3026 Buhre Avenue
Bronx, NY 10461BBL 2-04175-0001Map
Owner of record: Mh Rlty LLC
3026 Buhre Avenue is a walk-up apartment building built in 1926 in Bronx, 10461. It has 18 residential units across 5 floors. The owner of record is Mh Rlty LLC. HPD has recorded 66 housing violations here, most recently on July 1, 2026. 4 of the 50 most recent violations are still open. City tax records listed 19 rent-stabilized apartments here in 2024.
- HPD violations
- 66
- DOB violations
- 3
- ECB violations
- 1
- HPD complaints
- 36
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 66
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Jul 1, 2026 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Jul 1, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Jul 1, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the entrance located at apt 2a, 2nd story, 1st apartment from west at north
Jul 1, 2026 · Apt 2A
Open — Violation will be reinspected - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower window sash in the kitchen located at apt 2a, 2nd story, 1st apartment from west at north
Jul 1, 2026 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Jul 1, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all wall and ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Jul 1, 2026 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at door in the entrance located at apt 2a, 2nd story, 1st apartment from west at north
Jul 1, 2026 · Apt 2A
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Jul 1, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at north exterior wall fire escape
Apr 6, 2026
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4a, 4th story, 1st apartment from west at north
Dec 31, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 4a, 4th story, 1st apartment from west at north
Dec 31, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4a, 4th story, 1st apartment from west at north
Dec 31, 2025 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Oct 8, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4d, 4th story, 2nd apartment from east at south
Nov 1, 2024 · Apt 4D
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the foyer located at apt 4d, 4th story, 2nd apartment from east at south
Nov 1, 2024 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening key operated door knob assembly installed on door to room with fire escape window in the 4th room from north at west located at apt 2d, 4th story, 2nd apartment from east at south
Apr 24, 2024 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 2nd apartment from west at north
Mar 26, 2024 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the 1st room from north at east located at apt 2b, 2nd story, 2nd apartment from west at north
Mar 26, 2024 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt 2b, 2nd story, 2nd apartment from west at north
Mar 26, 2024 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the foyer located at apt 2b, 2nd story, 2nd apartment from west at north
Mar 26, 2024 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain glaze at the bath tub in the bathroom located at apt 2b, 2nd story, 2nd apartment from west at north
Mar 26, 2024 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 2nd apartment from west at north
Mar 26, 2024 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2b, 2nd story, 2nd apartment from west at north
Mar 26, 2024 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2b, 2nd story, 2nd apartment from west at north
Mar 26, 2024 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from north at west, the 2nd room from north at west, the foyer , the 1st room from north at east, the bathroom located at apt 2b, 2nd story, 2nd apartment from west at north
Mar 26, 2024 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the kitchen located at apt 2b, 2nd story, 2nd apartment from west at north
Mar 26, 2024 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 2b, 2nd story, 2nd apartment from west at north
Mar 26, 2024 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from west at north wall in the 1st room from north at west located at apt 3b, 3rd story, 2nd apartment from west at north
Mar 23, 2024 · Apt 3B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Mar 23, 2024 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, 1st window frame from north at east wall in the kitchen located at apt 3b, 3rd story, 2nd apartment from west at north
Mar 23, 2024 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the 1st room from north at east located at apt 3b, 3rd story, 2nd apartment from west at north
Mar 23, 2024 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Mar 23, 2024 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Mar 23, 2024 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department in the 1st window frame from north at east wall in the 1st room from north at east located at apt 3b, 3rd story, 2nd apartment from west at north
Mar 23, 2024 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the kitchen located at apt 3b, 3rd story, 2nd apartment from west at north
Mar 23, 2024 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department in the 1st door from east at south wall in the 1st room from north at west located at apt 3b, 3rd story, 2nd apartment from west at north
Mar 23, 2024 · Apt 3B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 10 sq ft at east wall and approx 10 sq ft at north wall in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at north
Mar 23, 2024 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at roof at public hall, 5th story
Jun 7, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 2d, 2nd story, 1st apartment from north at east
Jun 7, 2022 · Apt 2D
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall stairs, 5th story
Jun 7, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall at public hall stairs, 5th story
Jun 7, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Dec 7, 2021
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 3rd room from north at west located at apt 5c, 5th story, 1st apartment from east at south
Dec 7, 2021 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches located at apt 5c, 5th story, 1st apartment from east at south
Dec 7, 2021 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; located at apt 5c, 5th story, 1st apartment from east at south
Dec 7, 2021 · Apt 5C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at west, the 2nd room from north at west, the foyer , the 3rd room from north at east located at apt 5c, 5th story, 1st apartment from east at south
Dec 7, 2021 · Apt 5C
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 2b, 2nd story, 2nd apartment from west at north
Sep 9, 2020 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from north at west located at apt 2b, 2nd story, 2nd apartment from west at north
Sep 9, 2020 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective door in the 1st room from north at west located at apt 2b, 2nd story, 2nd apartment from west at north
Jul 23, 2020 · Apt 2B
Open — Not complied with
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
ECB violations · 1
- Hazardous
4a-19b-36. 36-burnham boiler in basement heats commercial space (not registered).
Dec 10, 2002 · Penalty $800
Resolve
Complaints
- Door/window
Window frame
Aug 17, 2026 · Apt 2B
Open - Unsanitary condition
Pests
Jun 26, 2026 · Apt 2A
Close - Water leak
Slow leak
Jun 26, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Jun 26, 2026 · Apt 2A
Close - Paint/plaster
Wall
Jun 26, 2026 · Apt 2A
Close - Appliance
Electric/gas range
Jun 26, 2026 · Apt 2A
Close - Door/window
Door
Jun 26, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Jun 26, 2026 · Apt 2A
Close - Safety
Smoke detector
Jun 26, 2026 · Apt 2A
Close - Flooring/stairs
Floor
Jun 26, 2026 · Apt 2A
Close
Show 26 more ↓
- Heat/hot water
Entire building
Dec 30, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Sep 10, 2025 · Apt 3B
Close - Electric
Wiring
Oct 31, 2024 · Apt 4D
Close - Paint/plaster
Wall
Mar 16, 2024 · Apt 2B
Close - Plumbing
Bathtub/shower
Mar 16, 2024 · Apt 2B
Close - General
Cabinet
Mar 16, 2024 · Apt 2B
Close - Flooring/stairs
Floor
Mar 16, 2024 · Apt 2B
Close - Unsanitary condition
Pests
Mar 13, 2024 · Apt 3B
Close - Unsanitary condition
Mold
Mar 13, 2024 · Apt 3B
Close - Door/window
Window frame
Mar 13, 2024 · Apt 3B
Close - Paint/plaster
Window/frame
Mar 13, 2024 · Apt 3B
Close - Paint/plaster
Wall
Mar 13, 2024 · Apt 3B
Close - Paint/plaster
Door/frame
Nov 15, 2021 · Apt 5C
Close - Door/window
Door
Jul 4, 2020 · Apt 2B
Close - Plumbing
Bathtub/shower
Jul 4, 2020 · Apt 2B
Close - Nonconst
Vermin
Oct 31, 2013 · Apt 4C
Close - Paint/plaster
Door/frame
May 5, 2011 · Apt 4D
Close - Paint/plaster
Wall
May 5, 2011 · Apt 4D
Close - Paint/plaster
Door/frame
May 5, 2011 · Apt 4D
Close - Heating
Heat related
Jan 4, 2010 · Apt 4A
Close - Paint/plaster
Wall
Mar 24, 2009 · Apt 3B
Close - Heating
Heat related
Nov 16, 2008 · Apt 4D
Close - Heating
Heat related
Mar 6, 2007 · Apt 4A
Close - Heating
Heat related
Mar 6, 2007 · Apt 5B
Close - Heating
Heat related
Jan 1, 2006 · Apt BLDG
Close - Heating
Heat related
Dec 15, 2005 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1926
- Floors
- 5
- Residential units
- 18
- Building area
- 22,440 ft²
- Lot area
- 5,001 ft²
- Zoning
- R7-1
- Community board
- 210
- Council district
- 13
- Block / lot
- 4175 / 1
- Assessed value
- $365,400
- Landmark / historic district
- No
HPD registration #209090, last renewed Jul 8, 2025.
Questions about 3026 Buhre Avenue
Who owns 3026 Buhre Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Mh Rlty LLC.
Does 3026 Buhre Avenue have violations?
Yes. NYC HPD has recorded 66 housing violations at this property.
Is 3026 Buhre Avenue rent stabilized?
NYC Department of Finance tax bills listed 19 rent-stabilized units here in 2024 (about 100% of its 18 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3026 Buhre Avenue built?
City records list 1926 as the year it was built.
How many apartments are in 3026 Buhre Avenue?
It has 18 residential units and 20 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.