3109 Roberts Avenue
Bronx, NY 10461BBL 2-04177-0030Map
Owner of record: Rally, Realty .
3109 Roberts Avenue is a walk-up apartment building built in 1927 in Bronx, 10461. It has 37 residential units across 5 floors. The owner of record is Rally, Realty .. HPD has recorded 90 housing violations here, most recently on January 27, 2026. 1 of the 50 most recent violations are still open. City tax records listed 36 rent-stabilized apartments here in 2024.
- HPD violations
- 90
- DOB violations
- 1
- ECB violations
- 8
- HPD complaints
- 315
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 90
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame installed incorrectly, ( must be installed within 48'' and 62'' from the ground)
Jan 27, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of jammed door at roof bulkhead impeding egress at 1st public hall bulkhead from north, 6th story
Jan 27, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at roof bulkhead at public hall, 6th story
Jan 27, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at roof bulkhead at public hall, 6th story
Jan 27, 2026
Closed — Violation dismissed - CImmediately hazardous
Repair the roof so that it will not leak above the ceiling at roof bulkhead at public hall, 6th story
Jan 27, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at the upper windos sash at intermediate landing (creating hazard) at public hall stairs, 4th story
Dec 29, 2025
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ...at ceiling and north wall in the bathroom located at apt 3f, 4th story, 1st apartment from east at south
Aug 13, 2025 · Apt 3F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at upper sash window at intermediate landing at public hall stairs at 4th story at public hall
Apr 3, 2025
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3e, 3rd story, 3rd apartment from north at east
Oct 18, 2024 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3e, 3rd story, 3rd apartment from north at east
Oct 18, 2024 · Apt 3E
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3e, 3rd story, 3rd apartment from north at east
Oct 18, 2024 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt d, 1st story, 2nd apartment from north at east
Feb 9, 2024 · Apt D
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective device in the entire apartment located at apt 2e, 4th story, 3rd apartment from north at east
Feb 9, 2024 · Apt 2E
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective device in the entire apartment located at apt 2e, 4th story, 3rd apartment from north at east
Feb 9, 2024 · Apt 2E
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2e, 4th story, 3rd apartment from north at east
Feb 9, 2024 · Apt 2E
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2e, 4th story, 3rd apartment from north at east
Feb 9, 2024 · Apt 2E
Closed — Violation closed - BHazardous
Properly secure the loose cap at newel post at intermediate landing at public hall stairs, 3rd story
Feb 9, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [hinge] at entrance door in the entrance located at apt 2e, 4th story, 3rd apartment from north at east
Feb 9, 2024 · Apt 2E
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lower window sash spring balance at 2nd window from east at south wall in the 4th room from north located at apt 2e, 4th story, 3rd apartment from north at east
Feb 9, 2024 · Apt 2E
Closed — Violation closed - BHazardous
Abate the infestation consisting of vermin waterbugs in the entire apartment located at apt e, 1st story, 2nd apartment from north at east
Feb 5, 2024 · Apt E
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt e, 1st story, 2nd apartment from north at east
Feb 5, 2024 · Apt E
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt apt3f, 4th story, 1st apartment from east at south
Jan 5, 2024 · Apt APT3F
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt apt3f, 4th story, 1st apartment from east at south
Jan 5, 2024 · Apt APT3F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the private hallway located at apt apt3f, 4th story, 1st apartment from east at south
Jan 5, 2024 · Apt APT3F
Closed — Violation dismissed - ANon-hazardous
Properly secure the loose escutcheon plate at riser at ceiling in the bathroom located at apt apt3f, 4th story, 1st apartment from east at south
Jan 5, 2024 · Apt APT3F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt apt3f, 4th story, 1st apartment from east at south
Jan 5, 2024 · Apt APT3F
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt apt3f, 4th story, 1st apartment from east at south
Jan 5, 2024 · Apt APT3F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt e, 1st story, 3rd apartment from west at north
Dec 22, 2023 · Apt E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt e, 1st story, 3rd apartment from west at north
Dec 22, 2023 · Apt E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2e, 3rd story, 3rd apartment from west at north
Dec 20, 2023 · Apt 2E
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2e, 3rd story, 3rd apartment from west at north
Dec 20, 2023 · Apt 2E
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2b, 3rd story, 3rd apartment from south at west
Nov 22, 2023 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 2b, 3rd story, 3rd apartment from south at west
Nov 22, 2023 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees in the kitchen located at apt 2b, 3rd story, 3rd apartment from south at west
Nov 22, 2023 · Apt 2B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2b, 3rd story, 3rd apartment from south at west
Nov 22, 2023 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from east at north located at apt 3d, 3rd story, 2nd apartment from north at east
Nov 14, 2023 · Apt 3D
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 3d, 3rd story, 2nd apartment from north at east
Nov 14, 2023 · Apt 3D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the 1st room from east at north located at apt 3d, 3rd story, 2nd apartment from north at east
Nov 14, 2023 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3d, 3rd story, 2nd apartment from north at east
Nov 14, 2023 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st riser from west at north wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from north at east
Nov 14, 2023 · Apt 3D
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from north at east
Nov 14, 2023 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective glass panel at building entrance door at public hall, 1st story
Oct 21, 2023
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt e, 1st story, 2nd apartment from north at east
Oct 16, 2023 · Apt E
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3d, 5th story, 2nd apartment from north at east
Sep 21, 2023 · Apt 3D
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 3d, 5th story, 2nd apartment from north at east
Sep 21, 2023 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3d, 5th story, 2nd apartment from north at east
Sep 21, 2023 · Apt 3D
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 2 sq. ft. at ceiling in the bathroom located at apt 3d, 5th story, 2nd apartment from north at east
Sep 21, 2023 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east at north located at apt 3d, 5th story, 2nd apartment from north at east
Sep 21, 2023 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the kitchen located at apt 3d, 5th story, 2nd apartment from north at east
Sep 21, 2023 · Apt 3D
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3d, 5th story, 2nd apartment from north at east
Sep 21, 2023 · Apt 3D
Closed — Violation closed
DOB building violations · 1
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed
ECB violations · 8
- Class - 2
Work w/out a permit. work noted: observed on the 1st flr of this m/d building in apt#f the kitchen wall where the plastered wall was demolished & they coded metal stairs to expose the main sewer pipe & they are
Jun 30, 2017 · Penalty $400
Resolve - Class - 2
Sidewalk shed does not meet codee specifications. sidewalk shed is obsructing fire escape ladder. rem: conform shed to code specifications.
May 6, 2010 · Penalty $2,400
Resolve - Class - 3
Work w/o a permit. found in apt #'s 3e and e washer machine installed improperly without a permit. rem: obtain a permit and arrange an inspections with this dept.
Apr 19, 2010
Resolve - Class - 1
"stop all work" plumbing work w/o a permit.stop work order:street level west apartment)demolition,alteration of said apt newly installing plumbing, gas, waste & enter lines for use of bathrm & kitchen.work in
Jul 14, 2009 · Penalty $800
Resolve - Hazardous
Exit passageway total obstruction fire exit passageway exterior blocked by excessive debris at the west elevation all way.remedy:remove obstruction.
Mar 22, 2007
Resolve - Hazardous
Failure to maintain:excessive debris piled at exterior alley way old wood cabinets, green garbage bags.location:west alleyway & exit passageway.remedy:remove all debris immediately maintain property.
Mar 22, 2007 · Penalty $800
Resolve - Non-hazardous
Failure to saftey and properly remove const debris const piled at rearsheetrock peices 2 x 4's bags of plaster piled covering ground floor rear windows remedy:remove debris saftey
Oct 1, 2004 · Penalty $500
Resolve - Non-hazardous
Exit passagewat total obstructuion const debris blocking exterior firepassegeway at rear of build at time of inspection.remedy:remove obstruction
Oct 1, 2004 · Penalty $480
Resolve
Complaints
- Electric
Lighting
Oct 21, 2026 · Apt 2E
Open - Water leak
Heavy flow
Oct 21, 2026 · Apt 2E
Open - Plumbing
Basin/sink
Oct 21, 2026 · Apt 2E
Open - Unsanitary condition
Garbage/recycling storage
Oct 21, 2026 · Apt 2E
Open - Unsanitary condition
Garbage/recycling storage
Sep 24, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 11, 2026 · Apt 4F
Close - Unsanitary condition
Mold
Mar 11, 2026 · Apt 4F
Close - Appliance
Refrigerator
Mar 11, 2026 · Apt 4F
Close - Door/window
Window frame
Mar 11, 2026 · Apt 4F
Close - Paint/plaster
Ceiling
Mar 11, 2026 · Apt 4F
Close
Show 40 more ↓
- Flooring/stairs
Floor
Mar 11, 2026 · Apt 4F
Close - Plumbing
Basin/sink
Mar 11, 2026 · Apt 4F
Close - Plumbing
Basin/sink
Mar 11, 2026 · Apt 4F
Close - Unsanitary condition
Pests
Mar 11, 2026 · Apt 4F
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Jan 20, 2026 · Apt 4F
Close - Plumbing
Basin/sink
Jan 20, 2026 · Apt 4F
Close - Plumbing
Basin/sink
Jan 20, 2026 · Apt 4F
Close - Paint/plaster
Ceiling
Jan 20, 2026 · Apt 4F
Close - Flooring/stairs
Floor
Jan 20, 2026 · Apt 4F
Close - Door/window
Window frame
Jan 20, 2026 · Apt 4F
Close - Plumbing
Bathtub/shower
Jan 20, 2026 · Apt 4F
Close - General
Cabinet
Jan 20, 2026 · Apt 4F
Close - Outside building
Roofing
Jan 20, 2026 · Apt 4F
Close - Unsanitary condition
Mold
Jan 13, 2026 · Apt 4F
Close - Paint/plaster
Ceiling
Jan 13, 2026 · Apt 4F
Close - Plumbing
Basin/sink
Jan 13, 2026 · Apt 4F
Close - Plumbing
Basin/sink
Jan 13, 2026 · Apt 4F
Close - Door/window
Window frame
Jan 13, 2026 · Apt 4F
Close - Flooring/stairs
Floor
Jan 13, 2026 · Apt 4F
Close - Unsanitary condition
Garbage/recycling storage
Jan 13, 2026 · Apt 4E
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 5, 2025 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 4, 2025 · Apt 1G
Close - Water leak
Heavy flow
Aug 5, 2025 · Apt 3F
Close - Heat/hot water
Apartment only
Mar 31, 2025 · Apt 3F
Close - Paint/plaster
Ceiling
Mar 28, 2025 · Apt 3D
Close - Water leak
Damp spot
Mar 28, 2025 · Apt 3D
Close - Plumbing
Radiator
Mar 28, 2025 · Apt 3D
Close - Paint/plaster
Ceiling
Mar 28, 2025 · Apt 3D
Close - Unsanitary condition
Mold
Mar 28, 2025 · Apt 3D
Close - Flooring/stairs
Floor
Mar 28, 2025 · Apt 3D
Close - Paint/plaster
Wall
Mar 28, 2025 · Apt 3D
Close - Paint/plaster
Wall
Mar 28, 2025 · Apt 3D
Close - Heat/hot water
Apartment only
Mar 7, 2025 · Apt 1A
Close - Heat/hot water
Entire building
Dec 4, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 1, 2024 · Apt 1A
Close - Heat/hot water
Entire building
Nov 24, 2024 · Apt E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 5
- Residential units
- 37
- Building area
- 30,000 ft²
- Lot area
- 7,500 ft²
- Zoning
- R7-1
- Community board
- 210
- Council district
- 13
- Block / lot
- 4177 / 30
- Assessed value
- $1,438,650
- Landmark / historic district
- No
HPD registration #218917, last renewed Jul 22, 2025.
Questions about 3109 Roberts Avenue
Who owns 3109 Roberts Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Rally, Realty ..
Does 3109 Roberts Avenue have violations?
Yes. NYC HPD has recorded 90 housing violations at this property.
Is 3109 Roberts Avenue rent stabilized?
NYC Department of Finance tax bills listed 36 rent-stabilized units here in 2024 (about 97% of its 37 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3109 Roberts Avenue built?
City records list 1927 as the year it was built.
How many apartments are in 3109 Roberts Avenue?
It has 37 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.