roofy

2875 Sedgwick Avenue

Bronx, NY 10468BBL 2-03253-0255Map

Owner of record: 2875 Sedgwick Owners Corp.

2875 Sedgwick Avenue is an elevator apartment building built in 1927 in Bronx, 10468. It has 85 residential units across 6 floors. The owner of record is 2875 Sedgwick Owners Corp.. HPD has recorded 440 housing violations here, most recently on June 30, 2026. 30 of the 50 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.

HPD violations
440
DOB violations
62
ECB violations
51
HPD complaints
545

What to know

Concern
12 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jun 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
1
About 1% of the building's 85 apartments
Down from 12 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 440

  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations deffective in the entire apartment located at apt b6, 2nd story, 2nd apartment from north at east

    Jun 30, 2026 · Apt B6

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules deffective in the entire apartment located at apt b6, 2nd story, 2nd apartment from north at east

    Jun 30, 2026 · Apt B6

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 3rd room from east at south located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from east at south wall door in the private hallway located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st closet from north at east wall door, 1st closet from north at east wall door frame in the private hallway located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the 1st room from east located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from south at west wall, west wall in the 3rd room from east at south located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from east at south wall in the 1st room from east located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Nov sent out
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department at east wall, north wall, 1st closet from north at east wall ceiling, 1st closet from north at east wall wall in the private hallway located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall, south wall, north wall, east wall, north wall, 1st closet from north at east wall ceiling, 1st closet from north at east wall wall in the bathroom located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of pests. evidence of spiders in the entire apartment located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective ceramic tiled floor in the kitchen located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Nov certified late
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq. ft. at west wall in the kitchen located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from south at west wall, west wall in the 3rd room from east at south located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq. ft. at west wall and 1st window frame from south at west wall in the 3rd room from east at south located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling, north wall, west wall, south wall in the bathroom located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq. ft. at ceiling in the bathroom located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department at north wall in the private hallway located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq. ft. at east wall, walls and ceiling inside the closet at east wall and north wall in the private hallway located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from east at south wall in the 1st room from east located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from east at south wall, 1st radiator from east at south wall in the 1st room from east located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st door from north at east wall in the foyer located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the foyer located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq. ft. at ceiling in the foyer located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Notice of issuance sent to tenant
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Certification postponment denied
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Jun 29, 2026

    Open — Not complied with
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the foyer located at apt a15, 1st story, 3rd apartment from south at west

    Jun 29, 2026 · Apt A15

    Open — Defect letter issued
  • C

    Properly repair or replace the broken or defective lower sash window counter balance at public hall, 2nd story

    Jun 23, 2026

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the entire apartment located at apt e8, 5th story, 2nd apartment from north at east

    Jun 23, 2026 · Apt E8

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective lower sash counter balance at public hall, 7th story

    Jun 23, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2d, 2nd story, 5th apartment from south at west

    Apr 29, 2026 · Apt 2D

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt e8, 5th story, 2nd apartment from north at east

    Feb 25, 2026 · Apt E8

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt e8, 5th story, 2nd apartment from north at east

    Feb 25, 2026 · Apt E8

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall, 1st window frame from south at west wall in the 3rd room from east at north located at apt d3, 4th story, 4th apartment from south at west , section at north

    Feb 24, 2026 · Apt D3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall, 2nd window frame from south at west wall in the 3rd room from east at south located at apt d3, 4th story, 4th apartment from south at west , section at north

    Feb 24, 2026 · Apt D3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the bathroom located at apt d3, 4th story, 4th apartment from south at west , section at north

    Feb 24, 2026 · Apt D3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st door frame from north at east wall in the foyer located at apt d3, 4th story, 4th apartment from south at west , section at north

    Feb 24, 2026 · Apt D3

    Open — Lead docs submitted, acceptable
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the foyer located at apt d3, 4th story, 4th apartment from south at west , section at north

    Feb 24, 2026 · Apt D3

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from west at north wall door frame in the foyer located at apt d3, 4th story, 4th apartment from south at west , section at north

    Feb 24, 2026 · Apt D3

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation at 1st door from north at east wall in the foyer located at apt d3, 4th story, 4th apartment from south at west , section at north

    Feb 24, 2026 · Apt D3

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective glass pane at lower window sash, the 2nd window from south at west wall in the 3rd room from east at south located at apt d3, 4th story, 4th apartment from south at west , section at north

    Feb 24, 2026 · Apt D3

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the kitchen located at apt d3, 4th story, 4th apartment from south at west , section at north

    Feb 24, 2026 · Apt D3

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall in the bathroom located at apt d3, 4th story, 4th apartment from south at west , section at north

    Feb 24, 2026 · Apt D3

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at north located at apt f14, 6th story, 2nd apartment from south at west , section at south

    Feb 19, 2026 · Apt F14

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective concrete cracks at sloping egress catwalk landing at (building rear) west yard, building south section

    Feb 19, 2026

    Open — Not complied with

DOB building violations · 62

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Immediate emergency anythingoptional

    Install a single line of temporary shoring with cross-bracing in both directions along the full length of both concrete balcony, covering apprx 60 linear feet

    Feb 6, 2025

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain bldg in a safe condition.the exp3facade is in disrepair,exhibitng crcks&dislodged bricks.the exp3balconies have visible cracking & have been deemed strctrlly unstable.ownr to immed rtain nyspe to eval the ent bldg,determine the strctrl stbility & prepare/file rpair dwgs.bldg to be rpaird

    Feb 5, 2025

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner.at time of ins pection,observed at exp1 & 4 east & north elev,damaged parapet wall,sp alled bricks,deteriorated mortar joints,cracks throughout facades.at e xp4 north elev damaged lintels observed.remedy:repair/replace

    Oct 17, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner.observed at al l exposures damaged parapet walls.at different levels of each exp obse rved damaged mortar joints.at exp1 observed step cracks in multiple lo cations.damaged window sills in multiple locations.at exp2 observed st ep cracks damaged window sills,missing brick.remedy:repair or replace

    Jun 21, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 22, 2023

    Dob violation - active
  • Construction other optional

    Partial vacate order note:observed on 08/18/2023 at expo#3 and 4 west north elevation spalling/cracked brick masonry at several locations including ex#3 west.elevation.both courtyard area.no safety measurs in place.qewi file unsafe-908103.remedy:vacat at exp#3 west & exp#4 no north ele.including exp#3w.ele.both courtyd.unless emergency situation

    Aug 18, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
Show 40 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner.during inspection observed damaged/open mortar joints,step-cracked brickwork spalling stone spalled bricks,and vertical north elevation.remedy: repair/replace damaged facade

    Jun 15, 2023

    Dob violation - active
  • Construction other optional

    Emergency work order due to defective facade building exterior masonry facade wall at exp#1,2,3&4.observed vertical cracks with open mortar joint and spalling brick at the several locations and also observed.at fire escapes loose step/tread/and loose railing.remedy:immediately repair unsafe conditions/provide safety measures@exp#2,3&4

    May 12, 2023

    Dob violation - active
  • Construction other optional

    Failure to maintain building facade and appurtenances qewi stated on fisp (unsafe) report submitted on 4/21/23,hazardous and unsafe conditi ons observed at fire-escapes (loose step/tread,loose anchorage,loose railings,loose connection)and obstructions on fire-escape landings remedy:immed.repair unsafe cond.&fire escape operable&safe for use

    May 9, 2023

    Dob violation - active
  • Hazardous condition (facade) facade required

    Cycle 9c unsafe report filed

    May 4, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner.during o inspection observed on expsure#1 numerous vertical cracks missing mortar joints and chipped or cracked bricks.exposure 4 has numerous spalled bricks and missing mortar joints.remedy:repair and/replace

    Mar 24, 2023

    Dob violation - active
  • Construction other optional

    Ftm exterior bldg facade and appurtenances. multiple deteriorated/open mortar joints, verticle cracks, spalled bricks, and step cracking observed on exp1 east elev and exp4 north elev. remedy: maintain exterior bldg facade. repair damaged facade as per 1rcny 103-04

    Nov 16, 2022

    Dob violation - active
  • Construction other optional

    Ftm bldg exterior walls facade appurtenances. view of facade multiple defected conditions, crack/step cracks, spalling bricks and eroded mortar joints at various locations. remedy: maintain building exterior walls facade and repair defect as per 1rcny 103-04

    Jun 2, 2022

    Dob violation - active
  • Construction other optional

    Failure to comply with commissioners order #031820cll0801jc as of 08/06/21 owner has not complied with immediate cure order remedy: immed comply with code and commissioner's order

    Aug 6, 2021

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 12, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 2, 2020

    Dob violation - active
  • Construction other optional

    Failure to maintain exterior building facade and appurtenance remedy: maintain exterior bldg facade provide dafety measures, repair damage facade as per 1rcny 103-04

    Mar 18, 2020

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 12, 2018

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 19, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 15, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 18, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 26, 2014

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 26, 2013

    Dob violation - resolved
  • Facade facade optional

    Unsafe local law 11/98 report filed

    Mar 21, 2013

    Dob violation - active
  • Facade facade optional

    Unsafe local law 11/98 report filed

    Mar 21, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 18, 2012

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 14, 2011

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 28, 2011

    Dob violation - dismissed

ECB violations · 51

  • Class - 2

    Failure to file acceptable amended cycle 6, 7c, 8c, and 9c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #908103. agg2 history of noncomp

    Apr 20, 2026 · Penalty $6,250

    Active
  • Class - 2

    At the time of inspection i observed parapet clamps installed on the parapet at roof level. upon request, no parapet wall inspection certificate none was available or provided as required by bc 3314.4.3 to veri

    Feb 19, 2026 · Penalty $2,500

    Active
  • Class - 2

    At the time of inspection, i observed a suspended scaffold in use for active facade operations. upon review of the dob bis system, no notification was found for the installation or removal of the suspended scaf

    Feb 19, 2026 · Penalty $2,500

    Active
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. noted no certificate of correction on file for ecb violation #39141163r, issued 03/12/2025 b

    Sep 8, 2025 · Penalty $6,250

    Active
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. noted no certificate of correction on file for ecb violation #39108664k, issued 03/13/2024 b

    Sep 8, 2025 · Penalty $6,250

    Active
  • Class - 1

    At time of inspection observed multiple cracks, cellar to 6th-sty level at public hall walls and floor along "a" line of apartments in north section. also multiple cracks at lobby walls, 1st -sty level., repair

    Mar 12, 2025 · Penalty $2,500

    Active
  • Class - 1

    At time of inspection observed facade in state of disrepair. cracks at exp# 1 and 2 at multiple locations. stucco at exp#2 have cracks., maintain exterior building wall

    Mar 13, 2024 · Penalty $2,500

    Active
  • Class - 1

    Failure to comply with commissioner's order.violation#051223llfa01ab dated 5/12/23 states to immediately repair deflective facade.as of today 01/31/24 no repairs have been mode.rem:comply with commissioners ord

    Jan 31, 2024 · Penalty $25,000

    Active
  • Class - 2

    Failure to file acceptable amended cycle 6, 7c, 8c, and 9c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #908103. agg2 history of noncomp

    Jan 16, 2024 · Penalty $10,000

    Active
  • Class - 1

    Unlawful acts failure to comply with commissioners order. note: respondent failure to comply with previous issued violation#35671025l dated 5/12/23 and dob violation #051223llfa01ab dated 051223 which requires

    Jul 19, 2023 · Penalty $2,500

    Active
Show 40 more ↓
  • Class - 1

    Failure to provide required safety measures such as(shed,netting,fence,etc) where required to secure/protect the public. note:as of time of inspection 5-12-23 observed no any safety measures at exp#2,3&4) to pr

    May 12, 2023 · Penalty $10,000

    Active
  • Class - 2

    I observed 6 story building, with sidewalk shed(sws) at exp1. sws horizontal brace above main entrance path and emergency exit path, not providing 8feet minimum height clearance as required by bc3307.6.4.7. haz

    Mar 18, 2023 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#808103.agg1:prior nov 37018302l under 2

    Oct 19, 2022 · Penalty $3,125

    Resolve
  • Class - 2

    Expired permit(sws)at time of inspection i observed sidewalk shed in place of exp1 od existing residential building with expired permit dated 3/3/2022.upon review of dept records,no record of updates or renewed

    Apr 1, 2022 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain exterior building facade and appurtenances.as noted building has defective masonry throughout building facade exp1.loosebricks on parapet wall,spalled bricks,step cracks,damaged mortar joint

    Oct 13, 2021 · Penalty $1,250

    Active
  • Class - 2

    Failure to file acceptable amended cycle 6 & 7c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#708103. agg2 history of noncompliance on

    Oct 8, 2021 · Penalty $6,250

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specification note:at the time of inspection observed a hd sws at exposure one with active permit,pedestrian walking & using sidewalk infront of the building.also,observ

    Jul 1, 2021 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to maintain atoi i observed settlement cracks on interior wall(plastered walls)&fl tile.settlement crack observed on multiple fls inhallways.most noticeable by stairwell&around center of hallway.no stru

    Jun 29, 2021 · Penalty $625

    Active
  • Class - 2

    Pedestrian protection does not meet code specifications in response toabove mentioned complaint#2311192 for wind causing the sidewalk shed in place in front of occupied 6-story building to shake observed that t

    Dec 26, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to file acceptable amended cycle 6 and 7c report indicating correction of unsafe condition described in initial facades report required by 28-302.5 for control #708103 file acceptbel report

    Jun 3, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Bc3301.9.2.1=sidewlak shed parapet panel conent at time of inspection i observed sidewlak shed erected at expo #1 front of building missing information panel in case of emergency contact number and name would b

    May 6, 2020 · Penalty $625

    Resolve
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a

    Apr 11, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#808103. remedy: submit acceptable require

    Feb 13, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    2x10,8v1; 2x10 phone inoperative,8v1-car saddle to hall,saddle at lobby notv level in the down direction.

    Jun 24, 2019

    Resolve
  • Class - 2

    100.m.07,02.x.10,12.x.10,70.o.02,*100-m=provide crosby on anti twist device * 02-x repair car phone *12-x=repair ceiling light * 70-o+clean pit

    May 6, 2019

    Resolve
  • Class - 2

    Failure to file acceptable amended report indicating correction of unsafe conditions described in initial local law 11/98 report. agg1: prior nov 36023812l under 28-302.5. rem: file acceptable amended report.

    Nov 7, 2016 · Penalty $2,000

    Resolve
  • Class - 2

    Failure to file an acceptable amended cycle 7 report to this department indicating correction of unsafe conditions described in initial correction of unsafe conditions described in initial local law fisp report

    Dec 11, 2015 · Penalty $800

    Resolve
  • Class - 2

    Fail to maintain exterior bldg. note:ease elevation exp#1 obs step cracks,displacement in parapet,cracks,deteriorating & bulging in its facade;blocks of wood,bricks,cans under a/c units.west elev exp#3 obs step

    Sep 24, 2012 · Penalty $500

    Active
  • Class - 2

    39q03,41t07,61t07,67m07.39q03:install cover for electrical box top of car.61t07:provide company sticker for main line disconnect switch box.67m07:provide communication in car (telephone).

    Jul 16, 2012

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:

    Apr 15, 2011 · Penalty $4,000

    Resolve
  • Class - 2

    Failure to maintain exterior bldg east elevation exp#1 observed step cracks and vertical cracks displacment in parapet facade blocks of wood masonry bricks under a/c units flower pots stoned on fire escape land

    Mar 15, 2011 · Penalty $500

    Active
  • Class - 1

    Failure to maintain building in code-complaint manner. defect noted: at rear of bldg,exposure 3,basement level reinforce concrete terrace isdisrepair,steel rebars exposed,concrete(coding),several openings on

    Nov 4, 2010 · Penalty $1,000

    Active
  • Class - 1

    Failure to maintain bldg in code compliant manner.exit passageway fromfire escape @ rear of bldg collapsed exposure#3.also noted:vertical cracks from basement to roof @ rear courtyard#3.rem:maintain bldg:obtain

    Oct 8, 2010 · Penalty $1,000

    Active
  • Class - 1

    Failure to provide unobstructed exit passageway.exit passageway @ rearof bldg collapsed remaining section of passageway in damage of collap sing.rem:remove obstruction;provide safe exit passageway

    Oct 8, 2010 · Penalty $1,200

    Active
  • Class - 2

    Fail to file an acceptable sixth round technical report in compliance with code provisions. periodic inspection of exterior walls & suppurtenances as required by article 28-302 and the dept of bldgs rules & reg

    Jul 12, 2010 · Penalty $800

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Nov 27, 2009

    Resolve
  • Class - 2

    Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules & regulations

    Jan 30, 2009

    Resolve
  • Class - 2

    39i10,39q03,42d06,43q03,60q03,77m11,77q03,98u05,100u05. 39i10 repair lighting top of car 39q03 install guard for light on top of car 42d06 secure relay on controller 77m11 replace toe guard underside of platfor

    Aug 20, 2008 · Penalty $500

    Resolve
  • Non-hazardous

    6b-to replace safty value with right capacity on boiler. rockwill 7000safty value's 6000.

    Sep 17, 2001 · Penalty $2,500

    Active
  • Non-hazardous

    05j,09h,39h,50y,22l,22o,30o,17a. need special tool, not wire galss.

    Nov 2, 1998

    Resolve
  • Hazardous

    Failure to file an amended round four report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file an

    May 21, 1998

    Resolve
  • Hazardous

    Failure to file an amended round four report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll 10/80 report. remedy: file a

    Mar 9, 1998

    Resolve
  • Non-hazardous

    50h75u28b74m 50 h replace bearing 74 m replace cover on box under car.

    Mar 7, 1998 · Penalty $180

    Resolve
  • Hazardous

    Failure to file an amended round 4 report acceptable to this dept pursuant to rule rcny 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report.

    Feb 3, 1998 · Penalty $400

    Active
  • Hazardous

    Failure to file an amended round four report acceptable to this department pursuant to rule r.c.n.y 32-03b (5), indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file an

    Nov 18, 1997

    Resolve
  • Non-hazardous

    18b, 25m, 52b. 18-properly secure interlock "keepers" on hoistway doorwhere necessary 25 replace missing operator cover. 52 remove noise from machine brake.

    Mar 24, 1995 · Penalty $1,000

    Resolve
  • Non-hazardous

    46k,50#,08v, 50-remove noise

    May 9, 1994 · Penalty $100

    Resolve
  • Non-hazardous

    73x restore elev to service so a proper insp can be made

    Feb 3, 1994

    Resolve
  • Non-hazardous

    73#,74m,74o,02l,03#,(73) perform 5yr test, properly tag device (gov). & file elv 3 form. (74) provide capacity plate in elev. (74) clean car top. (03) file bn to obtain permit for new cab.

    Sep 9, 1991 · Penalty $375

    Resolve
  • Non-hazardous

    40r,35p,74#,74# 40-perform 5yr. gov. test. 74-provide capacity plate in cab. 74-clean car top.

    Feb 20, 1991 · Penalty $1,000

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Aug 19, 2026 · Apt 15A

    Open
  • General

    Cabinet

    Aug 19, 2026 · Apt 15A

    Open
  • Appliance

    Refrigerator

    Aug 19, 2026 · Apt 15A

    Open
  • Unsanitary condition

    Pests

    Aug 19, 2026 · Apt A15

    Open
  • Unsanitary condition

    Pests

    Aug 18, 2026 · Apt A15

    Open
  • Unsanitary condition

    Mold

    Jun 22, 2026 · Apt A15

    Close
  • Heat/hot water

    Entire building

    Mar 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 26, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Feb 22, 2026 · Apt E8

    Close
  • Heat/hot water

    Entire building

    Feb 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 5, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 5, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 11, 2025 · Apt BLDG

    Close
  • Safety

    Smoke detector

    Nov 26, 2025 · Apt D4

    Close
  • Safety

    Window guard broken/missing

    Nov 26, 2025 · Apt D4

    Close
  • Door/window

    Door

    Oct 16, 2025 · Apt D8

    Close
  • Unsanitary condition

    Mold

    Oct 16, 2025 · Apt D8

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 23, 2025 · Apt BLDG

    Close
  • Plumbing

    Toilet

    Jun 27, 2025 · Apt C11

    Close
  • Plumbing

    Toilet

    Jun 27, 2025 · Apt C11

    Close
  • Plumbing

    Bathtub/shower

    Jun 27, 2025 · Apt C11

    Close
  • Paint/plaster

    Ceiling

    Jun 27, 2025 · Apt C11

    Close
  • Electric

    No lighting

    May 31, 2025 · Apt BLDG

    Close
  • Water leak

    Damp spot

    May 29, 2025 · Apt C11

    Close
  • Plumbing

    Toilet

    May 29, 2025 · Apt C11

    Close
  • Door/window

    Door

    May 29, 2025 · Apt C11

    Close
  • Paint/plaster

    Wall

    May 29, 2025 · Apt C11

    Close
  • Paint/plaster

    Ceiling

    May 29, 2025 · Apt C11

    Close
  • Water leak

    Slow leak

    May 29, 2025 · Apt C11

    Close
  • Paint/plaster

    Ceiling

    May 29, 2025 · Apt C11

    Close
  • Door/window

    Door frame

    May 29, 2025 · Apt C11

    Close
  • Plumbing

    Bathtub/shower

    May 29, 2025 · Apt C11

    Close
  • Paint/plaster

    Wall

    May 29, 2025 · Apt C11

    Close
  • Plumbing

    Bathtub/shower

    May 29, 2025 · Apt C11

    Close
  • Paint/plaster

    Ceiling

    May 29, 2025 · Apt C11

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 11, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 11, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jan 31, 2025 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D4)
Year built
1927
Floors
6
Residential units
85
Building area
107,220 ft²
Lot area
18,500 ft²
Zoning
R6
Community board
208
Council district
14
Block / lot
3253 / 255
Assessed value
$2,402,550
Landmark / historic district
No

HPD registration #200889, last renewed Aug 26, 2025.

Questions about 2875 Sedgwick Avenue

Who owns 2875 Sedgwick Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 2875 Sedgwick Owners Corp..

Does 2875 Sedgwick Avenue have violations?

Yes. NYC HPD has recorded 440 housing violations at this property.

Is 2875 Sedgwick Avenue rent stabilized?

NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 1% of its 85 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2875 Sedgwick Avenue built?

City records list 1927 as the year it was built.

How many apartments are in 2875 Sedgwick Avenue?

It has 85 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.