roofy

1467 Taylor Avenue

Bronx, NY 10460BBL 2-03899-0040Map

Owner of record: 1467 T LLC

1467 Taylor Avenue is a walk-up apartment building built in 1930 in Bronx, 10460. It has 30 residential units across 5 floors. The owner of record is 1467 T LLC. HPD has recorded 168 housing violations here, most recently on June 1, 2026. 5 of the 50 most recent violations are still open. City tax records listed 30 rent-stabilized apartments here in 2024.

HPD violations
168
DOB violations
1
ECB violations
0
HPD complaints
149

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jun 1, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
30
About 100% of the building's 30 apartments
Up from 29 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 168

  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 19, 4th story, 2nd apartment from south at west

    Jun 1, 2026 · Apt 19

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 19, 4th story, 2nd apartment from south at west

    Jun 1, 2026 · Apt 19

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the foyer located at apt 19, 4th story, 2nd apartment from south at west

    Feb 25, 2026 · Apt 19

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the 1st room from north located at apt 19, 4th story, 2nd apartment from south at west

    Feb 25, 2026 · Apt 19

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the kitchen located at apt 19, 4th story, 2nd apartment from south at west

    Feb 25, 2026 · Apt 19

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of free standing refrigerator at north wall at public hall, 4th story

    Feb 25, 2026

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective radiator shut-off valve at east wall in the 3rd room from north located at apt 19, 4th story, 2nd apartment from south at west

    Feb 25, 2026 · Apt 19

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 19, 4th story, 2nd apartment from south at west

    Feb 25, 2026 · Apt 19

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 19, 4th story, 2nd apartment from south at west

    Feb 25, 2026 · Apt 19

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the kitchen located at apt 19, 4th story, 2nd apartment from south at west

    Feb 25, 2026 · Apt 19

    Closed — Violation dismissed
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the kitchen located at apt 19, 4th story, 2nd apartment from south at west

    Feb 25, 2026 · Apt 19

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 19, 4th story, 2nd apartment from south at west

    Feb 25, 2026 · Apt 19

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 19, 4th story, 2nd apartment from south at west

    Feb 1, 2026 · Apt 19

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, 1st door frame from east at south wall in the bathroom located at apt 19, 4th story, 2nd apartment from south at west

    Feb 1, 2026 · Apt 19

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 19, 4th story, 2nd apartment from south at west

    Feb 1, 2026 · Apt 19

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from east, the kitchen , the 1st room from east, the private hallway located at apt 19, 4th story, 2nd apartment from south at west

    Feb 1, 2026 · Apt 19

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 19, 4th story, 2nd apartment from south at west

    Feb 1, 2026 · Apt 19

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from west at north wall in the bathroom located at apt 19, 4th story, 2nd apartment from south at west

    Feb 1, 2026 · Apt 19

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at north 1 window in the bathroom located at apt 19, 4th story, 2nd apartment from west at north

    Jan 21, 2026 · Apt 19

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective gasket seal at refrigerator door in the kitchen located at apt 19, 4th story, 2nd apartment from west at north

    Jan 21, 2026 · Apt 19

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 19, 4th story, 2nd apartment from west at north

    Jan 21, 2026 · Apt 19

    Open — Notice of issuance sent to tenant
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of an air conditioner protruding from the window sill more than 4 inches at 1st fire escape from east at south, 4th story

    Jan 21, 2026

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 19, 4th story, 2nd apartment from south at west

    May 31, 2025 · Apt 19

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq ft at west wall in the bathroom located at apt 19, 4th story, 2nd apartment from south at west

    May 31, 2025 · Apt 19

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north located at apt 19, 4th story, 2nd apartment from south at west

    May 31, 2025 · Apt 19

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq ft at west wall in the 5th room from north located at apt 19, 4th story, 2nd apartment from south at west

    May 31, 2025 · Apt 19

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective bell buzzer intercom system from building entrance door to panel at west wall in the foyer located at apt 19, 4th story, 2nd apartment from south at west

    May 31, 2025 · Apt 19

    Open — Nov certified late
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 11, 2nd story, 1st apartment from east at south

    May 31, 2025 · Apt 11

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq ft at west wall in the 3rd room from north located at apt 19, 4th story, 2nd apartment from south at west

    May 31, 2025 · Apt 19

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 19, 4th story, 2nd apartment from south at west

    May 31, 2025 · Apt 19

    Closed — Violation dismissed
  • C

    Provide adequate supply of hot water for the fixtures at shower in the bathroom located at apt 11, 2nd story, 1st apartment from east at south

    Jan 14, 2025 · Apt 11

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective counter balance at lower window sash at south wall at public hall stairs, 2nd story

    Aug 23, 2024

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 11, 2nd story, 1st apartment from east at south

    Jul 31, 2024 · Apt 11

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective sink base cabinet at west wall in the kitchen located at apt 11, 2nd story, 1st apartment from east at south

    Jul 31, 2024 · Apt 11

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 11, 2nd story, 1st apartment from east at south

    Jul 31, 2024 · Apt 11

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 11, 2nd story, 1st apartment from east at south

    Jul 31, 2024 · Apt 11

    Closed — Violation dismissed
  • C

    Provide adequate supply of cold water for the fixtures no volume in the entire apartment located at apt 11, 2nd story, 1st apartment from east at south

    Jul 31, 2024 · Apt 11

    Closed — Violation closed
  • C

    Abate the infestation consisting of rodents rats in the entire apartment located at apt 11, 2nd story, 1st apartment from east at south

    Jul 31, 2024 · Apt 11

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 11, 2nd story, 1st apartment from east at south

    Jul 31, 2024 · Apt 11

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective buzzer and return voice intercom system from building entrance up to bell panel at west wall in the kitchen located at apt 11, 2nd story, 1st apartment from east at south

    Jul 31, 2024 · Apt 11

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 11, 2nd story, 1st apartment from east at south

    Jul 31, 2024 · Apt 11

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 11, 2nd story, 1st apartment from east at south

    Jul 31, 2024 · Apt 11

    Open — Not complied with
  • C

    Properly repair or replace the broken or defective mortise lock and assemblys at door in the entrance located at apt 7, 2nd story, 2nd apartment from south at west

    Mar 26, 2024 · Apt 7

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 7, 2nd story, 2nd apartment from south at west

    Mar 26, 2024 · Apt 7

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 7, 2nd story, 2nd apartment from south at west

    Mar 26, 2024 · Apt 7

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). additional needed in the entire apartment located at apt 7, 2nd story, 2nd apartment from south at west

    Mar 26, 2024 · Apt 7

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective [hinge] door in the entrance located at apt 7, 2nd story, 2nd apartment from south at west

    Mar 26, 2024 · Apt 7

    Open — Invalid certification
  • C

    Remove the illegal fastening key operated lock set installed on door leading to room with fire escape in the 1st room from north located at apt 7, 2nd story, 2nd apartment from south at west

    Mar 26, 2024 · Apt 7

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the foyer located at apt 7, 2nd story, 2nd apartment from south at west

    Mar 26, 2024 · Apt 7

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak above ceiling near north wall in the bathroom located at apt 7, 2nd story, 2nd apartment from south at west

    Mar 26, 2024 · Apt 7

    Closed — Violation dismissed

DOB building violations · 1

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Appliance

    Electric/gas range

    Apr 13, 2026 · Apt 19

    Close
  • Water leak

    Heavy flow

    Mar 5, 2026 · Apt 8

    Close
  • Heat/hot water

    Apartment only

    Feb 23, 2026 · Apt 19

    Close
  • Flooring/stairs

    Floor

    Feb 23, 2026 · Apt 19

    Close
  • Plumbing

    Bathtub/shower

    Feb 11, 2026 · Apt 10

    Close
  • Water leak

    Heavy flow

    Feb 11, 2026 · Apt 10

    Close
  • Heat/hot water

    Apartment only

    Jan 20, 2026 · Apt 19

    Close
  • Heat/hot water

    Apartment only

    Jan 20, 2026 · Apt 8

    Close
  • Heat/hot water

    Apartment only

    Jan 18, 2026 · Apt 19

    Close
  • Water leak

    Damp spot

    Dec 23, 2025 · Apt 8

    Close
Show 40 more ↓
  • Plumbing

    Basin/sink

    Dec 23, 2025 · Apt 8

    Close
  • Heat/hot water

    Entire building

    Nov 18, 2025 · Apt 23

    Close
  • Plumbing

    Bathtub/shower

    Nov 8, 2025 · Apt 19

    Close
  • Water leak

    Slow leak

    Feb 7, 2025 · Apt 19

    Close
  • General

    Bell/buzzer/intercom

    Feb 7, 2025 · Apt 19

    Close
  • Plumbing

    Water supply

    Jan 11, 2025 · Apt 11

    Close
  • Heat/hot water

    Apartment only

    Jan 11, 2025 · Apt 11

    Close
  • Plumbing

    Bathtub/shower

    Jan 9, 2025 · Apt 11

    Close
  • Heat/hot water

    Apartment only

    Jan 6, 2025 · Apt 11

    Close
  • General

    Bell/buzzer/intercom

    Jun 27, 2024 · Apt 11

    Close
  • Plumbing

    Basin/sink

    Jun 27, 2024 · Apt 11

    Close
  • General

    Cabinet

    Jun 27, 2024 · Apt 11

    Close
  • General

    Cabinet

    Jun 27, 2024 · Apt 11

    Close
  • Safety

    Carbon monoxide detector

    Jun 27, 2024 · Apt 11

    Close
  • Paint/plaster

    Wall

    Jun 27, 2024 · Apt 11

    Close
  • Plumbing

    Bathtub/shower

    Jun 27, 2024 · Apt 11

    Close
  • Water leak

    Slow leak

    Feb 29, 2024 · Apt 7

    Close
  • Door/window

    Door

    Feb 23, 2024 · Apt 7

    Close
  • General

    Cabinet

    Feb 23, 2024 · Apt 7

    Close
  • Flooring/stairs

    Floor

    Feb 23, 2024 · Apt 7

    Close
  • Water leak

    Slow leak

    Feb 23, 2024 · Apt 7

    Close
  • Electric

    Power outage

    Jan 19, 2024 · Apt 20

    Close
  • Electric

    Power outage

    Jan 19, 2024 · Apt 11

    Close
  • Electric

    Power outage

    Jan 19, 2024 · Apt 10

    Close
  • Electric

    Power outage

    Jan 19, 2024 · Apt 19

    Close
  • Water leak

    Heavy flow

    Jan 19, 2024 · Apt 20

    Close
  • Paint/plaster

    Ceiling

    Jan 19, 2024 · Apt 20

    Close
  • Electric

    Power outage

    Jan 19, 2024 · Apt BLDG

    Close
  • Door/window

    Window pane

    Dec 8, 2023 · Apt 12A

    Close
  • Paint/plaster

    Wall

    Sep 18, 2023 · Apt 26

    Close
  • Plumbing

    Bathtub/shower

    Sep 18, 2023 · Apt 26

    Close
  • Door/window

    Window frame

    Sep 18, 2023 · Apt 26

    Close
  • Plumbing

    Basin/sink

    Sep 18, 2023 · Apt 26

    Close
  • Flooring/stairs

    Floor

    Sep 18, 2023 · Apt 26

    Close
  • Plumbing

    Basin/sink

    Sep 18, 2023 · Apt 26

    Close
  • Paint/plaster

    Wall

    Sep 18, 2023 · Apt 26

    Close
  • Water leak

    Slow leak

    Sep 18, 2023 · Apt 26

    Close
  • Door/window

    Door

    Aug 23, 2023 · Apt 11

    Close
  • Safety

    Carbon monoxide detector

    Aug 23, 2023 · Apt 11

    Close
  • Safety

    Smoke detector

    Aug 23, 2023 · Apt 11

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1930
Floors
5
Residential units
30
Building area
24,185 ft²
Lot area
6,700 ft²
Zoning
R6
Community board
209
Council district
17
Block / lot
3899 / 40
Assessed value
$613,350
Landmark / historic district
No

HPD registration #206277, last renewed Aug 11, 2025.

Questions about 1467 Taylor Avenue

Who owns 1467 Taylor Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 1467 T LLC.

Does 1467 Taylor Avenue have violations?

Yes. NYC HPD has recorded 168 housing violations at this property.

Is 1467 Taylor Avenue rent stabilized?

NYC Department of Finance tax bills listed 30 rent-stabilized units here in 2024 (about 100% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 1467 Taylor Avenue built?

City records list 1930 as the year it was built.

How many apartments are in 1467 Taylor Avenue?

It has 30 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.