does East 211th Street have violations?

Yes. NYC HPD has recorded 47 housing violations at this property.

Is East 211th Street rent stabilized?

NYC Department of Finance tax bills listed 134 rent-stabilized units here in 2024 (about 100% of its 134 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was East 211th Street built?

City records list 2022 as the year it was built.

How many apartments are in East 211th Street?

It has 134 residential units and 135 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.