roofy

1141 Elder Avenue

Bronx, NY 10472BBL 2-03739-0059Map

Owner of record: 1141 Elder Realty LLC

1141 Elder Avenue is a walk-up apartment building built in 1928 in Bronx, 10472. It has 48 residential units across 5 floors. The owner of record is 1141 Elder Realty LLC. HPD has recorded 1,629 housing violations here, most recently on September 29, 2026. 48 of the 50 most recent violations are still open. City tax records listed 48 rent-stabilized apartments here in 2024.

HPD violations
1,629
DOB violations
21
ECB violations
51
HPD complaints
2,988

What to know

Concern
15 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
48
About 100% of the building's 48 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 1,629

  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the bathroom located at apt b4, 2nd story, 2nd apartment from north at east

    Sep 29, 2026 · Apt B4

    Open — Violation will be reinspected
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall, 1st window frame from south at west wall in the 3rd room from north at west located at apt b4, 2nd story, 2nd apartment from north at east

    Sep 29, 2026 · Apt B4

    Open — Violation will be reinspected
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from north at east wall in the 3rd room from north at east located at apt b4, 2nd story, 2nd apartment from north at east

    Sep 29, 2026 · Apt B4

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the 3rd room from north at west located at apt b4, 2nd story, 2nd apartment from north at east

    Sep 29, 2026 · Apt B4

    Open — Certification postponment granted
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt b4, 2nd story, 2nd apartment from north at east

    Sep 29, 2026 · Apt B4

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt b4, 2nd story, 2nd apartment from north at east

    Sep 29, 2026 · Apt B4

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... greater than 1o square feet at the east wall and the south wall in the bathroom located at apt b4, 2nd story, 2nd apartment from north at east

    Sep 29, 2026 · Apt B4

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, ceiling, south wall in the 3rd room from north at west located at apt b4, 2nd story, 2nd apartment from north at east

    Sep 29, 2026 · Apt B4

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from north at east, the kitchen located at apt b4, 2nd story, 2nd apartment from north at east

    Sep 29, 2026 · Apt B4

    Open — Nov sent out
  • A

    Repair the leaky and/or defective faucets at the bath tub in the bathroom located at apt b4, 2nd story, 2nd apartment from north at east

    Sep 29, 2026 · Apt B4

    Open — Nov sent out
Show 40 more ↓
  • A

    Replace with new the missing upper escutcheon plate at the south 1 steam riser in the kitchen located at apt b4, 2nd story, 2nd apartment from north at east

    Sep 29, 2026 · Apt B4

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration the drywall partition erected from the floor to the ceiling blocking airflow and light in the 1st room from north at east located at apt b4, 2nd story, 2nd apartment from north at east

    Sep 29, 2026 · Apt B4

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the south wall, east wall, north wall, west wall in the bathroom located at apt b4, 2nd story, 2nd apartment from north at east

    Sep 29, 2026 · Apt B4

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, ceiling, north wall, south wall in the 3rd room from north at east located at apt b4, 2nd story, 2nd apartment from north at east

    Sep 29, 2026 · Apt B4

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at east wall in the 1st room from north located at apt b10, 2nd story, 2nd apartment from south at west

    Aug 7, 2026 · Apt B10

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective elctrical outlet at north wall in the kitchen located at apt b10, 2nd story, 2nd apartment from south at west

    Aug 7, 2026 · Apt B10

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt b10, 2nd story, 2nd apartment from south at west

    Aug 7, 2026 · Apt B10

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroom located at apt b10, 2nd story, 2nd apartment from south at west

    Aug 7, 2026 · Apt B10

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at south wall in the 2nd room from north located at apt b10, 2nd story, 2nd apartment from south at west

    Aug 7, 2026 · Apt B10

    Open — Nov sent out
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Aug 7, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt b10, 2nd story, 2nd apartment from south at west

    Aug 7, 2026 · Apt B10

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt b10, 2nd story, 2nd apartment from south at west

    Aug 7, 2026 · Apt B10

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt b10, 2nd story, 2nd apartment from south at west

    Aug 7, 2026 · Apt B10

    Open — Notice of issuance sent to tenant
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Aug 7, 2026

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Aug 7, 2026

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at south wall in the bathroom located at apt b10, 2nd story, 2nd apartment from south at west

    Aug 7, 2026 · Apt B10

    Open — Notice of issuance sent to tenant
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 7, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt b10, 2nd story, 2nd apartment from south at west

    Aug 7, 2026 · Apt B10

    Open — Notice of issuance sent to tenant
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt b10, 2nd story, 2nd apartment from south at west

    Aug 7, 2026 · Apt B10

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 7, 2026

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt e4, 5th story, 2nd apartment from north at east

    Aug 5, 2026 · Apt E4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt e4, 5th story, 2nd apartment from north at east

    Aug 5, 2026 · Apt E4

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective ceiling light in the kitchen located at apt e4, 5th story, 2nd apartment from north at east

    Aug 5, 2026 · Apt E4

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak at ceiling in the kitchen located at apt e4, 5th story, 2nd apartment from north at east

    Aug 5, 2026 · Apt E4

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt e4, 5th story, 2nd apartment from north at east

    Aug 5, 2026 · Apt E4

    Open — Notice of issuance sent to tenant
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt e4, 5th story, 2nd apartment from north at east

    Aug 5, 2026 · Apt E4

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt e4, 5th story, 2nd apartment from north at east

    Aug 5, 2026 · Apt E4

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt e4, 5th story, 2nd apartment from north at east

    Aug 5, 2026 · Apt E4

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch set , 1st story

    Aug 5, 2026

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective lock and assembly at building entrance door , 1st story

    Apr 15, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story

    Apr 15, 2026

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east and north wall in the 3rd room from north at east located at apt e4, 4th story, 2nd apartment from north at east

    Apr 1, 2026 · Apt E4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective at bathtub with porcelain enamel by method of reglaze in the bathroom located at apt e4, 4th story, 2nd apartment from north at east

    Apr 1, 2026 · Apt E4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north at east located at apt e4, 4th story, 2nd apartment from north at east

    Apr 1, 2026 · Apt E4

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north at east located at apt e4, 4th story, 2nd apartment from north at east

    Apr 1, 2026 · Apt E4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt e4, 4th story, 2nd apartment from north at east

    Apr 1, 2026 · Apt E4

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt e4, 4th story, 2nd apartment from north at east

    Apr 1, 2026 · Apt E4

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling aproxx 6 sq ft in the kitchen located at apt e4, 4th story, 2nd apartment from north at east

    Apr 1, 2026 · Apt E4

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at east wall in the kitchen located at apt e4, 4th story, 2nd apartment from north at east

    Apr 1, 2026 · Apt E4

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt e4, 4th story, 2nd apartment from north at east

    Apr 1, 2026 · Apt E4

    Open — Nov sent out

DOB building violations · 21

  • Construction other optional

    Ftc w/commissioner's order control#370520 vio#071626pi20902hz dated 07/16/2026 requiring owner to provide a corrective action plan by 08/07/2026. as of 09/17/2026 the req'd cap was not rec'd. immed comply with commissioner's order control#370520 vio#071626pi20902hz

    Sep 17, 2026

    Dob violation - active
  • Construction other optional

    Corrective action plan req'd-large portions of missing stucco,partly detached,cracked & bulging from brick masonry,vert step cracks to bricks & moratr,missing bricks @ corner edges. owner to immed retain reg design prof in good standing with dob&nys to eval entire bldg and submit a corrective action plan

    Jul 16, 2026

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 21, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 21, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 8, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 8, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 8, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 8, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 22, 2012

    Dob violation - dismissed
Show 11 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 51

  • Class - 1

    Failure to maintain building in code-compliant manner. i observed hazardous conditions at various locations and areas at risk of collapse with brick exterior walls, masonry surfaces. stonework attached to the b

    Jul 16, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway.as noted:atoi observed@front exp 2&3fl acunits partially obstructing fire escape egress.remove obstruction.maintain exit passageways.

    Sep 13, 2022

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35387110h issued on 08/04/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. installed gas piping to either commercial/clothes dryers w/o

    Sep 14, 2018

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation #35311104k issued on 12/26/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit.no

    Aug 4, 2018

    Resolve
  • Class - 1

    Failure to comply w/ the commissioner's order contained in summons/violation# 35337773n issued on 5/14/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. installed gas lines w/out a permit. rem: comply

    Jun 23, 2018

    Resolve
  • Class - 1

    Failure to comply w/ the commissioner's order contained in summons/violation# 35311104k issued on 12/26/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/out permit: note gas supply line to comm

    May 14, 2018

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summ/vio#35311104k issued on 12-26-17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/the comm's order & or file a c of c.

    Mar 31, 2018

    Resolve
  • Class - 1

    Failure to comply w/commissioner's order contained in summons/violati 0n #35311104k issued on 12/26/17 and to file a certificate of correctin pursuant to 28-201.1 and 1rcny 102-01. work w/o permit. note: gas u

    Feb 18, 2018

    Resolve
  • Class - 1

    Removed or defaced a written posted vacate order. noted: at the time of inspection,vacate order was observed to have been removed. vacate order was posted on 11-15-16 by badge#2246 for 1 illegal apt at cellar.

    Jan 25, 2018

    Resolve
  • Class - 2

    Failure to maintain building inn code-compliant manner:lack of a system of automatic sprinklers where required per bc903.2;27-954.observed in commercial laundry facility in cellar eight commerical clothes dryer

    Dec 26, 2017 · Penalty $500

    Resolve
Show 40 more ↓
  • Class - 1

    Work w/o a permit. observed gas supply piping to either commercial clothese dryers installed w/o permitted approval from dob. rmdy: obtain all required permits. photos taken.

    Dec 26, 2017

    Resolve
  • Class - 1

    Failure to have new or altered plumbing system tested. observed gas supply piping installed for eight commercial clothes dryers in laundryfacility in cellar. dob records do not show that any test have been

    Dec 26, 2017

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35244803m issued on 06/17/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no documents file for failure to maintain bldg in code co

    Aug 5, 2017 · Penalty $400

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35270974x issued on 06/15/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no document file for work w/o a permit at basement level.

    Aug 5, 2017

    Resolve
  • Class - 2

    Failure to maintain: noted at time of inspection fire escape obstructed/blocked by a/c in window at the 4th fl in case of a fire bldg occupants do not have a travel path down. remedy: maintain bldg in code comp

    Jun 17, 2017 · Penalty $500

    Resolve
  • Class - 2

    Unapproved,unsafe,unsuitable electrical equipment,materials,apparatus device,appliance or wiring in use.observed lamp cord wiring use as permanent wiring opening wires and splices.throughout bath basement areas

    Jun 15, 2017 · Penalty $400

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner.re:installation maintenance of plumbing materials equipment per pc102.3;27-902 observed on 6/15/17 at above address jim caps and fernco couplings installed

    Jun 15, 2017 · Penalty $500

    Resolve
  • Class - 2

    Failure to maintain in code-compliant manner:no fire stopping per bc712.3;27-345 noted:cellar level both sides,open holes mising fire stopping thru out cellar,holes pipe are thru wall and in ceiling.

    Jun 15, 2017

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner.observed on 6/15/17 in basement at above address excessive storage in gas meter room.also cracked 4 inch quarter bend(hub),also broken waste pipe 4inch in b

    Jun 15, 2017 · Penalty $500

    Resolve
  • Class - 2

    Failure to provide ground fault circuit interupter protection as required.observed a 24 ckt panel in laundry area supplying power to washingmachines with no gfci protection.rem:comply with code.

    Jun 15, 2017 · Penalty $1,200

    Resolve
  • Class - 2

    Sec. 401.1 misc violations. gas piping not labeled observed on 6-15-17 at above address gas piping in basement is not labeled. remedy: comply w/summons.

    Jun 15, 2017 · Penalty $400

    Resolve
  • Class - 1

    Work without a permit.observed on 6/15/17 at above address in basementgas piping to dryers(commercial)in laundry room without any permits onfile at the dob also plumbing to washing machines and dranage without

    Jun 15, 2017

    Resolve
  • Class - 2

    Electrical work without a permit.observed installation of conduit frompublic light and power panel to apt b3 riser cable which was not terminated properly.also noted ceiling lights installed throughout building

    Jun 15, 2017 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35221526l issued on 11/15/16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for: illegal occupancy @ cellar level. remedy: comply w/comm's

    Jan 6, 2017 · Penalty $400

    Resolve
  • Class - 2

    Failure to naintain bldg walls or appurtenances defects noted: exterior wall at exp#2 & 4(court yard) has approx 1 1/2"wide cracks below window sills. remedy: maintain exterior bldg wall.

    Nov 15, 2016 · Penalty $250

    Resolve
  • Class - 1

    Failure to have new or altered plumbing system tested. at the time of my inspection 11:45am on 11-15-16 at the above place of occurance address i observed installed & operationsl commercial working machines &

    Nov 15, 2016 · Penalty $1,000

    Active
  • Class - 2

    Exit door not self closing. note: the following doors not self closing. 2 bulkhead doors to roof level & 1st fl right side exit door. remedy: repair/replace doors.

    Nov 15, 2016 · Penalty $250

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the c of o or bldg dept records.c of o #3302 indicates cellar on ground to be 1 superintendants apt,boiler rm & storage. illegal occupancy noted: at cellar level(meter room

    Nov 15, 2016 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. 411.1 misc violation residential gas flex used on commercial equipment. at the time of my inspection 11:45am on 11-15-16 at the above place of occurance address i observed in the laundry facility in the

    Nov 15, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 408.2 misc violation future connection installed gas piping. at the time of my inspection 11:45am on 11-15-16 at the above place of occurance address i observed throughout the cellar area numerous future

    Nov 15, 2016

    Resolve
  • Class - 1

    Work w/o a permit. at the time of my inspection 11:45am on 11-15-16 at the above place of occurance address i observed in the cellar area commercial working machines & gas fired commercial dryers installed & in

    Nov 15, 2016

    Resolve
  • Class - 3

    Failure to maintain bldg in code compliant manner. defects noted: water damage to ceiling @ 3rd flr apt#c6 bathroom. rem: comply w/ nov.

    May 11, 2016 · Penalty $100

    Resolve
  • Class - 1

    Electrical work w/o permit. electrical wiring of feeders to apt disconnect switch. at 11:30 am observed that wiring of feeders to apt disconnect switch had been installed prior to obtaining permit.remedy:obtain

    Jul 25, 2013

    Resolve
  • Class - 1

    Sec. ec 240.3. violation of the electrical code technical standards. over fused at disconnect switch for apts risers. at 11:30 am observed that apt disconnect switches are over fused. remedy: comply w/ec code.

    Jul 25, 2013 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. ec 240.53 violation of the electrical code technical standards. plug fuses in use apt. disconnect switches are not tamper proof. at 11:30 am observed in cellar that plug fuses are in use. and are not

    Jul 25, 2013 · Penalty $1,600

    Resolve
  • Class - 1

    Electrical work w/o a permit. bsmt service equipment for both a & b side: sub feeders,sub panels,100amp. "please note" these 2 apps not covered re above work y158108,y116303. remedy: obtain permit.

    Jul 9, 2013

    Resolve
  • Class - 1

    Unapproved,unsafe/suitable electrical equipment,appuratus,materials,devices,appliances or wiring in use. the entire bsmt both side a & b. defective open wiring are in use,defective lighting fluorescent fixtures

    Jul 9, 2013 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to provide unobstructed exit passage noted at fire escapes front of bldg various air condition units installed on windows facing directly to fe balcony also observed flower pots and other objects on fe

    Jul 18, 2012

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner. defect noted:atrear yard pavement has various cracks throughout,at north west corner is severly crack & uneven. at left & right side yards pavement alsoha

    Dec 1, 2011 · Penalty $1,000

    Resolve
  • Class - 2

    B254/16/50a/50b/50c/50e/50a-soot on boiler & burner/50b-cover missing on npressure tron/50c-pigtail missing from pressure gauge & must be brass/50d-glass in rear of boiler missing to sight fire/50e-remove band

    Feb 8, 2011

    Resolve
  • Class - 2

    Failure to comply w/the comm's order to file a coff w/the dob respondent failed to comply w/the comm's order to correct teh violating conditions and file a cofc pursant to 28-204.2 for notice of vio 34735346x

    Aug 18, 2009 · Penalty $4,000

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner. noted: the ceiling in apt (a7) is cracked & fell down. in the hallway between the enterence door & living room. the sink in the bathroom is broken & detach

    Feb 9, 2009 · Penalty $5,000

    Resolve
  • Hazardous

    Failure to maintain exterior bldg wall. defect noted:south exterior and south courtyard walls have cracks,bulging brick, eroded mortor joints.missing coping stones at various locations.remedy:maintain exterio

    Jul 25, 2003 · Penalty $10,000

    Resolve
  • Hazardous

    Required means of egress obstructed.noted:south fire passage gate at front chained and padlocked.same passageway at rear southwest corner blocked by plywood and excessive construction debris area approx 8ftx8ft

    Jul 25, 2003 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain exterior bldg wall. defect is:south exterior and south courtyard walls have large cracks, bulging bricks, eroded mortar joints and missing coping stones at various locations. remedy:immed

    Apr 15, 2003 · Penalty $10,000

    Resolve
  • Hazardous

    Failure to maintain exterior building wall. defect is: brick work is missing, bulging loose and cracked at various locations of side wall. coping stones are missing and loose on side parapet wall.

    Jan 8, 2003 · Penalty $10,000

    Resolve
  • Hazardous

    Failure to maintian. defect is: sectionof bathroom and kitchen ceiling inapartment d7 has collapsed remaining sections are hanging, pulling away and in danger of falling. remedy: immediately reapair defects.

    Nov 13, 2002 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain exterior buiding wall. defect is: brick work is missing, bulding loose, cracked at various locations of side wall and coping stones are missing onside parapet wall. remedy; immediately repai

    Nov 13, 2002 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain exterior building wall defects noted 1, parapit wal missing brick & coping stone mortar missing brick spalling 2, brickscracking between various floor & windows: locaction throut east to wes

    Oct 7, 2002 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain exterior building wall.defect is brick work is missing,building loose cracked at various locations of side wall. 2coping stones missing on side parapet wall 3 step is missing at top of 4 fl

    Aug 27, 2002 · Penalty $2,500

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Sep 26, 2026 · Apt B4

    Close
  • Paint/plaster

    Ceiling

    Sep 26, 2026 · Apt B4

    Close
  • Unsanitary condition

    Mold

    Sep 17, 2026 · Apt B4

    Close
  • Water leak

    Slow leak

    Sep 17, 2026 · Apt B4

    Close
  • Paint/plaster

    Wall

    Sep 16, 2026 · Apt D3

    Close
  • Unsanitary condition

    Pests

    Sep 16, 2026 · Apt D3

    Close
  • Appliance

    Electric/gas range

    Sep 16, 2026 · Apt D3

    Close
  • General

    Cabinet

    Sep 16, 2026 · Apt D3

    Close
  • Paint/plaster

    Wall

    Sep 16, 2026 · Apt D3

    Close
  • Flooring/stairs

    Floor

    Sep 16, 2026 · Apt D3

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Jul 22, 2026 · Apt B10

    Close
  • Electric

    Outlet/switch

    Jul 22, 2026 · Apt B10

    Close
  • Electric

    Outlet/switch

    Jun 9, 2026 · Apt D9

    Close
  • Door/window

    Door

    Jun 9, 2026 · Apt D9

    Close
  • Unsanitary condition

    Pests

    Jun 9, 2026 · Apt D9

    Close
  • Paint/plaster

    Radiator

    Jun 9, 2026 · Apt D9

    Close
  • Plumbing

    Bathtub/shower

    Jun 9, 2026 · Apt D9

    Close
  • Paint/plaster

    Ceiling

    Jun 9, 2026 · Apt D9

    Close
  • Paint/plaster

    Wall

    Jun 9, 2026 · Apt D9

    Close
  • Unsanitary condition

    Pests

    Jun 9, 2026 · Apt D9

    Close
  • Appliance

    Electric/gas range

    May 14, 2026 · Apt E6

    Close
  • Appliance

    Electric/gas range

    May 9, 2026 · Apt E6

    Close
  • Safety

    Fire escape

    Mar 28, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Mar 28, 2026 · Apt BLDG

    Close
  • General

    Signage missing

    Mar 28, 2026 · Apt BLDG

    Close
  • Door/window

    Window frame

    Mar 28, 2026 · Apt D6

    Close
  • Plumbing

    Radiator

    Mar 28, 2026 · Apt D6

    Close
  • General

    Bell/buzzer/intercom

    Mar 28, 2026 · Apt D6

    Close
  • Unsanitary condition

    Mold

    Mar 28, 2026 · Apt D6

    Close
  • Heat/hot water

    Apartment only

    Mar 28, 2026 · Apt D6

    Close
  • Flooring/stairs

    Floor

    Mar 28, 2026 · Apt D6

    Close
  • Electric

    Lighting

    Mar 28, 2026 · Apt D6

    Close
  • Safety

    Carbon monoxide detector

    Mar 28, 2026 · Apt D6

    Close
  • Electric

    Outlet/switch

    Mar 28, 2026 · Apt D6

    Close
  • General

    Cabinet

    Mar 28, 2026 · Apt D6

    Close
  • Electric

    Lighting

    Mar 28, 2026 · Apt D6

    Close
  • Plumbing

    Basin/sink

    Mar 28, 2026 · Apt D6

    Close
  • Electric

    Lighting

    Mar 28, 2026 · Apt D6

    Close
  • Unsanitary condition

    Mold

    Mar 28, 2026 · Apt D6

    Close
  • Appliance

    Refrigerator

    Mar 28, 2026 · Apt D6

    Close
  • Unsanitary condition

    Pests

    Mar 28, 2026 · Apt D6

    Close
  • Unsanitary condition

    Pests

    Mar 28, 2026 · Apt D6

    Close
  • Door/window

    Door

    Mar 28, 2026 · Apt D6

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 28, 2026 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Mar 28, 2026 · Apt D6

    Close
  • Flooring/stairs

    Floor

    Mar 27, 2026 · Apt E4

    Close
  • Paint/plaster

    Ceiling

    Mar 27, 2026 · Apt E4

    Close
  • Electric

    Outlet/switch

    Mar 27, 2026 · Apt E4

    Close
  • Paint/plaster

    Wall

    Mar 27, 2026 · Apt E4

    Close
  • Plumbing

    Bathtub/shower

    Mar 27, 2026 · Apt E4

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1928
Floors
5
Residential units
48
Building area
36,500 ft²
Lot area
10,000 ft²
Zoning
R6
Community board
209
Council district
17
Block / lot
3739 / 59
Assessed value
$903,150
Landmark / historic district
No

HPD registration #201613, last renewed Oct 29, 2025.

Questions about 1141 Elder Avenue

Who owns 1141 Elder Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 1141 Elder Realty LLC.

Does 1141 Elder Avenue have violations?

Yes. NYC HPD has recorded 1,629 housing violations at this property.

Is 1141 Elder Avenue rent stabilized?

NYC Department of Finance tax bills listed 48 rent-stabilized units here in 2024 (about 100% of its 48 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 1141 Elder Avenue built?

City records list 1928 as the year it was built.

How many apartments are in 1141 Elder Avenue?

It has 48 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.