roofy

2116 Colonial Avenue

Bronx, NY 10461BBL 2-04252-0007Map

Owner of record: 2116 Colonial LLC

2116 Colonial Avenue is an elevator apartment building built in 2020 in Bronx, 10461. It has 16 residential units across 7 floors. The owner of record is 2116 Colonial LLC. HPD has recorded 183 housing violations here, most recently on September 15, 2026. 45 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.

HPD violations
183
DOB violations
5
ECB violations
26
HPD complaints
314

What to know

Concern
11 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 15, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
16
About 100% of the building's 16 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 183

  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south

    Sep 15, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective bell buzzer intercom system from building entrance door to the panel at north wall in the foyer located at apt 3a, 3rd story, 2nd apartment from east at south

    Sep 15, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective basecabinet at wash basin in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south

    Sep 15, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south

    Sep 15, 2026 · Apt 3A

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south

    Sep 15, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in drain pipe at wash basin in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south

    Sep 15, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south

    Sep 15, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south

    Sep 15, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective base cabinet at wash basin in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south

    Jul 26, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items at public hall, 3rd story

    Jun 30, 2026

    Open — Nov sent out
Show 40 more ↓
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Jun 30, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective latch set and it's assembly at building entrance door at public hall, 1st story

    Jun 30, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at building entrance door at public hall, 1st story

    Jun 30, 2026

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at north wall in the foyer located at apt 3a, 3rd story, 2nd apartment from east at south

    Jun 30, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Replace with new the missing sprinkler head cover in the 2nd room from north located at apt 3a, 3rd story, 2nd apartment from east at south

    Jun 30, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective latch set and it's assembly at door in the 3rd room from north located at apt 3a, 3rd story, 2nd apartment from east at south

    Jun 30, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south

    Jun 30, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south

    Jun 30, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective ehaust at range in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south

    Jun 30, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south

    Jun 30, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south

    Jun 30, 2026 · Apt 3A

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of wooden floor tiles (creating a cut hazard) in the private hallway located at apt 3a, 3rd story, 2nd apartment from east at south

    Jun 30, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south

    Jun 30, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Properly secure the loose upper wall hung cabinet in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south

    Jun 30, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south

    Jun 30, 2026 · Apt 3A

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3a, 3rd story

    Jun 30, 2026 · Apt 3A

    Open — Not complied with
  • A

    Cleanse to the satisfaction of this department the at public hall, 3rd story

    Jun 30, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south

    Jun 30, 2026 · Apt 3A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south

    Jun 30, 2026 · Apt 3A

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 4b, 4th story, 1st apartment from north at east

    May 6, 2026 · Apt 4B

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the kitchen located at apt 5a, 5th story, 2nd apartment from west at north

    Mar 20, 2026 · Apt 5A

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 2nd apartment from south at west

    Feb 10, 2026 · Apt 4A

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Feb 10, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east

    Feb 7, 2026 · Apt 3B

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Feb 7, 2026

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east

    Feb 7, 2026 · Apt 3B

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 4a, 4th story, 2nd apartment from east at south

    Jan 5, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4a, 4th story, 2nd apartment from east at south

    Jan 5, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4a, 4th story, 2nd apartment from east at south

    Jan 5, 2026 · Apt 4A

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door looked at boiler room

    Jan 5, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 2nd apartment from east at south

    Jan 5, 2026 · Apt 4A

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4a, 4th story, 2nd apartment from east at south

    Jan 5, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective shower body in the bathroom located at apt 7a, 7th story, 1st apartment from north at east

    Dec 13, 2025 · Apt 7A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the bathroom located at apt 7a, 7th story, 1st apartment from north at east

    Dec 13, 2025 · Apt 7A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroom located at apt 7a, 7th story, 1st apartment from north at east

    Dec 13, 2025 · Apt 7A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east

    Dec 13, 2025 · Apt 3B

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south

    Dec 12, 2025 · Apt 3A

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south

    Dec 12, 2025 · Apt 3A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east and south walls in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south

    Dec 12, 2025 · Apt 3A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over the ceiling and behind south and east walls in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south

    Dec 12, 2025 · Apt 3A

    Open — Nov sent out

DOB building violations · 5

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed

ECB violations · 26

  • Class - 2

    Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #919573. remedy: submit acceptable requ

    Apr 8, 2025 · Penalty $2,500

    Active
  • Class - 2

    Bc3307.4.7 open debris container@storage zones.note:atoi observed 7stybldg under const@roof level;in active jobsite.observed metal debris container full of debris in it on street close to sidewalk in front of c

    Apr 8, 2021

    Resolve
  • Class - 2

    Notification of adjustable suspended scaffold installation note:@time of insp observed 7stynb under const@roof level.active jobsite,workers working on it.also observed adjustable suspended scaffold@exp2&4 w/out

    Feb 22, 2021 · Penalty $2,530

    Resolve
  • Class - 1

    Inadequate housekeeping note:@time of insp observed 7stynb under const@roof level.active jobsite,workers working on it.also observed piles of debris w/black bags,discarded woods,plywoods@rearyd,creating fire ha

    Feb 22, 2021 · Penalty $2,530

    Resolve
  • Class - 1

    Bc3301.6 design drawing for suspended scaffold note:@time of insp observed 7stynb under const@roof level.active jobsite,workers working on it.also observed adjustable suspended scaffold@exp2&4 w/outrigger beams

    Feb 22, 2021 · Penalty $2,530

    Resolve
  • Class - 2

    Failure of permit holder to provide inspection access to &/or expose on going construction or work on an active & permitted worksite. note: at the time of inspection observed from fence window 1 worker walking

    Feb 13, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to provide sidewalk shed parapet panel sign.upon inspection a sidewalk shed was installed at exposure#1.however,no parapet sign was provided on the facing of the shed parapet.the code stipulates the req

    Jan 5, 2021 · Penalty $625

    Resolve
  • Class - 1

    Bc 3303.9 failure to maintain egress(clear & unobstructed)upon inspection of exposure#1 construction entrance of building the bath of ingress and egress at that location was obstructed with construction materia

    Jan 5, 2021

    Resolve
  • Class - 2

    Bc 3307.2.3 failure to provide debris netting.upon inspection their was an approx. gap of 30" from the top of the construction fence to the unperside of the sidewalk shed bridge.the code stipulates that debris

    Jan 5, 2021

    Resolve
  • Class - 1

    Bc 3301.2 missing rebar caps.note:at the time of inspection observed a7 story new building under construction at 7th floor level.active jobsite,workers working on it.also observed missing rebar caps at & cellar

    Dec 7, 2020 · Penalty $6,250

    Resolve
Show 16 more ↓
  • Class - 2

    Missing fence note:at the time of inspeciton observed a 7 story new building under construction at 7th floor level.active jobsite,workers working on it.also observed missing construction fence at exposure three

    Dec 7, 2020

    Resolve
  • Class - 1

    Bc 3314.1 failure to maintain pipe scaffolding note:at the time of inspection observed a 7 story new building under construction at 7th floor level.active jobsite,workers working on it also observed a pipe scaf

    Dec 7, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Illegally engaging in any business:gc license expired.note:at the timeof inspection observed a 7 story new building under construction at 7th floor level.active jobsite,worker working on it.also observed in dob

    Dec 7, 2020

    Resolve
  • Class - 1

    Housekeeping note:at the time of inspection observed a 7 story new building under construction at 7th floor level.active jobsite,workers working on it.also observed inadequate housekeeping entire jobsite.observ

    Dec 7, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Permit expired for temporary construction equipment(fence)onsite.note:at the time of inspeciton observed a 7 story new bldg under construction at 7th floor level.active jobsite workers working on it also observ

    Dec 7, 2020

    Resolve
  • Class - 2

    The exterior cmu walls on exposure #1,#2,#3 & #4 from 1st. to 4th. floor were installed with 0.5" space between cmu walls & metal studs contrary to 1" space for continual insulation between cmu walls & metal st

    Oct 9, 2020

    Resolve
  • Class - 1

    Bc 3303.14 water accumulation /water dramage/standing water.at time ofmy inspection i observed at site standing water accumulated at the center.the site is currently at excavation phase.the water from observati

    Feb 13, 2020 · Penalty $6,250

    Resolve
  • Class - 1

    Filed a certificate of correction or other related materials containing material false statement.at time of my inspection on inactive site currently at excavation phase.upon research of bis system i found there

    Feb 13, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    Failed to comply with commissioner's order to file a coc with dob at time of inspection,found jobsite closed and inactive.upon review of thebis for this site i found violation#35457235m had a coc package submit

    Feb 13, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Jobsite fence not constructed or mainatined pursuant to subsection "inadequate is falling down" at time of inspection i observed an construction site with excavation down is unsafe this creating hazardous condi

    Nov 14, 2019

    Resolve
  • Class - 2

    3303.14.2drainage of excavation.@ time of insp observed const site wasperform excavation phase during inspection noted there was a lot waternot be removed.this section (all excavation shall be drained &the draw

    Nov 14, 2019

    Resolve
  • Class - 1

    301.13.1:site safety plan at time of inspection on a proposed 7 story new building observed violating condition upon entering the site noted obstructed of sidewalk (pedestrian pathway ) hose connected to fire

    Jul 25, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    3309.11;prostection of trees at time of inspection on a proposed 7 story building while drilling operatiobs were taking place.observed at exposure #1 an unprotected tree with mud from jobsite on

    Jul 25, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to safeguard all persons amd property affected by construction operations inadequate jobiste fence swings into public (3307.7.2) at time of inspection on a proposed 7 stroy building while drilling opera

    Jul 25, 2019 · Penalty $5,000

    Resolve
  • Class - 2

    Construction superintendent failed to duties per code at time of inspection on a propsoed 7 story new building while drilling operations were taking place observed the following violating conditions and the sit

    Jul 25, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    3307.2.6:requirements for sidewalks,temporary walkways ,foot bridges and pathways at time of inspection on apropsoed 7 story new building while drilling operatiosn were taking place observed hose bstruction ped

    Jul 25, 2019 · Penalty $2,500

    Resolve

Complaints

  • General

    Bell/buzzer/intercom

    Sep 9, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 9, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Sep 9, 2026 · Apt 3A

    Close
  • Door/window

    Window pane

    Sep 9, 2026 · Apt 3A

    Close
  • Water leak

    Slow leak

    Sep 9, 2026 · Apt 3A

    Close
  • Safety

    Smoke detector

    Sep 9, 2026 · Apt 3A

    Close
  • General

    Cabinet

    Sep 9, 2026 · Apt 3A

    Close
  • Flooring/stairs

    Floor

    Sep 9, 2026 · Apt 3A

    Close
  • Plumbing

    Basin/sink

    Sep 9, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Mold

    Sep 9, 2026 · Apt 3A

    Close
Show 40 more ↓
  • Unsanitary condition

    Pests

    Sep 9, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Aug 27, 2026 · Apt 6C

    Close
  • Unsanitary condition

    Pests

    Aug 27, 2026 · Apt 6C

    Close
  • Unsanitary condition

    Pests

    Aug 27, 2026 · Apt 6C

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 27, 2026 · Apt 6C

    Close
  • Unsanitary condition

    Pests

    Aug 27, 2026 · Apt 6C

    Close
  • Unsanitary condition

    Pests

    Aug 17, 2026 · Apt 6C

    Close
  • Unsanitary condition

    Pests

    Jun 22, 2026 · Apt 3A

    Close
  • General

    Cabinet

    Jun 22, 2026 · Apt 3A

    Close
  • Electric

    Lighting

    Jun 22, 2026 · Apt 3A

    Close
  • Water leak

    Slow leak

    Jun 22, 2026 · Apt 3A

    Close
  • Flooring/stairs

    Floor

    Jun 22, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Mold

    Jun 22, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Jun 22, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    May 10, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    May 10, 2026 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    May 10, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Mold

    May 10, 2026 · Apt 3A

    Close
  • Flooring/stairs

    Floor

    May 10, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    May 10, 2026 · Apt 3A

    Close
  • Paint/plaster

    Wall

    Apr 9, 2026 · Apt 3A

    Close
  • Paint/plaster

    Wall

    Apr 9, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Mold

    Apr 9, 2026 · Apt 3A

    Close
  • Flooring/stairs

    Floor

    Apr 9, 2026 · Apt 3A

    Close
  • Door/window

    Door

    Apr 1, 2026 · Apt 4B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 30, 2026 · Apt BLDG

    Close
  • General

    Ventilation system

    Mar 24, 2026 · Apt 5B

    Close
  • Plumbing

    Water supply

    Mar 20, 2026 · Apt 5B

    Close
  • Heat/hot water

    Entire building

    Mar 20, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Mar 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 14, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 14, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 2, 2026 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
2020
Floors
7
Residential units
16
Building area
14,380 ft²
Lot area
3,742 ft²
Zoning
R7-1
Community board
210
Council district
13
Block / lot
4252 / 7
Assessed value
$611,100
Landmark / historic district
No

HPD registration #228519, last renewed Mar 6, 2026.

Questions about 2116 Colonial Avenue

Who owns 2116 Colonial Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 2116 Colonial LLC.

Does 2116 Colonial Avenue have violations?

Yes. NYC HPD has recorded 183 housing violations at this property.

Is 2116 Colonial Avenue rent stabilized?

NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 100% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2116 Colonial Avenue built?

City records list 2020 as the year it was built.

How many apartments are in 2116 Colonial Avenue?

It has 16 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.