2260 Bronx Park East
Bronx, NY 10467BBL 2-04340-0001Map
Owner of record: Holland Industries LLC
2260 Bronx Park East is an elevator apartment building built in 1938 in Bronx, 10467. It has 49 residential units across 6 floors. The owner of record is Holland Industries LLC. HPD has recorded 220 housing violations here, most recently on October 21, 2026. 43 of the 50 most recent violations are still open. City tax records listed 49 rent-stabilized apartments here in 2024.
- HPD violations
- 220
- DOB violations
- 33
- ECB violations
- 20
- HPD complaints
- 406
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 220
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet door at public hall, 1st story
Oct 21, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch and its assembly at compactor closet door at public hall, 1st story
Oct 21, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of black tarp at 2nd balcony from north at west exterior wall at fire escape, 2nd story
Oct 21, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 6th story
Sep 22, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective escutcheon plate at top of heat riser pipe in the kitchen located at apt 6a, 6th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 6a, 6th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 6a, 6th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6a, 6th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... observed 14 sq ft of mold at ceiling east and north walls in the bathroom located at apt 6a, 6th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 6A
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at east located at apt 6a, 6th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 6A
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at east located at apt 6a, 6th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from north located at apt 6a, 6th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Replace with new the missing wood sink base cabinet in the kitchen located at apt 6a, 6th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 1st room from north located at apt 6a, 6th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 6A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5g, 5th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 5G
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective poreclain enamel finish by method of reglazing at bathtub in the bathroom located at apt 5g, 5th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 5G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th story
Sep 22, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5g, 5th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 5G
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5g, 5th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 5G
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 5g, 5th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 5G
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6a, 6th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 6A
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective latch set and assembly at door from street to vestibule , 1st story
Jun 25, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door from street to vestibule , 1st story
Jun 25, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set and assembly at door at compactor closet, 1st story
Jun 12, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door from vestibule to public , 1st story
Jun 12, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch at door from street to vestibule , 1st story
Jun 12, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door from street to vestibule , 1st story
Jun 12, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mailbox and key for apartment 6e at north wall , 1st story
Jun 2, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges , 1st story
Jun 2, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at door at compactor closet, 1st story
May 9, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 1st story
May 9, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet door at public hall, 3rd story
Jan 15, 2026
Open — Nov sent out - CImmediately hazardous
Replace with new the missing compactor chute door at public hall, 2nd story
Jan 15, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor closet door at public hall, 2nd story
Jan 15, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet door at public hall, 1st story
Jan 15, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at meter room door located at cellar at 1st meter room from north at west
Jan 15, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet door at public hall, 5th story
Jan 15, 2026
Closed — Violation closed - BHazardous
Replace with new the missing latch and assemblys at door at compactor closet, 1st story
Dec 30, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door at compactor closet, 1st story
Dec 30, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective latch locks at 1st fire escape window from north at east wall in the 1st room from north located at apt 4e, 4th story, 2nd apartment from north at east
Dec 30, 2025 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cracked and erroded wood around hinges in the 1st room from north located at apt 4e, 4th story, 2nd apartment from north at east
Dec 30, 2025 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cracked and buckling wood floor in the 2nd room from north located at apt 4e, 4th story, 2nd apartment from north at east
Dec 30, 2025 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cracked rubber gaskets at refrigerator in the kitchen located at apt 4e, 4th story, 2nd apartment from north at east
Dec 30, 2025 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlets at east and north wall in the kitchen located at apt 4e, 4th story, 2nd apartment from north at east
Dec 30, 2025 · Apt 4E
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective countertop at sink in the kitchen located at apt 4e, 4th story, 2nd apartment from north at east
Sep 22, 2025 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east, south, and west walls in the 4th room from north located at apt 4e, 4th story, 2nd apartment from north at east
Sep 22, 2025 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling approx. 60 sq ft in the 4th room from north located at apt 4e, 4th story, 2nd apartment from north at east
Sep 22, 2025 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective inoperable electrical outlets at east and north walls in the kitchen located at apt 4e, 4th story, 2nd apartment from north at east
Sep 22, 2025 · Apt 4E
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt 4e, 4th story, 2nd apartment from north at east
Sep 22, 2025 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective mortise door lock and assembly in the entrance located at apt 4e, 4th story, 2nd apartment from north at east
Sep 22, 2025 · Apt 4E
Open — Nov sent out
DOB building violations · 33
- Construction other optional
Apt 6d fire, smoke and water damage to apt, with roof fully open from fire & water damage to all apt on d line of building. partial vacate order for full d line of apt's from basement to 6th floor.
Aug 8, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 22, 2025
Dob violation - active - Construction other optional
Partial vacate order due to the unsafe conditions at exp#2 (north) & exp#3 (east). observed cracked/displaced brick masonry and cracked/ loose brick masonry at multiple locations. remedy: vacated courtyards at exposures #2 - north and 3-east to be used in emergencies only
Oct 10, 2024
Dob violation - active - Construction other optional
Emergency work order due to cracked brick/mortar joints @ exp1 west, #3 east, #3 south mult. loc & cracked brick @ chimney.these conditions hazard to the public. remedy:immediately tkae & provide adequate safe measures to secure & protect the public.additionally make immediate repairs under superv of lp & make facade safe as per ircny(03-04)
Sep 25, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2020
Jun 20, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2019
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 17, 2019
Dob violation - active
Show 23 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Nov 8, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 13, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 16, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 22, 2014
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 6, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 4, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Mar 4, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 6, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 7, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 14, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2004
Dob violation - resolved - Elevator elevatorrequired
2p1859
Aug 9, 2002
Dob violation - resolved - Elevator elevatorrequired
2p1859
Nov 19, 2001
Dob violation - resolved - Elevator elevatorrequired
(51) install hall button wires in elevator conduit or greenfield (52) eliminate excessive play car and rails
Nov 18, 1988
Dob violation - resolved
ECB violations · 20
- Class - 1
Cease use item: door zone restrictor inoperative. this is a safety feature which ensures passenger safety. remedy: to restore service, email the d.o.b. [email protected]. elevator division at for a reinspec
Nov 10, 2025 · Penalty $1,280
Resolve - Class - 1
Failure to maintain exterior building walls and appurtenances. as noted: at the time of inspection and observed on exposure #1, 3 and 4 damahed, broken window sills at multiple floors and crack mortar joints at
Nov 22, 2024 · Penalty $2,500
Active - Class - 1
Failure to maintain exterior bldg facade and appurtenances.note:at time of inspection i observed cracked brick multi loc at exp#1 west cy setback,exp#4 south cracked brick/mortar joints at southwest corner mult
Sep 25, 2024 · Penalty $2,500
Active - Class - 2
Misaligned cab mirror. missing in case of fire signs. label hoistway doors where needed. expired brake maintenance tag. provide current maintenance log. unreadable main line fuses. seal hoist machine leaks. unl
Apr 23, 2024 · Penalty $3,125
Active - Class - 2
Failure to comply with the commissioner"s order contained in nov# 35081521k issued 3/4/14 and to file a certificate of correction pursuant to 28-201.1, 28-204.4 and 1rcny 102-01. noted: at 6th fl exp #4 brick
May 3, 2016 · Penalty $2,000
Resolve - Class - 2
Failure to provide approved/accepted plans at jobsite at time of inspection for alt ii job #220380488-work to include gas fired generator. contact pro-cert unit @ queens borough hall @ (718) 286-0683 remedy pro
May 19, 2015 · Penalty $2,500
Resolve - Class - 2
Sidewalk shed parapet sign panel not in compliance w/section.noted:at time of inspection sidewalk shed parapet sign panel does not contain 1-the street address of the site; 2-name of the contractor responsible
Dec 26, 2014 · Penalty $400
Resolve - Class - 2
Temporary construction equipment on site-expired permit.noted: at timeof inspection permit for sidewalk shed at exp#1 and #4 expired on 7/26/96. recurring condition previous vio #35100669h issued on 10/22/14.rm
Dec 26, 2014 · Penalty $800
Resolve - Class - 2
Failed to obtain a temporary const. permit prior to installation/ use of side-walk shed. at west & south elevations (exposure 1&4) installedapprox 239 linear feet of sidewalk shed. w/o a sidewalk shed permit
Oct 29, 2014
Resolve - Class - 2
Sidewalk shed parapit panel not in compliance with section.noted:@ time of insp sidewalk shed parapet panel does not contain.the street address of the sight 2 name of the contractor responsible for the site or
Oct 22, 2014 · Penalty $800
Resolve
Show 10 more ↓
- Class - 2
Temporary construction equipment on site expired permit.noted:@ time of inspection sidewalk shed on exp1 & exp4 permit expired on 7/26/96 rem:renew all required permits comply with code
Oct 22, 2014 · Penalty $800
Resolve - Class - 2
Sidewalk shed does not meet code specifications.note:sidewalk shed installed & in use @ exp #1 & #4.no light fixtures have been installed;no contractor/jobsite signage in place on shed parapet.rem:conform to co
Mar 17, 2014 · Penalty $10,000
Resolve - Class - 2
Fail obtain temporary const permit prior to install/use sidewalk shed.note:sidewalk shed in place @exp #1 & exp #4 w/o a valid dob permit.rem:obtain permit/comply w/code.
Mar 17, 2014 · Penalty $2,500
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. noted: at 6th flr exp #4 brick fell from bldg affected area approx 2' x 1' that was dislodged, defects are loose, missing brickwork along w/cracks, bulging
Mar 4, 2014 · Penalty $5,000
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances noted @ time of inspection elevation northern most fire escape missing terra cotta coping stone in 2 areas southwest corner @ 6th fl lintel above window dislodged
Feb 9, 2010 · Penalty $1,000
Resolve - Non-hazardous
83#* restore to service so full insp can be made by this dept.
Oct 8, 2003 · Penalty $2,500
Resolve - Hazardous
83## cease use. fires destroyed elevator. elevator and counterweights must be hung get slack in ropes. do no more elevator until new ropes are installed and only to start work. do not return to service until
Jul 20, 2003
Resolve - Non-hazardous
03m7,05j11,21l11,15l11,28l11,53x11,57o2,5j11-too much gap to post15l11-slams1&3fls.28l11-pack
Apr 20, 2000
Resolve - Non-hazardous
8v1, 35m6, 31d6, 52d6, 50d6, 51y14, 52#1, 57o2, 46b13, 25f1. window glass missing inproper venting. wiring box use cover. properly secure all pins.
Oct 21, 1997 · Penalty $1,000
Resolve - Hazardous
Ain ure to maintain exterior bldg wall hazardous defect is at 5th floor north of entrace brick corner between windows is missing on side walk below walls at various llocation is cracked buldged remedy provide
Jul 23, 1995 · Penalty $350
Resolve
Complaints
- Heat/hot water
Entire building
Oct 22, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Sep 28, 2026 · Apt 66
Close - General
Cabinet
Aug 28, 2026 · Apt 6A
Close - Water leak
Damp spot
Aug 28, 2026 · Apt 6A
Close - Paint/plaster
Ceiling
Aug 28, 2026 · Apt 6A
Close - Water leak
Heavy flow
Aug 28, 2026 · Apt 6A
Close - Appliance
Electric/gas range
Aug 17, 2026 · Apt 5G
Open
Show 40 more ↓
- Appliance
Electric/gas range
Jul 20, 2026 · Apt 5G
Close - Appliance
Refrigerator
Jun 11, 2026 · Apt 3H
Close - General
Mailbox
Jun 3, 2026 · Apt LOBBY
Close - Appliance
Electric/gas range
Jun 3, 2026 · Apt 3F
Close - Door/window
Door
May 20, 2026 · Apt BLDG
Close - Door/window
Door
May 9, 2026 · Apt BLDG
Close - General
Mailbox
May 5, 2026 · Apt 6E
Close - Appliance
Refrigerator
Apr 20, 2026 · Apt APT3D
Open - General
Mailbox
Apr 19, 2026 · Apt 1G
Close - Door/window
Window frame
Feb 4, 2026 · Apt 4B
Close - Plumbing
Bathtub/shower
Feb 4, 2026 · Apt 4B
Close - Plumbing
Bathtub/shower
Feb 4, 2026 · Apt 4B
Close - Unsanitary condition
Pests
Feb 4, 2026 · Apt 4B
Close - Door/window
Window frame
Feb 4, 2026 · Apt 4B
Close - General
Cabinet
Feb 4, 2026 · Apt 4B
Close - Door/window
Door
Feb 4, 2026 · Apt 4B
Close - Appliance
Refrigerator
Feb 4, 2026 · Apt 4B
Close - Plumbing
Basin/sink
Jan 30, 2026 · Apt 5C
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 6E
Close - Plumbing
Water supply
Jan 19, 2026 · Apt 4H
Close - Heat/hot water
Entire building
Jan 18, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jan 18, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Jan 18, 2026 · Apt 4B
Close - Water leak
Heavy flow
Jan 13, 2026 · Apt 6C
Close - Door/window
Door
Jan 13, 2026 · Apt 6C
Close - Door/window
Door
Jan 13, 2026 · Apt 6C
Close - Heat/hot water
Apartment only
Dec 22, 2025 · Apt 5G
Close - Flooring/stairs
Floor
Dec 19, 2025 · Apt 4E
Close - Appliance
Refrigerator
Dec 19, 2025 · Apt 4E
Close - Appliance
Electric/gas range
Dec 19, 2025 · Apt 4E
Close - Electric
Outlet/switch
Dec 19, 2025 · Apt 4E
Close - Door/window
Door
Dec 19, 2025 · Apt 4E
Close - Heat/hot water
Entire building
Oct 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2025 · Apt BLDG
Close - Door/window
Door
Sep 25, 2025 · Apt 6A
Close - Paint/plaster
Ceiling
Sep 25, 2025 · Apt 6A
Close - Door/window
Door
Sep 25, 2025 · Apt 6A
Close - General
Cabinet
Sep 25, 2025 · Apt 6A
Close - Electric
Outlet/switch
Aug 28, 2025 · Apt 4E
Close - Plumbing
Basin/sink
Aug 28, 2025 · Apt 4E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1938
- Floors
- 6
- Residential units
- 49
- Building area
- 53,424 ft²
- Lot area
- 10,000 ft²
- Zoning
- R7-1
- Community board
- 211
- Council district
- 15
- Block / lot
- 4340 / 1
- Assessed value
- $1,571,850
- Landmark / historic district
- No
HPD registration #218564, last renewed Aug 26, 2025.
Questions about 2260 Bronx Park East
Who owns 2260 Bronx Park East?
The owner of record in NYC Department of City Planning PLUTO data is Holland Industries LLC.
Does 2260 Bronx Park East have violations?
Yes. NYC HPD has recorded 220 housing violations at this property.
Is 2260 Bronx Park East rent stabilized?
NYC Department of Finance tax bills listed 49 rent-stabilized units here in 2024 (about 100% of its 49 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2260 Bronx Park East built?
City records list 1938 as the year it was built.
How many apartments are in 2260 Bronx Park East?
It has 49 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.