2819 Morris Avenue
Bronx, NY 10468BBL 2-03318-0034Map
Owner of record: Morris Realty LLC
2819 Morris Avenue is a walk-up apartment building built in 1925 in Bronx, 10468. It has 69 residential units across 6 floors. The owner of record is Morris Realty LLC. HPD has recorded 690 housing violations here, most recently on September 20, 2026. 22 of the 50 most recent violations are still open. City tax records listed 69 rent-stabilized apartments here in 2024.
- HPD violations
- 690
- DOB violations
- 3
- ECB violations
- 2
- HPD complaints
- 965
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 690
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on balcony at 1st fire escape from north, 2nd story
Sep 20, 2026
Open — Nov certified on time - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on balcony at 1st fire escape from east at south, 4th story
Sep 20, 2026
Open — Nov certified on time - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on baclony at 1st fire escape from east at south, 2nd story
Sep 20, 2026
Open — Nov certified on time - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 20, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
May 31, 2026
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north at west located at apt 4e, 5th story, 1st apartment from west at north
May 19, 2026 · Apt 4E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt 4e, 5th story, 1st apartment from west at north
May 19, 2026 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at riser in the bathroom located at apt 4e, 5th story, 1st apartment from west at north
May 19, 2026 · Apt 4E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4e, 5th story, 1st apartment from west at north
May 19, 2026 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective reglaze porcelain finish at bathtub in the bathroom located at apt 4e, 5th story, 1st apartment from west at north
May 19, 2026 · Apt 4E
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls, ceiling and wood trims in the entire apartment located at apt 3l, 4th story, 1st apartment from north at east , section at north
Jan 19, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor around the radiator at south wall in the 1st room from east at north located at apt 3l, 4th story, 1st apartment from north at east , section at north
Jan 19, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor around the radiator at north wall in the 1st room from east at south located at apt 3l, 4th story, 1st apartment from north at east , section at north
Jan 19, 2026 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3l, 4th story, 1st apartment from north at east , section at north
Jan 19, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at west wall in the 5th room from east located at apt 3l, 4th story, 1st apartment from north at east , section at north
Jan 19, 2026 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 00, wg to repair = 0 in the entire apartment located at apt 3l, 4th story, 1st apartment from north at east , section at north
Jan 19, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall and west wall in the bathroom located at apt 3l, 4th story, 1st apartment from north at east , section at north
Jan 19, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Replace the broken or defective or missing washbasin in the bathroom located at apt 3l, 4th story, 1st apartment from north at east , section at north
Jan 19, 2026 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective wood trim around window in the bathroom located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls at closet in the private hallway located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective window trim at north and east walls in the 1st room from east at north located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective door frame at closet in the 1st room from east at south located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor at closet in the 1st room from east at south located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor under radiator in the 1st room from east at south located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective base board at south wall in the 1st room from east at north located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective window frame trims around window 2 units at east wall in the 1st room from east at south located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood trim around window in the 3rd room from east located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of bx cable hanging at south wall in the 3rd room from east located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - BHazardous
Repair by closing so as to be gas tight all openings in the drain pipe stack at west wall in the bathroom located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east and west wall in the bathroom located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of bx cable hanging at east and south wall in the private hallway located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective door frame at closet in the private hallway located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from east located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of hanging at eas t wall in the 5th room from east located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - BHazardous
Replace with new the missing electrical light fixture at ceiling in the 5th room from east located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - ANon-hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed. at ceiling in the 5th room from east located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective window trim in the 5th room from east located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing electrical cover at wall switch at west wall in the 1st room from east at north located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of hanging at west wal in the 1st room from east at north located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balances at lower sash window in the 1st room from east at north located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective handle at radiator shut off valve in the 1st room from east at north located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective inoperative intercom system from building entrance to north wall in the foyer located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective handle at radiator shut off valve in the 1st room from east at south located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balaces at lower window sash in the kitchen located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - ANon-hazardous
Replace with new the missing door knobs at closets in the private hallway located at apt 3l, 4th story, 1st apartment from north at east , 1st section from west at north
Nov 14, 2025 · Apt 3L
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of lockable slide bolt at door in the entrance located at apt 3g, 3rd story, 1st apartment from south at west , section ''west''
Oct 2, 2025 · Apt 3G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4f, 4th story, 1st apartment from east at south , section ''west''
Aug 26, 2025 · Apt 4F
Open — Notice of issuance sent to tenant
DOB building violations · 3
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 27, 1992
Vpw*-violation unserved ecb-work without permit-dismissed
ECB violations · 2
- Non-hazardous
Work withot a permit{curb cut approx 5' - 0' side south west of entrance 2819 morris ave. remedy: obtain apermit if feasible or restore premises to prior legal conditio.
Jul 11, 1994
Resolve - Non-hazardous
Work without a permit <noted>curb cut -5'0"wide southwest of entrance 2819 morris ave.remedy:obtain a permit if feasible or restore premisesto prior legal condition.
Mar 27, 1992 · Penalty $1,000
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Aug 8, 2026 · Apt BLDG
Close - Water leak
Heavy flow
May 27, 2026 · Apt 4E
Close - Unsanitary condition
Mold
May 27, 2026 · Apt 4E
Close - Plumbing
Bathtub/shower
May 13, 2026 · Apt 4E
Close - Paint/plaster
Wall
May 13, 2026 · Apt 4E
Close - Unsanitary condition
Mold
May 13, 2026 · Apt 4E
Close - Plumbing
Bathtub/shower
May 13, 2026 · Apt 4E
Close - Electric
Outlet/switch
Feb 25, 2026 · Apt 3L
Close - Unsanitary condition
Pests
Feb 25, 2026 · Apt 3L
Close - Plumbing
Basin/sink
Feb 25, 2026 · Apt 3L
Close
Show 40 more ↓
- Door/window
Door
Feb 25, 2026 · Apt 3L
Close - Unsanitary condition
Pests
Feb 25, 2026 · Apt 3L
Close - Water leak
Heavy flow
Feb 10, 2026 · Apt M3
Close - Plumbing
Water supply
Jan 26, 2026 · Apt M3
Close - Electric
Outlet/switch
Jan 13, 2026 · Apt 3L
Close - Paint/plaster
Wall
Jan 13, 2026 · Apt 3L
Close - Unsanitary condition
Pests
Jan 13, 2026 · Apt 3L
Close - Plumbing
Basin/sink
Jan 13, 2026 · Apt 3L
Close - Door/window
Door
Jan 13, 2026 · Apt 3L
Close - Paint/plaster
Wall
Jan 13, 2026 · Apt 3L
Close - General
Cabinet
Jan 13, 2026 · Apt 3L
Close - Flooring/stairs
Floor
Jan 13, 2026 · Apt 3L
Close - Door/window
Door frame
Jan 13, 2026 · Apt 3L
Close - Unsanitary condition
Mold
Jan 9, 2026 · Apt 3L
Close - Flooring/stairs
Floor
Jan 9, 2026 · Apt 3L
Close - Paint/plaster
Wall
Jan 9, 2026 · Apt 3L
Close - Paint/plaster
Ceiling
Nov 7, 2025 · Apt 3L
Close - Unsanitary condition
Mold
Nov 7, 2025 · Apt 3L
Close - Door/window
Door
Nov 7, 2025 · Apt 3L
Close - Paint/plaster
Wall
Nov 7, 2025 · Apt 3L
Close - Door/window
Door frame
Nov 7, 2025 · Apt 3L
Close - Electric
Wiring
Nov 7, 2025 · Apt 3L
Close - Electric
No lighting
Nov 7, 2025 · Apt 3L
Close - Door/window
Window frame
Nov 7, 2025 · Apt 3L
Close - Flooring/stairs
Floor
Nov 7, 2025 · Apt 3L
Close - Paint/plaster
Wall
Aug 25, 2025 · Apt 4F
Close - Flooring/stairs
Floor
Aug 25, 2025 · Apt 4F
Close - Door/window
Door
Aug 25, 2025 · Apt 4F
Close - Door/window
Window frame
Aug 25, 2025 · Apt 4F
Close - Plumbing
Basin/sink
Aug 25, 2025 · Apt 4F
Close - Plumbing
Bathtub/shower
Aug 25, 2025 · Apt 4F
Close - Door/window
Window frame
Aug 25, 2025 · Apt 4F
Close - Plumbing
Bathtub/shower
Aug 25, 2025 · Apt 4F
Close - Water leak
Slow leak
Mar 24, 2025 · Apt 5M
Close - Unsanitary condition
Pests
Feb 28, 2025 · Apt M3
Close - Flooring/stairs
Floor
Feb 28, 2025 · Apt M3
Close - General
Bell/buzzer/intercom
Feb 28, 2025 · Apt M3
Close - Water leak
Damp spot
Feb 28, 2025 · Apt M3
Close - Heat/hot water
Entire building
Feb 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1925
- Floors
- 6
- Residential units
- 69
- Building area
- 68,670 ft²
- Lot area
- 12,500 ft²
- Zoning
- R8
- Community board
- 207
- Council district
- 14
- Block / lot
- 3318 / 34
- Assessed value
- $1,181,250
- Landmark / historic district
- No
HPD registration #201466, last renewed Sep 11, 2025.
Questions about 2819 Morris Avenue
Who owns 2819 Morris Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Morris Realty LLC.
Does 2819 Morris Avenue have violations?
Yes. NYC HPD has recorded 690 housing violations at this property.
Is 2819 Morris Avenue rent stabilized?
NYC Department of Finance tax bills listed 69 rent-stabilized units here in 2024 (about 100% of its 69 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2819 Morris Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 2819 Morris Avenue?
It has 69 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.