16 East 204 Street is an elevator apartment building built in 2017 in Bronx, 10468. It has 54 residential units across 12 floors. The owner of record is Hp Villa Gardens HDFC, INC.. HPD has recorded 26 housing violations here, most recently on May 27, 2026. 14 of the 26 most recent violations are still open. City tax records listed 53 rent-stabilized apartments here in 2024.
- HPD violations
- 26
- DOB violations
- 12
- ECB violations
- 23
- HPD complaints
- 71
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 26
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 3rd room from east at south located at apt 3a, 3rd story, 1st apartment from east at south
May 27, 2026 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at 1st closet from south at west, ceiling and walls in the 1st room from east located at apt 3a, 3rd story, 1st apartment from east at south
May 27, 2026 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling inside closet in the 1st room from east located at apt 4a, 4th story, 1st apartment from east at south
Apr 15, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceilingn and west wall in the 1st room from east located at apt 4a, 4th story, 1st apartment from east at south
Apr 15, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at south wall inside closet in the 1st room from east located at apt 4a, 4th story, 1st apartment from east at south
Apr 15, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from east at south
Mar 31, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and south wall in the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from east at south
Mar 31, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north
Jan 17, 2026 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches at public hall, 4th story
Jan 17, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective the lockset at entrance door to apt in the entrance located at apt 4d, 4th story, 1st apartment from west at north
Jan 17, 2026 · Apt 4D
Closed — Violation dismissed
Show 16 more ↓
- CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures to all outlets and fixtures in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north
Jan 17, 2026 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north
Jan 17, 2026 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at south located at apt 3a, 3rd story, 1st apartment from east at south
Dec 12, 2025 · Apt 3A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 3rd room from east at south located at apt 3a, 3rd story, 1st apartment from east at south
Dec 12, 2025 · Apt 3A
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak south wall in the 3rd room from east at south located at apt 3a, 3rd story, 1st apartment from east at south
Dec 12, 2025 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north
Apr 9, 2025 · Apt 3D
Open — Notice of issuance sent to tenant - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north and south walls in the private hallway located at apt 3d, 3rd story, 1st apartment from west at north
Apr 9, 2025 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electric outlet at south wall in the private hallway located at apt 3d, 3rd story, 1st apartment from west at north
Apr 9, 2025 · Apt 3D
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from east at north located at apt 3d, 3rd story, 1st apartment from west at north
Apr 9, 2025 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north
Sep 25, 2024 · Apt 3D
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallway located at apt 3d, 3rd story, 1st apartment from west at north
Sep 25, 2024 · Apt 3D
Open — Nov certified late - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 3d, 3rd story, 1st apartment from west at north
Sep 25, 2024 · Apt 3D
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 3d, 3rd story, 1st apartment from west at north
Sep 25, 2024 · Apt 3D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from east located at apt 4a, 4th story, 1st apartment from east at south
Mar 4, 2024 · Apt 4A
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 12
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2020
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - dismissed - Construction other optional
Failure to provide all required informatin due to site safety cordinat or withdrawal from applicaiton 220415012. stop all work provide inform ation forthwith
Mar 6, 2018
Dob violation - dismissed - Construction other optional
Failure to provide all required information for application 220551123 due to withdrawal of site safety coordinator. stop all work provide re quired information forthwith
Mar 6, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 26, 2017
Dob violation - dismissed
Show 2 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 26, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 12, 2017
Dob violation - dismissed
ECB violations · 23
- Class - 2
Failure to provide approved / accepted plans at job site at time of inspection at time of spot check for waste, water, sewer, vent, gas and storm drain roughing for floors cellar and first floor no approved pla
Sep 5, 2019
Resolve - Class - 1
Permit holder failed to ensure each construction worker successfully completed the required training under bc 3321.1: observed denfield brown at a building site for which a construction superintendent, ssm or s
May 9, 2019 · Penalty $1,250
Resolve - Class - 1
Owner failed to ensure each construction worker successfully completed the required training under bc 3321.1: observed denfield brown at a building site for which a construction superintendent, ssm or ssc is re
May 9, 2019
Resolve - Class - 1
Work does not conform to approved plans proposed nb, at 12 story leveli observed on the third and fourth floor. needle beam outriggers in palce as support platform for the exterior supported scaffold that was
Feb 14, 2019 · Penalty $2,500
Resolve - Class - 1
1704.1.1:failure to file a special inspection statement of responsibility prior to permit issurance & prior to stat of work.-at the time of inspection it was observed that the contractors performed steel opera
Nov 7, 2018
Resolve - Class - 1
Failure to notify the department prior to commencement of earthwork.-at the time of inspection it was observed that the contractors were in the process of erecting a 12 story building.upon review of department
Nov 7, 2018 · Penalty $2,500
Resolve - Class - 1
Work contrary to site safety plan(approved)12 story new building under construction.bulkhead level active jobsite,at the time of my inspction i observed work is contrary to ssp;scaffold installed in exp.4(front
Nov 7, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to maintain adequuate housekeeping per requirements.at time of inspection on an active jobsite i observed lots of debris and material scattered throughout the jobsite and sidewalk shed.sws is to be main
Nov 7, 2018
Resolve - Class - 2
Work contrary to construction documents.12 sory building(new)under construction bulkhead level active job site at the time of my inspection i observed that the scaffold was installed contrary to approved plan/
Nov 7, 2018 · Penalty $625
Resolve - Class - 1
Failure to perform successful hydrostatic pressure test of standpipe system.at time of inspection on an active jobsite of a 12 story,i observed building is above 75 feet,after reviewing of records revealed that
Nov 7, 2018 · Penalty $5,000
Resolve
Show 13 more ↓
- Class - 1
Failure to safeguard all persons and proeprty affected by constructionoperations. mobile crane cn#1142/17 co#4932 was in operation operated by h.m.o. patrick tarrang #9705 exp 6/30/21 class b he landed a plank
Aug 27, 2018 · Penalty $10,000
Resolve - Class - 1
Inadequate safety measures-operation of crane or hoisting equipment in an unsafe manner. crane operator patrick tarrant was operating mobile crane(cd#4932 cn:1142/17) when the guide rope which was tied to the s
Aug 27, 2018 · Penalty $10,000
Resolve - Class - 1
Inadequate safety measures operaiotn of crane hoisting equipment in an unsafe manner. hmo patrick was operating mobile crane co#4932 cn#1142117 when the guide rope which was tied to the slings snagged a s() pos
Aug 27, 2018
Resolve - Class - 1
Respondent failed to have a lift director on site as required. @ time of insp mobile crane cn# 1142/17 cd# 4982 was in operation, operator by keith echevarria lic# 10046 exp 6/3/20 class a. designated lift dire
Jul 3, 2018 · Penalty $10,000
Resolve - Class - 1
Respondent failed to have a lift director on site as required. @ time of insp mobile crane cw# 1142/17 cd# 4932 was in operation, operated by hmu keith echerorria lic# 10046 exp 6/3/20 class a. designated lift
Jul 3, 2018
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments: note at time of inspection of a purposes 12 story new building at 5 story phase. while examining site saety plan i observed
Apr 25, 2018 · Penalty $620
Resolve - Class - 1
Failure to protect or adequately protect adjoining properties during construction operations. note at time of inspection of a proposed 12 story new building at 5 story phase. i observe that adjoining properti
Apr 25, 2018 · Penalty $2,500
Resolve - Class - 1
Bc3303.4.7 storage of materials. at time of inspection of a proposed 12 story new building at 5story phase. i observe construction materialstored on broadway adjacent ot sidewalk more than 3'high (approx 4-5'f
Apr 25, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/vio # 35245436y issued on 04/22/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply with commissioner's order &/or file
Jul 11, 2017
Resolve - Class - 1
Failure to provide adequate approved plans.at time of inspection observed an active construction site with excavation work in progress.during inspection noted that in the soe plans notes says that a w10x33 hori
Apr 24, 2017 · Penalty $800
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.during inspection responding to an incident observed damageext wall and foundation wall at exposure #2 because excavation operati
Apr 24, 2017 · Penalty $10,000
Resolve - Class - 2
Bc3301.7 failure to provide monitoring reports at time of inspection.at time of inspection responding to an incident observed an active construction site with excavation work in progress.during inspection reque
Apr 24, 2017
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operation: north elevation wall or adjacent bldg #3030 jerome ave,have the defects due to construction activity-underpinning. at the above nb
Apr 22, 2017 · Penalty $10,000
Resolve
Complaints
- Water leak
Slow leak
May 18, 2026 · Apt 3A
Close - Unsanitary condition
Mold
May 18, 2026 · Apt 3A
Close - Unsanitary condition
Mold
May 18, 2026 · Apt 3A
Close - Paint/plaster
Wall
May 18, 2026 · Apt 3A
Close - Paint/plaster
Wall
May 18, 2026 · Apt 3A
Close - Unsanitary condition
Pests
May 13, 2026 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
May 13, 2026 · Apt 3A
Close - Unsanitary condition
Sewage
May 13, 2026 · Apt 3A
Close - Unsanitary condition
Pests
May 13, 2026 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
May 12, 2026 · Apt BLDG
Close
Show 40 more ↓
- Water leak
Slow leak
Apr 23, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Apr 10, 2026 · Apt 4A
Close - Water leak
Slow leak
Apr 10, 2026 · Apt 4A
Close - Paint/plaster
Wall
Apr 10, 2026 · Apt 4A
Close - Water leak
Slow leak
Mar 16, 2026 · Apt 3A
Close - Water leak
Heavy flow
Jan 22, 2026 · Apt 4A
Close - Paint/plaster
Ceiling
Jan 22, 2026 · Apt 4A
Close - Unsanitary condition
Mold
Jan 22, 2026 · Apt 4A
Close - Electric
Power outage
Jan 15, 2026 · Apt 4D
Close - Unsanitary condition
Mold
Dec 22, 2025 · Apt 3A
Close - Heat/hot water
Apartment only
Dec 21, 2025 · Apt 8C
Close - Door/window
Door
Dec 19, 2025 · Apt 4D
Close - Heat/hot water
Apartment only
Dec 10, 2025 · Apt 3A
Close - Unsanitary condition
Pests
Nov 20, 2025 · Apt 4B
Close - Water leak
Slow leak
Oct 30, 2025 · Apt 3A
Close - Water leak
Damp spot
Oct 30, 2025 · Apt 3A
Close - Unsanitary condition
Sewage
Oct 30, 2025 · Apt 3A
Close - Elevator
Maintenance
Jun 13, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 13, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 8, 2025 · Apt 3D
Close - Plumbing
Water supply
Apr 7, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 13, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Mar 13, 2025 · Apt 3D
Close - Unsanitary condition
Pests
Mar 13, 2025 · Apt 3D
Close - Paint/plaster
Wall
Mar 13, 2025 · Apt 3D
Close - Electric
Lighting
Mar 13, 2025 · Apt 3D
Close - Paint/plaster
Wall
Mar 13, 2025 · Apt 3D
Close - Flooring/stairs
Floor
Mar 13, 2025 · Apt 3D
Close - Heat/hot water
Entire building
Dec 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2024 · Apt BLDG
Close - Unsanitary condition
Sewage
Oct 17, 2024 · Apt 3A
Close - Unsanitary condition
Pests
Sep 20, 2024 · Apt 3D
Close - Flooring/stairs
Floor
Sep 20, 2024 · Apt 3D
Close - Paint/plaster
Wall
Sep 20, 2024 · Apt 3D
Close - Unsanitary condition
Mold
Sep 20, 2024 · Apt 3D
Close - Unsanitary condition
Pests
Sep 20, 2024 · Apt 3D
Close - Unsanitary condition
Garbage/recycling storage
Sep 20, 2024 · Apt 3D
Close - Unsanitary condition
Garbage/recycling storage
Sep 20, 2024 · Apt 3D
Close - Water leak
Damp spot
Apr 30, 2024 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2017
- Floors
- 12
- Residential units
- 54
- Building area
- 47,713 ft²
- Lot area
- 6,735 ft²
- Zoning
- R8
- Community board
- 207
- Council district
- 14
- Block / lot
- 3321 / 38
- Assessed value
- $2,828,700
- Landmark / historic district
- No
HPD registration #228290, last renewed Nov 13, 2025.
Questions about 16 East 204 Street
Who owns 16 East 204 Street?
The owner of record in NYC Department of City Planning PLUTO data is Hp Villa Gardens HDFC, INC..
Does 16 East 204 Street have violations?
Yes. NYC HPD has recorded 26 housing violations at this property.
Is 16 East 204 Street rent stabilized?
NYC Department of Finance tax bills listed 53 rent-stabilized units here in 2024 (about 98% of its 54 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 16 East 204 Street built?
City records list 2017 as the year it was built.
How many apartments are in 16 East 204 Street?
It has 54 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.