2314 Grand Concourse
Bronx, NY 10458BBL 2-03159-0007Map
Owner of record: 2320 Grand Concourse Assoc LLC
2314 Grand Concourse is an elevator apartment building built in 1931 in Bronx, 10458. It has 65 residential units across 6 floors. The owner of record is 2320 Grand Concourse Assoc LLC. HPD has recorded 136 housing violations here, most recently on August 16, 2025. 26 of the 50 most recent violations are still open. City tax records listed 65 rent-stabilized apartments here in 2024.
- HPD violations
- 136
- DOB violations
- 23
- ECB violations
- 10
- HPD complaints
- 174
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 136
- BHazardous
Remove all encumbrances consisting of electric bike at 3rd story public hall at public hall
Aug 16, 2025
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the at north yard yard
Aug 16, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall at ceiling in the 2nd room from north located at apt 3f, 3rd story, 2nd apartment from east at south , section ''west''
Aug 16, 2025 · Apt 3F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at fire passage way, 1st story
Aug 16, 2025
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 16, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at floor yard
Aug 16, 2025
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration padlock installed at compact closet door at all stories at public hall
Aug 16, 2025
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3f, 3rd story, 2nd apartment from east at south , section ''west''
Aug 16, 2025 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroom located at apt 4c, 4th story, 2nd apartment from west at north
Apr 16, 2025 · Apt 4C
Open — Nov sent out - ANon-hazardous
M/d law abate the nuisance consisting of peeling painted at bathtub in the bathroom located at apt 4c, 4th story, 2nd apartment from west at north
Apr 16, 2025 · Apt 4C
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Properly repair with similar material the broken or defective wood wall cabinet doors in the kitchen located at apt 4c, 4th story, 2nd apartment from west at north
Apr 16, 2025 · Apt 4C
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective vinyl floor cover in the 1st room from north at east located at apt 4c, 4th story, 2nd apartment from west at north
Apr 16, 2025 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing permanently installed device at public door at public hall, 5th story
Dec 17, 2024
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 6g, 6th story, 3rd apartment from south at west
Sep 12, 2024 · Apt 6G
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 6g, 6th story, 3rd apartment from south at west
Sep 12, 2024 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the foyer located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from north at east wall in the foyer located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the foyer located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroom located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from north at east wall in the kitchen located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the kitchen located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from north at east wall, 2nd window frame from south at west wall in the 4th room from east at south located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall in the bathroom located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from west at north wall in the bathroom located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door frame in the private hallway located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, 1st closet from north at east wall door, 2nd closet from north at east wall door, 1st closet from north at east wall door frame in the 1st room from east located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak above ceiling in the 1st room from east located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak above ceiling in the foyer located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from north at east wall in the foyer located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, west wall in the 4th room from east at south located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Open — Defect letter issued - BHazardous
Trace and repair the source and abate the visible mold condition... approx 12 sq.ft at ceiling in the bathroom located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, south wall in the kitchen located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at ceiling in the private hallway located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the 4th room from east at south located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, south wall, west wall in the 1st room from east located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 2nd closet from north at east wall door frame, 1st door from south at west wall, 1st door frame from south at west wall in the 1st room from east located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door in the private hallway located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 3rd room from east at south located at apt 6g, 6th story, 3rd apartment from south at west
Jun 24, 2024 · Apt 6G
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the private hallway located at apt 3f, 4th story, 2nd apartment from north at east , section at north
Jan 5, 2024 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, east wall, west wall in the 2nd room from east at north located at apt 3f, 4th story, 2nd apartment from north at east , section at north
Jan 5, 2024 · Apt 3F
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 3f, 4th story, 2nd apartment from north at east , section at north
Jan 5, 2024 · Apt 3F
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall in the 1st room from east at south located at apt 3f, 4th story, 2nd apartment from north at east , section at north
Jan 5, 2024 · Apt 3F
Open — Certification postponment denied
DOB building violations · 23
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 12, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 10, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 14, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 26, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 3, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 27, 2008
Dob violation - resolved
Show 13 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Nov 7, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 7, 1992
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed - Elevator elevatorrequired
73-restore elev. to service .....74-clean car top
May 16, 1990
Dob violation - resolved - Elevator elevatorrequired
(51) restore elev to service for purpose of inspection by this department (52) clean car top
Jan 17, 1989
Dob violation - resolved
ECB violations · 10
- Class - 2
Failure to maintain exterior building facade and appurtenances. note: at time of inspection observed at exp #2(north elev.) at 1st floor spalling facade bricks. remedy: maintain exterior building facade and app
Apr 25, 2026
Resolve - Class - 2
Observed on the ground floor in gabby's discount pet shop. no smoke detectors and carbon dioxide detectors in place. also no sprinkler system in place which is contrary to bc 903.2.2.2; bc 903.2.2.2, comply wit
Oct 20, 2023 · Penalty $6,250
Active - Class - 3
Observed damages to ceiling as a result water leakage from the floor above at the interior of the first floor commercial space "partying events and planning company" including missing ceiling finishes (apprx. 2
Mar 10, 2023
Resolve - Class - 2
Work w/o a permit. work noted: 1)constructed wood frame mezzanine w/staircase at rear if store. 2)constructed wood frame drop ceiling at front of store. 3)constructed wood frame partitions at rear of store.
Nov 1, 2017 · Penalty $400
Resolve - Class - 1
Occupancy contrary to that allowed by the c/o or dob records. dob records, hpd mdr #207569 indicates 65 class 'a' apts. no 3 units. apt 5c is a legal 3 bedroom apt, now apt 5c is arranged & occupied is 4 sros,
Apr 11, 2012 · Penalty $2,400
Resolve - Class - 2
Work w/o a permit. work noted at apt 5c created full height partitionssubdividing one bedroom into 2 bedrooms. constructed bedroom has no natural light or ventilation. remedy: vacate front bedroom. no light and
Apr 11, 2012
Resolve - Non-hazardous
84##/ 33i10/ 38o02/ 66o02/ 84##=repair cab communcations. 33i10=repairloose plaster at top of hoistway.
Nov 1, 2004
Resolve - Non-hazardous
85u05,03bb10,66o02,33o02,38o2,58o02,17m10,65m07. 85-date of tag 6/21/99. 03-restore communication to outside source 17-provide 2nd gibs for lobby h/ door
Jul 15, 2004
Resolve - Non-hazardous
08v01,14h07,15l11,18h12,28h12,35o02,73o02,50h12,75b02
May 13, 2000 · Penalty $180
Resolve - Non-hazardous
20i10i35p30p57o05f14m21x #05-too slow.
May 13, 1998
Resolve
Complaints
- Plumbing
Water supply
Jul 2, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 2, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 21, 2025 · Apt 6G
Close - Water leak
Heavy flow
Dec 21, 2025 · Apt 6G
Close - Heat/hot water
Apartment only
Oct 24, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Oct 24, 2025 · Apt BLDG
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Sep 27, 2025 · Apt 3G
Close - Paint/plaster
Wall
Aug 13, 2025 · Apt 3F
Close - Unsanitary condition
Pests
Aug 13, 2025 · Apt 3F
Close - Plumbing
Basin/sink
Aug 13, 2025 · Apt 3F
Close - Water leak
Slow leak
Aug 13, 2025 · Apt 3F
Close - Unsanitary condition
Garbage/recycling storage
Aug 13, 2025 · Apt 3F
Close - Plumbing
Water supply
Jul 8, 2025 · Apt 3F
Close - Plumbing
Water supply
Jul 8, 2025 · Apt 3F
Close - Plumbing
Water supply
Jun 25, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jun 25, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jun 24, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jun 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2024 · Apt BLDG
Close - Electric
Outlet/switch
Jun 20, 2024 · Apt 6G
Close - Electric
Outlet/switch
Jun 20, 2024 · Apt 6G
Close - Electric
Outlet/switch
Jun 20, 2024 · Apt 6G
Close - Paint/plaster
Wall
Jun 20, 2024 · Apt 6G
Close - Appliance
Refrigerator
Jun 20, 2024 · Apt 6G
Close - Unsanitary condition
Mold
Jun 20, 2024 · Apt 6G
Close - Paint/plaster
Ceiling
Jun 20, 2024 · Apt 6G
Close - Water leak
Slow leak
Jun 20, 2024 · Apt 6G
Close - Paint/plaster
Wall
Jun 20, 2024 · Apt 6G
Close - Water leak
Slow leak
Jun 20, 2024 · Apt 6G
Close - Heat/hot water
Apartment only
Feb 15, 2024 · Apt 1D
Close - Heat/hot water
Apartment only
Jan 15, 2024 · Apt 2H
Close - Heat/hot water
Apartment only
Dec 25, 2023 · Apt 3F
Close - Heat/hot water
Entire building
Dec 25, 2023 · Apt 3F
Close - Heat/hot water
Apartment only
Dec 24, 2023 · Apt 3F
Close - Heat/hot water
Entire building
Dec 15, 2023 · Apt 3F
Close - Heat/hot water
Entire building
Dec 15, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 21, 2023 · Apt 3F
Close - Heat/hot water
Apartment only
Oct 31, 2023 · Apt 3F
Close - Electric
No lighting
May 17, 2023 · Apt 6G
Close - Appliance
Refrigerator
May 17, 2023 · Apt 6G
Close - General
Cabinet
May 17, 2023 · Apt 6G
Close - Plumbing
Radiator
May 17, 2023 · Apt 6G
Close - Unsanitary condition
Mold
May 17, 2023 · Apt 6G
Close - Plumbing
Bathtub/shower
May 17, 2023 · Apt 6G
Close - Paint/plaster
Wall
May 17, 2023 · Apt 6G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1931
- Floors
- 6
- Residential units
- 65
- Building area
- 75,415 ft²
- Lot area
- 14,755 ft²
- Zoning
- R8
- Community board
- 205
- Council district
- 15
- Block / lot
- 3159 / 7
- Assessed value
- $1,399,500
- Landmark / historic district
- No
HPD registration #207569, last renewed Aug 27, 2025.
Questions about 2314 Grand Concourse
Who owns 2314 Grand Concourse?
The owner of record in NYC Department of City Planning PLUTO data is 2320 Grand Concourse Assoc LLC.
Does 2314 Grand Concourse have violations?
Yes. NYC HPD has recorded 136 housing violations at this property.
Is 2314 Grand Concourse rent stabilized?
NYC Department of Finance tax bills listed 65 rent-stabilized units here in 2024 (about 100% of its 65 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2314 Grand Concourse built?
City records list 1931 as the year it was built.
How many apartments are in 2314 Grand Concourse?
It has 65 residential units and 73 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.