2700 Kingsbridge Terrace
Bronx, NY 10463BBL 2-03253-0020Map
Owner of record: Vp Kingsbridge LLC
2700 Kingsbridge Terrace is an elevator apartment building built in 1930 in Bronx, 10463. It has 44 residential units across 5 floors. The owner of record is Vp Kingsbridge LLC. HPD has recorded 124 housing violations here, most recently on April 30, 2026. 10 of the 50 most recent violations are still open. City tax records listed 44 rent-stabilized apartments here in 2024.
- HPD violations
- 124
- DOB violations
- 27
- ECB violations
- 10
- HPD complaints
- 322
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 124
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at building entrance door , 1st story
Jan 29, 2025
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of a key operated lock at compactor closet door at public hall, 6th story
Oct 16, 2024
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of approved type wire mesh at ceiling under skylight installed improperly at 1st public hall bulkhead from north
Oct 16, 2024
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak above ceiling in the foyer located at apt 6g, 6th story, 1st apartment from south at west
Oct 16, 2024 · Apt 6G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 6g, 6th story, 1st apartment from south at west
Oct 16, 2024 · Apt 6G
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6g, 6th story, 1st apartment from south at west
Oct 16, 2024 · Apt 6G
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6g, 6th story, 1st apartment from south at west
Oct 16, 2024 · Apt 6G
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6g, 6th story, 1st apartment from south at west
Oct 16, 2024 · Apt 6G
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Oct 16, 2024
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6g, 6th story, 1st apartment from south at west
Oct 16, 2024 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective porcelin enamel glaze by method of reglazing at bathtub in the bathroom located at apt 4c, 4th story, 1st apartment from west at north
Jul 18, 2024 · Apt 4C
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in at wash basin and bathtub. in the bathroom located at apt 2d, 2nd story, 2nd apartment from west at north
May 25, 2024 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at east and north walls in the 3rd room from east located at apt 2d, 2nd story, 2nd apartment from west at north
May 25, 2024 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlets at west and north walls in the 3rd room from east located at apt 2d, 2nd story, 2nd apartment from west at north
May 25, 2024 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical light switch at east wall. in the 3rd room from east located at apt 2d, 2nd story, 2nd apartment from west at north
May 25, 2024 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective bathroom door in the bathroom located at apt 2d, 2nd story, 2nd apartment from west at north
May 25, 2024 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective wood door in the 3rd room from east located at apt 2d, 2nd story, 2nd apartment from west at north
May 25, 2024 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door leading to south yard at public hall, 1st story
Mar 13, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door (missing) leading to basment public hall . at public hall, 1st story
Jan 10, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges , 1st story
Dec 30, 2023
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 9 sq.ft. at west wall, approx 6 sq.ft. at east wall, approx 5 sq.ft. at north wall around 1st and 2nd window casing in the 3rd room from east located at apt 2d, 2nd story, 2nd apartment from west at north
Dec 14, 2023 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective outlet at north and west wall in the 3rd room from east located at apt 2d, 2nd story, 2nd apartment from west at north
Dec 14, 2023 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective door in the 3rd room from east located at apt 2d, 2nd story, 2nd apartment from west at north
Dec 14, 2023 · Apt 2D
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2d, 2nd story, 2nd apartment from west at north
Dec 14, 2023 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2d, 2nd story, 2nd apartment from west at north
Dec 14, 2023 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective outlet at north wall in the kitchen located at apt 2d, 2nd story, 2nd apartment from west at north
Dec 14, 2023 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2d, 2nd story, 2nd apartment from west at north
Dec 14, 2023 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchen located at apt 2d, 2nd story, 2nd apartment from west at north
Dec 14, 2023 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from east located at apt 2d, 2nd story, 2nd apartment from west at north
Dec 14, 2023 · Apt 2D
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 2d, 2nd story, 2nd apartment from west at north
Dec 14, 2023 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door leading to rear yard at public hall, 1st story
Dec 14, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance door at public hall, 1st story
Jan 23, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective entrance door in the entrance located at apt 6g, 6th story, 1st apartment from east at south
Jan 9, 2023 · Apt 6G
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 3rd room from east located at apt 6g, 6th story, 1st apartment from east at south
Jan 9, 2023 · Apt 6G
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 5b, 5th story, 1st apartment from south at west
Nov 17, 2022 · Apt 5B
Closed — Violation closed - ANon-hazardous
Refit the sink base cabinet doors in the kitchen located at apt 4c, 4th story, 1st apartment from west at north
Jul 29, 2022 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at west located at apt 4c, 4th story, 1st apartment from west at north
Jul 29, 2022 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 4c, 4th story, 1st apartment from west at north
Jul 29, 2022 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective lock and assembly at door in the entrance located at apt 4c, 4th story, 1st apartment from west at north
Jul 29, 2022 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 3rd apartment from east at south
Nov 8, 2021 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 8, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 5th story, 3rd apartment from west at north
Jan 8, 2021 · Apt 5E
Closed — Violation dismissed - BHazardous
Provide security in the even of a power outage by mean of a mechanical heavy duty lock and latchset at building entrance door , 1st story
Nov 18, 2020
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the foyer located at apt 6a, 6th story, 3rd apartment from east at south
Oct 20, 2020 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, east wall in the foyer located at apt 6a, 6th story, 3rd apartment from east at south
Oct 20, 2020 · Apt 6A
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling in the foyer located at apt 6a, 6th story, 3rd apartment from east at south
Oct 20, 2020 · Apt 6A
Closed — Violation dismissed
DOB building violations · 27
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Oct 1, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 25, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 25, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 24, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2009
Dob violation - resolved
Show 17 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 10, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 6, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 25, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2003
Dob violation - resolved - Elevator elevatoroptional
1
Jun 28, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 7, 1992
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 25, 1991
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
(51)replace missing toe guard
Nov 26, 1988
Dob violation - resolved
ECB violations · 10
- Class - 1
Cu59a10,68b01,59bb05. 29a-altered brake monitoring arm switch repair and contact nycdob for restore to service reinspection, 68b-adjust login; 59bb-perform and file test.
May 22, 2019 · Penalty $1,250
Resolve - Class - 2
11a,50a,50b,50c-as per class 2 (b254)28.301.1 failue to maintain 11a:surface blowdown valve and piping not installed.50a:dogleg missing at rear boiler access door.50b:bottom blowdown drain tied in directly in t
Sep 24, 2018 · Penalty $655
Resolve - Class - 2
67m7,76q3. 67m- provide communication in car telephone. 76q- install cover for plank switch top of car.
Apr 10, 2013
Resolve - Class - 2
Failure to provide elevator landing sign that shall read: in case of fire use stairs unless otherwise instructed at the elevators bank on flr 2 to 6. remedy: install sign as per local law 16 1984.
Aug 5, 2009
Resolve - Hazardous
Use of illegal hardware.gate at fire passageway is padlocked eliminating 2nd means of egress from the bldg.remedy:remove illegal hardware.
Jul 6, 2007
Resolve - Non-hazardous
46r13-52r11-74m07-08j01-57o02. 52-install proper pins or fasteners on brake pins, 74-povide fire exsting.
Mar 20, 2002 · Penalty $180
Resolve - Non-hazardous
18q,10i,53d,32q,31d,37g,74u,73o,30o,57o,35o, 74-city id tags.
Apr 7, 1998 · Penalty $350
Resolve - Non-hazardous
02i,11q,14m36i,57o.
Dec 4, 1996
Resolve - Non-hazardous
35p,10i,11q,30o,14m,28h,(35)provide access to motor room.74-a-replace hand rails in cab.74-b-cover push plates on hoistway doors.
Jul 1, 1992
Resolve - Non-hazardous
40r,57o,74o,14m,22d,35p,40-perform 5yr gov test 74-clean top of car. 35-access to motor room
Jan 31, 1991 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Entire building
Mar 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 10, 2025 · Apt 6G
Close - Plumbing
Radiator
Jan 8, 2025 · Apt 2G
Close - Flooring/stairs
Floor
Jan 6, 2025 · Apt 2G
Close - Unsanitary condition
Sewage
Jan 6, 2025 · Apt 2G
Close - Water leak
Slow leak
Jan 6, 2025 · Apt 2G
Close - Unsanitary condition
Pests
Jan 6, 2025 · Apt 2G
Close - Water leak
Damp spot
Dec 8, 2024 · Apt 2G
Close
Show 40 more ↓
- Paint/plaster
Wall
Dec 8, 2024 · Apt 2G
Close - Appliance
Electric/gas range
Dec 8, 2024 · Apt 2G
Close - Heat/hot water
Entire building
Oct 15, 2024 · Apt 6G
Close - Electric
No lighting
May 20, 2024 · Apt 2D
Close - Door/window
Door
May 20, 2024 · Apt 2D
Close - Plumbing
Bathtub/shower
May 20, 2024 · Apt 2D
Close - Plumbing
Basin/sink
May 20, 2024 · Apt 2D
Close - Electric
Outlet/switch
May 20, 2024 · Apt 2D
Close - Heat/hot water
Entire building
Apr 25, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 12, 2024 · Apt 4A
Close - Heat/hot water
Entire building
Feb 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 16, 2024 · Apt 6F
Close - Heat/hot water
Entire building
Jan 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2024 · Apt 4A
Close - Heat/hot water
Entire building
Jan 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2023 · Apt 4A
Close - Heat/hot water
Apartment only
Dec 20, 2023 · Apt 4A
Close - Heat/hot water
Entire building
Dec 18, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2023 · Apt BLDG
Close - Door/window
Door
Dec 9, 2023 · Apt 2D
Close - Paint/plaster
Wall
Dec 9, 2023 · Apt 2D
Close - Electric
Outlet/switch
Dec 9, 2023 · Apt 2D
Close - Unsanitary condition
Mold
Dec 9, 2023 · Apt 2D
Close - Plumbing
Bathtub/shower
Dec 9, 2023 · Apt 2D
Close - Plumbing
Basin/sink
Dec 9, 2023 · Apt 2D
Close - Flooring/stairs
Floor
Dec 9, 2023 · Apt 2D
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Mar 30, 2026 | $2,750,000 | Rentals - elevator apartments | 44 |
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1930
- Floors
- 5
- Residential units
- 44
- Building area
- 37,000 ft²
- Lot area
- 9,375 ft²
- Zoning
- R6
- Community board
- 208
- Council district
- 14
- Block / lot
- 3253 / 20
- Assessed value
- $684,900
- Landmark / historic district
- No
HPD registration #200997, last renewed Apr 7, 2026.
Questions about 2700 Kingsbridge Terrace
Who owns 2700 Kingsbridge Terrace?
The owner of record in NYC Department of City Planning PLUTO data is Vp Kingsbridge LLC.
Does 2700 Kingsbridge Terrace have violations?
Yes. NYC HPD has recorded 124 housing violations at this property.
Is 2700 Kingsbridge Terrace rent stabilized?
NYC Department of Finance tax bills listed 44 rent-stabilized units here in 2024 (about 100% of its 44 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2700 Kingsbridge Terrace built?
City records list 1930 as the year it was built.
How many apartments are in 2700 Kingsbridge Terrace?
It has 44 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.