2116 Colonial Avenue
Bronx, NY 10461BBL 2-04252-0007Map
Owner of record: 2116 Colonial LLC
2116 Colonial Avenue is an elevator apartment building built in 2020 in Bronx, 10461. It has 16 residential units across 7 floors. The owner of record is 2116 Colonial LLC. HPD has recorded 183 housing violations here, most recently on September 15, 2026. 45 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 183
- DOB violations
- 5
- ECB violations
- 26
- HPD complaints
- 314
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 183
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 15, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell buzzer intercom system from building entrance door to the panel at north wall in the foyer located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 15, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective basecabinet at wash basin in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 15, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 15, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 15, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in drain pipe at wash basin in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 15, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south
Sep 15, 2026 · Apt 6C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south
Sep 15, 2026 · Apt 6C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at wash basin in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Jul 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Jun 30, 2026
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 30, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set and it's assembly at building entrance door at public hall, 1st story
Jun 30, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door at public hall, 1st story
Jun 30, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at north wall in the foyer located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 30, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Replace with new the missing sprinkler head cover in the 2nd room from north located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 30, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set and it's assembly at door in the 3rd room from north located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 30, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 30, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 30, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ehaust at range in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 30, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 30, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 30, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of wooden floor tiles (creating a cut hazard) in the private hallway located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 30, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 30, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly secure the loose upper wall hung cabinet in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 30, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 30, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3a, 3rd story
Jun 30, 2026 · Apt 3A
Open — Not complied with - ANon-hazardous
Cleanse to the satisfaction of this department the at public hall, 3rd story
Jun 30, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 30, 2026 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 30, 2026 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 4b, 4th story, 1st apartment from north at east
May 6, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 5a, 5th story, 2nd apartment from west at north
Mar 20, 2026 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 2nd apartment from south at west
Feb 10, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 10, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Feb 7, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 7, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Feb 7, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 4a, 4th story, 2nd apartment from east at south
Jan 5, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4a, 4th story, 2nd apartment from east at south
Jan 5, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4a, 4th story, 2nd apartment from east at south
Jan 5, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door looked at boiler room
Jan 5, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 2nd apartment from east at south
Jan 5, 2026 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4a, 4th story, 2nd apartment from east at south
Jan 5, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective shower body in the bathroom located at apt 7a, 7th story, 1st apartment from north at east
Dec 13, 2025 · Apt 7A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the bathroom located at apt 7a, 7th story, 1st apartment from north at east
Dec 13, 2025 · Apt 7A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroom located at apt 7a, 7th story, 1st apartment from north at east
Dec 13, 2025 · Apt 7A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east
Dec 13, 2025 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south
Dec 12, 2025 · Apt 3A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south
Dec 12, 2025 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east and south walls in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south
Dec 12, 2025 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling and behind south and east walls in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south
Dec 12, 2025 · Apt 3A
Open — Nov sent out
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed
ECB violations · 26
- Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #919573. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $2,500
Active - Class - 2
Bc3307.4.7 open debris container@storage zones.note:atoi observed 7stybldg under const@roof level;in active jobsite.observed metal debris container full of debris in it on street close to sidewalk in front of c
Apr 8, 2021
Resolve - Class - 2
Notification of adjustable suspended scaffold installation note:@time of insp observed 7stynb under const@roof level.active jobsite,workers working on it.also observed adjustable suspended scaffold@exp2&4 w/out
Feb 22, 2021 · Penalty $2,530
Resolve - Class - 1
Inadequate housekeeping note:@time of insp observed 7stynb under const@roof level.active jobsite,workers working on it.also observed piles of debris w/black bags,discarded woods,plywoods@rearyd,creating fire ha
Feb 22, 2021 · Penalty $2,530
Resolve - Class - 1
Bc3301.6 design drawing for suspended scaffold note:@time of insp observed 7stynb under const@roof level.active jobsite,workers working on it.also observed adjustable suspended scaffold@exp2&4 w/outrigger beams
Feb 22, 2021 · Penalty $2,530
Resolve - Class - 2
Failure of permit holder to provide inspection access to &/or expose on going construction or work on an active & permitted worksite. note: at the time of inspection observed from fence window 1 worker walking
Feb 13, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to provide sidewalk shed parapet panel sign.upon inspection a sidewalk shed was installed at exposure#1.however,no parapet sign was provided on the facing of the shed parapet.the code stipulates the req
Jan 5, 2021 · Penalty $625
Resolve - Class - 1
Bc 3303.9 failure to maintain egress(clear & unobstructed)upon inspection of exposure#1 construction entrance of building the bath of ingress and egress at that location was obstructed with construction materia
Jan 5, 2021
Resolve - Class - 2
Bc 3307.2.3 failure to provide debris netting.upon inspection their was an approx. gap of 30" from the top of the construction fence to the unperside of the sidewalk shed bridge.the code stipulates that debris
Jan 5, 2021
Resolve - Class - 1
Bc 3301.2 missing rebar caps.note:at the time of inspection observed a7 story new building under construction at 7th floor level.active jobsite,workers working on it.also observed missing rebar caps at & cellar
Dec 7, 2020 · Penalty $6,250
Resolve
Show 16 more ↓
- Class - 2
Missing fence note:at the time of inspeciton observed a 7 story new building under construction at 7th floor level.active jobsite,workers working on it.also observed missing construction fence at exposure three
Dec 7, 2020
Resolve - Class - 1
Bc 3314.1 failure to maintain pipe scaffolding note:at the time of inspection observed a 7 story new building under construction at 7th floor level.active jobsite,workers working on it also observed a pipe scaf
Dec 7, 2020 · Penalty $2,500
Resolve - Class - 1
Illegally engaging in any business:gc license expired.note:at the timeof inspection observed a 7 story new building under construction at 7th floor level.active jobsite,worker working on it.also observed in dob
Dec 7, 2020
Resolve - Class - 1
Housekeeping note:at the time of inspection observed a 7 story new building under construction at 7th floor level.active jobsite,workers working on it.also observed inadequate housekeeping entire jobsite.observ
Dec 7, 2020 · Penalty $2,500
Resolve - Class - 2
Permit expired for temporary construction equipment(fence)onsite.note:at the time of inspeciton observed a 7 story new bldg under construction at 7th floor level.active jobsite workers working on it also observ
Dec 7, 2020
Resolve - Class - 2
The exterior cmu walls on exposure #1,#2,#3 & #4 from 1st. to 4th. floor were installed with 0.5" space between cmu walls & metal studs contrary to 1" space for continual insulation between cmu walls & metal st
Oct 9, 2020
Resolve - Class - 1
Bc 3303.14 water accumulation /water dramage/standing water.at time ofmy inspection i observed at site standing water accumulated at the center.the site is currently at excavation phase.the water from observati
Feb 13, 2020 · Penalty $6,250
Resolve - Class - 1
Filed a certificate of correction or other related materials containing material false statement.at time of my inspection on inactive site currently at excavation phase.upon research of bis system i found there
Feb 13, 2020 · Penalty $5,000
Resolve - Class - 2
Failed to comply with commissioner's order to file a coc with dob at time of inspection,found jobsite closed and inactive.upon review of thebis for this site i found violation#35457235m had a coc package submit
Feb 13, 2020 · Penalty $3,125
Resolve - Class - 2
Jobsite fence not constructed or mainatined pursuant to subsection "inadequate is falling down" at time of inspection i observed an construction site with excavation down is unsafe this creating hazardous condi
Nov 14, 2019
Resolve - Class - 2
3303.14.2drainage of excavation.@ time of insp observed const site wasperform excavation phase during inspection noted there was a lot waternot be removed.this section (all excavation shall be drained &the draw
Nov 14, 2019
Resolve - Class - 1
301.13.1:site safety plan at time of inspection on a proposed 7 story new building observed violating condition upon entering the site noted obstructed of sidewalk (pedestrian pathway ) hose connected to fire
Jul 25, 2019 · Penalty $2,500
Resolve - Class - 2
3309.11;prostection of trees at time of inspection on a proposed 7 story building while drilling operatiobs were taking place.observed at exposure #1 an unprotected tree with mud from jobsite on
Jul 25, 2019 · Penalty $625
Resolve - Class - 2
Failure to safeguard all persons amd property affected by construction operations inadequate jobiste fence swings into public (3307.7.2) at time of inspection on a proposed 7 stroy building while drilling opera
Jul 25, 2019 · Penalty $5,000
Resolve - Class - 2
Construction superintendent failed to duties per code at time of inspection on a propsoed 7 story new building while drilling operations were taking place observed the following violating conditions and the sit
Jul 25, 2019 · Penalty $2,500
Resolve - Class - 1
3307.2.6:requirements for sidewalks,temporary walkways ,foot bridges and pathways at time of inspection on apropsoed 7 story new building while drilling operatiosn were taking place observed hose bstruction ped
Jul 25, 2019 · Penalty $2,500
Resolve
Complaints
- General
Bell/buzzer/intercom
Sep 9, 2026 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
Sep 9, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Sep 9, 2026 · Apt 3A
Close - Door/window
Window pane
Sep 9, 2026 · Apt 3A
Close - Water leak
Slow leak
Sep 9, 2026 · Apt 3A
Close - Safety
Smoke detector
Sep 9, 2026 · Apt 3A
Close - General
Cabinet
Sep 9, 2026 · Apt 3A
Close - Flooring/stairs
Floor
Sep 9, 2026 · Apt 3A
Close - Plumbing
Basin/sink
Sep 9, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Sep 9, 2026 · Apt 3A
Close
Show 40 more ↓
- Unsanitary condition
Pests
Sep 9, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 27, 2026 · Apt 6C
Close - Unsanitary condition
Pests
Aug 27, 2026 · Apt 6C
Close - Unsanitary condition
Pests
Aug 27, 2026 · Apt 6C
Close - Unsanitary condition
Garbage/recycling storage
Aug 27, 2026 · Apt 6C
Close - Unsanitary condition
Pests
Aug 27, 2026 · Apt 6C
Close - Unsanitary condition
Pests
Aug 17, 2026 · Apt 6C
Close - Unsanitary condition
Pests
Jun 22, 2026 · Apt 3A
Close - General
Cabinet
Jun 22, 2026 · Apt 3A
Close - Electric
Lighting
Jun 22, 2026 · Apt 3A
Close - Water leak
Slow leak
Jun 22, 2026 · Apt 3A
Close - Flooring/stairs
Floor
Jun 22, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Jun 22, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Jun 22, 2026 · Apt 3A
Close - Unsanitary condition
Pests
May 10, 2026 · Apt 3A
Close - Unsanitary condition
Pests
May 10, 2026 · Apt 3A
Close - Paint/plaster
Ceiling
May 10, 2026 · Apt 3A
Close - Unsanitary condition
Mold
May 10, 2026 · Apt 3A
Close - Flooring/stairs
Floor
May 10, 2026 · Apt 3A
Close - Unsanitary condition
Pests
May 10, 2026 · Apt 3A
Close - Paint/plaster
Wall
Apr 9, 2026 · Apt 3A
Close - Paint/plaster
Wall
Apr 9, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Apr 9, 2026 · Apt 3A
Close - Flooring/stairs
Floor
Apr 9, 2026 · Apt 3A
Close - Door/window
Door
Apr 1, 2026 · Apt 4B
Close - Unsanitary condition
Garbage/recycling storage
Mar 30, 2026 · Apt BLDG
Close - General
Ventilation system
Mar 24, 2026 · Apt 5B
Close - Plumbing
Water supply
Mar 20, 2026 · Apt 5B
Close - Heat/hot water
Entire building
Mar 20, 2026 · Apt BLDG
Close - Plumbing
Water supply
Mar 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 2, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2020
- Floors
- 7
- Residential units
- 16
- Building area
- 14,380 ft²
- Lot area
- 3,742 ft²
- Zoning
- R7-1
- Community board
- 210
- Council district
- 13
- Block / lot
- 4252 / 7
- Assessed value
- $611,100
- Landmark / historic district
- No
HPD registration #228519, last renewed Mar 6, 2026.
Questions about 2116 Colonial Avenue
Who owns 2116 Colonial Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2116 Colonial LLC.
Does 2116 Colonial Avenue have violations?
Yes. NYC HPD has recorded 183 housing violations at this property.
Is 2116 Colonial Avenue rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 100% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2116 Colonial Avenue built?
City records list 2020 as the year it was built.
How many apartments are in 2116 Colonial Avenue?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.