1380 White Plains Road
Bronx, NY 10462BBL 2-03936-0007Map
Owner of record: 1380 Wpr Partners, LLC
1380 White Plains Road is a walk-up apartment building built in 1927 in Bronx, 10462. It has 37 residential units across 5 floors. The owner of record is 1380 Wpr Partners, LLC. HPD has recorded 463 housing violations here, most recently on September 1, 2026. 29 of the 50 most recent violations are still open. City tax records listed 38 rent-stabilized apartments here in 2024.
- HPD violations
- 463
- DOB violations
- 14
- ECB violations
- 9
- HPD complaints
- 708
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 463
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Sep 1, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Sep 1, 2026 · Apt 3A
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at all stories balconies at south stack at rear yard at fire escape
Aug 14, 2026
Open — Nov certified on time - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at second and third story balconies at building front at fire escape
Aug 14, 2026
Open — Nov certified on time - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of antenna wire blocking access to drop ladder at 2nd fire escape from north at west at building front at fire escape, 2nd story
Jul 19, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at balcony at 2nd fire escape from north at west at building front at fire escape, 3rd story
Jul 19, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
May 21, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
May 21, 2026
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west , section ''north''
May 21, 2026 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
May 21, 2026 · Apt 3A
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the 3rd room from east located at apt 3b, 3rd story, 1st apartment from east at south , section ''north''
Apr 30, 2026 · Apt 3B
Open — Certification postponment granted - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at cooking range in the kitchen located at apt 3b, 3rd story, 1st apartment from east at south , section ''north''
Apr 30, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south , section ''north''
Apr 30, 2026 · Apt 3B
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective rotten wood cabinet at south wall in the bathroom located at apt 3b, 3rd story, 1st apartment from east at south , section ''north''
Apr 30, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 3rd room from east located at apt 3b, 3rd story, 1st apartment from east at south , section ''north''
Apr 30, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 3a, 3rd story, 2nd apartment from south at west
Apr 22, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at (missing water closet) in the bathroom located at apt 3a, 3rd story, 2nd apartment from south at west
Apr 22, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Replace the broken or defective water closet(missing) in the bathroom located at apt 3a, 3rd story, 2nd apartment from south at west
Apr 22, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures volume at wash basin in the bathroom located at apt 3a, 3rd story, 2nd apartment from south at west
Apr 22, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures volume at the wash basin in the bathroom located at apt 3a, 3rd story, 2nd apartment from south at west
Apr 22, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Replace the broken or defective washbasin (missing) in the bathroom located at apt 3a, 3rd story, 2nd apartment from south at west
Apr 22, 2026 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective at ceiling light fixture in the kitchen located at apt 3a, 3rd story, 1st apartment from south at west
Apr 17, 2026 · Apt 3A
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Apr 17, 2026 · Apt 3A
Open — Not complied with - CImmediately hazardous
Remove all obstructions from water closet water closet in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west
Apr 17, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Replace the broken or defective washbasin in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west
Apr 17, 2026 · Apt 3A
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures at bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west
Apr 17, 2026 · Apt 3A
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west
Apr 17, 2026 · Apt 3A
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Apr 17, 2026 · Apt 3A
Open — Not complied with - ANon-hazardous
Paint metal in accordance with dept. regulation at door in the entrance located at apt 3a, 3rd story, 1st apartment from south at west
Apr 17, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3a, 3rd story, 1st apartment from south at west
Apr 17, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles south wall in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west
Apr 17, 2026 · Apt 3A
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective reglazing porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west
Apr 17, 2026 · Apt 3A
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at wood floor at washbasin base cabinet in the bathroom located at apt 3b, 3rd story, 2nd apartment from east at south , section at north
Mar 31, 2026 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the 3rd room from east located at apt 3b, 3rd story, 2nd apartment from east at south , section at north
Mar 31, 2026 · Apt 3B
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, ceiling in the bathroom located at apt 1g, 1st story, 1st apartment from west at north , section at south
Mar 31, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall, ceiling in the bathroom located at apt 1g, 1st story, 1st apartment from west at north , section at south
Mar 31, 2026 · Apt 1G
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1g, 1st story, 1st apartment from west at north , section at south
Mar 31, 2026 · Apt 1G
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3b, 3rd story, 2nd apartment from east at south , section at north
Mar 31, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at wood floor at washbasin base cabinet in the bathroom located at apt 3b, 3rd story, 2nd apartment from east at south , section at north original violation 18762952 issued 31-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Mar 31, 2026 · Apt 3B
Open — Civ14 mailed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from east located at apt 3b, 3rd story, 2nd apartment from east at south , section at north
Mar 31, 2026 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3b, 3rd story, 2nd apartment from east at south , section at north
Mar 31, 2026 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway located at apt 3b, 3rd story, 2nd apartment from east at south , section at north
Mar 31, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of hasp with an eye installed at interior side of the door capable of being padlock in the entrance located at apt 1g, 1st story, 1st apartment from west at north , section at south
Mar 31, 2026 · Apt 1G
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 1g, 1st story, 1st apartment from west at north , section at south
Mar 31, 2026 · Apt 1G
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 1g, 1st story, 1st apartment from west at north , section at south
Mar 31, 2026 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1g, 1st story, 1st apartment from west at north , section at south
Mar 31, 2026 · Apt 1G
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches located at apt 1g, 1st story, 1st apartment from west at north , section at south
Mar 31, 2026 · Apt 1G
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice located at apt 1g, 1st story, 1st apartment from west at north , section at south
Mar 31, 2026 · Apt 1G
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south , section at north
Mar 31, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly secure the loose electrical outlet cover plate at north wall in the 3rd room from east located at apt 3b, 3rd story, 2nd apartment from east at south , section at north
Mar 31, 2026 · Apt 3B
Open — Nov sent out
DOB building violations · 14
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 8, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 9
- Class - 2
I observed in apt 3a installation/replacement of light fixtures , light switches and receptacle installed without an electrical permit on file., obtain permit; obtain electrical permit
Apr 20, 2026 · Penalty $625
Active - Class - 1
I observed in apt 3a unsafe unsuitable electrical conditions, live extension cords throughout the apartment used as permanent wiring and subject to damage and electrocution.; nec 400.12, comply with ec code; fi
Apr 20, 2026 · Penalty $1,600
Active - Class - 2
Unapproved/unsafe/ unsuitable, elctrical equipment, apparatus, material, device, appliances or wiring in use. observed in the restaurant, extension cord is used as a permanent wiring, led strip lights fixures
Aug 7, 2019 · Penalty $4,000
Active - Class - 2
B254,36,(36)as per class 254-36 boiler not registered as per dob records correct all violation conditions and submit certificate of correction
Apr 19, 2017
Resolve - Class - 3
Work does not conform to approved const docs &/or approved amendments noted:plan shows new 6" gas vent up to roof,found no vent going to theroof @that locn.rem:comform to approved const docs.
Jul 21, 2016
Resolve - Class - 1
Work w/o a permit.observed on 01/06/15.@ 2:20pm the installation of gas hot water heater gas piping water piping commerial grease interepter & plastic pvc piping in commerial bldg.photos taken.rem:obtain a perm
Jan 6, 2015 · Penalty $800
Active - Class - 2
Failure to maintain bldg in code compliant manner:gas vent reduced or under sized not connected to chimmney.as per fbc 504.2 & 27-887.connect to chimmney observed on 01/06/15 @ 2:20pm.rem:install proper vent.
Jan 6, 2015 · Penalty $250
Active - Non-hazardous
36 (36) boiler installed aprox 6 months ago no first test done. boiler unregistered.
Dec 19, 2000
Resolve - Non-hazardous
40,49. 40- draft stat not operable ,49- leaking fitting on the outlet line of the front coil and steam leaking from fitting on the line going from boiler to low water cut off
Jan 27, 2000
Resolve
Complaints
- Paint/plaster
Wall
Sep 10, 2026 · Apt 5F
Close - Unsanitary condition
Mold
Sep 10, 2026 · Apt 5F
Close - Paint/plaster
Ceiling
Sep 10, 2026 · Apt 5F
Close - Heat/hot water
Entire building
May 21, 2026 · Apt BLDG
Close - Plumbing
Toilet
Apr 24, 2026 · Apt 3A
Close - Paint/plaster
Wall
Apr 22, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Apr 22, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Apr 22, 2026 · Apt 3B
Close - General
Cabinet
Apr 22, 2026 · Apt 3B
Close - General
Cooking gas
Apr 21, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 21, 2026 · Apt BLDG
Close - Plumbing
Bathtub/shower
Apr 21, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt 3A
Close - Plumbing
Toilet
Apr 21, 2026 · Apt 3A
Close - Plumbing
Toilet
Apr 16, 2026 · Apt 3A
Close - Plumbing
Water supply
Apr 2, 2026 · Apt 4E
Close - General
Cooking gas
Mar 31, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Mar 31, 2026 · Apt 3A
Close - General
Cooking gas
Mar 30, 2026 · Apt 3A
Close - General
Cooking gas
Mar 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 29, 2026 · Apt BLDG
Close - Appliance
Electric/gas range
Mar 29, 2026 · Apt 1G
Close - Unsanitary condition
Pests
Mar 29, 2026 · Apt 1G
Close - Paint/plaster
Wall
Mar 29, 2026 · Apt 1G
Close - Unsanitary condition
Pests
Mar 29, 2026 · Apt 1G
Close - Heat/hot water
Apartment only
Mar 29, 2026 · Apt 1G
Close - General
Cooking gas
Mar 29, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Mar 29, 2026 · Apt 3B
Close - General
Cooking gas
Mar 29, 2026 · Apt 2A
Close - Heat/hot water
Apartment only
Mar 29, 2026 · Apt 2A
Close - General
Cooking gas
Mar 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2026 · Apt BLDG
Close - Plumbing
Water supply
Mar 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Mar 27, 2026 · Apt 2C
Close - General
Cooking gas
Mar 27, 2026 · Apt 5E
Close - Electric
Power outage
Mar 27, 2026 · Apt 2C
Close - Unsanitary condition
Pests
Mar 27, 2026 · Apt 5E
Close - General
Cooking gas
Mar 27, 2026 · Apt 2C
Close - Appliance
Refrigerator
Mar 27, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Mar 27, 2026 · Apt 2C
Close - Plumbing
Basin/sink
Mar 27, 2026 · Apt 2C
Close - Electric
Outlet/switch
Mar 27, 2026 · Apt 2C
Close - Unsanitary condition
Mold
Mar 27, 2026 · Apt 2C
Close - General
Cooking gas
Mar 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 27, 2026 · Apt BLDG
Close - General
Cabinet
Mar 27, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Mar 27, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Mar 27, 2026 · Apt 5H
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1927
- Floors
- 5
- Residential units
- 37
- Building area
- 34,875 ft²
- Lot area
- 7,875 ft²
- Zoning
- R6
- Community board
- 209
- Council district
- 18
- Block / lot
- 3936 / 7
- Assessed value
- $1,334,250
- Landmark / historic district
- No
HPD registration #208992, last renewed Oct 28, 2025.
Questions about 1380 White Plains Road
Who owns 1380 White Plains Road?
The owner of record in NYC Department of City Planning PLUTO data is 1380 Wpr Partners, LLC.
Does 1380 White Plains Road have violations?
Yes. NYC HPD has recorded 463 housing violations at this property.
Is 1380 White Plains Road rent stabilized?
NYC Department of Finance tax bills listed 38 rent-stabilized units here in 2024 (about 100% of its 37 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1380 White Plains Road built?
City records list 1927 as the year it was built.
How many apartments are in 1380 White Plains Road?
It has 37 residential units and 41 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.