roofy

2246 Grand Concourse

Bronx, NY 10457BBL 2-03158-0011Map

Owner of record: 2246 Holding Corp

2246 Grand Concourse is a walk-up apartment building built in 1915 in Bronx, 10457. It has 21 residential units across 5 floors. The owner of record is 2246 Holding Corp. HPD has recorded 798 housing violations here, most recently on September 24, 2026. 47 of the 50 most recent violations are still open. City tax records listed 15 rent-stabilized apartments here in 2024.

HPD violations
798
DOB violations
0
ECB violations
3
HPD complaints
764

What to know

Concern
10 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 24, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
15
About 71% of the building's 21 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 798

  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the foyer located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the foyer located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, east wall in the private hallway located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). east wall in the 2nd room from east at south located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from east at south located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Certification postponment granted
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south, the 3rd room from east at north located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall, 1st window frame from west at north wall in the kitchen located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Certification postponment granted
  • A

    Paint with light colored paint to the satisfaction of this department the in the 2nd room from east at south located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective vinyl tiles at floor in the 2nd room from east at south located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the 3rd room from east at north located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall ceiling, east wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, west wall and south wall in the 3rd room from east at south located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling north wall, ceiling in the 2nd room from east at south located at apt 1a, 1st story, 1st apartment from west at north

    Sep 24, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective marble tread at 1st from bottom at vestibule

    Sep 17, 2026

    Open — Nov certified on time
  • A

    Cleanse to the satisfaction of this department the stairs and landings at public hall stairs

    Sep 17, 2026

    Open — Nov certified on time
  • B

    Remove all encumbrances consisting of sofa at public hall, 1st story

    Sep 17, 2026

    Open — Nov certified on time
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox defective at public hall, 1st story

    Sep 17, 2026

    Open — Nov certified on time
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings defective

    Sep 17, 2026

    Open — Nov certified on time
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Sep 17, 2026

    Open — Nov certified on time
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 17, 2026

    Open — Nov certified on time
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the 2nd room from north located at apt 1a, 1st story, 1st apartment from west at north

    Sep 17, 2026 · Apt 1A

    Open — Civ14 mailed
  • B

    Properly secure the loose electrical light fixture at ceiling in the 2nd room from north located at apt 1a, 1st story, 1st apartment from west at north

    Sep 17, 2026 · Apt 1A

    Open — Civ14 mailed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 1a, 1st story, 1st apartment from west at north

    Sep 17, 2026 · Apt 1A

    Open — Civ14 mailed
  • B

    Remove all encumbrances consisting of household items

    Jul 29, 2026 · Apt BLDG

    Open — Civ14 mailed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east

    Jul 29, 2026 · Apt 3A

    Open — Notice of issuance sent to tenant
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3d, 3rd story, 1st apartment from north at east

    Jul 29, 2026 · Apt 3D

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead

    Jul 29, 2026 · Apt BLDG

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at intermediate landing

    Jul 29, 2026 · Apt BLDG

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at intermediate lauding

    Jul 29, 2026 · Apt BLDG

    Open — Civ14 mailed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4d, 4th story, 1st apartment from north at east

    Jul 29, 2026 · Apt 4D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective enamel porcelain place at bathtub in the bathroom located at apt 3d, 3rd story, 1st apartment from north at east

    Jul 29, 2026 · Apt 3D

    Open — Civ14 mailed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4d, 4th story, 1st apartment from north at east

    Jul 29, 2026 · Apt 4D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east at south located at apt 3d, 3rd story, 1st apartment from north at east

    Jul 29, 2026 · Apt 3D

    Open — Civ14 mailed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4d, 4th story, 1st apartment from north at east

    Jul 29, 2026 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3d, 3rd story, 1st apartment from north at east

    Jul 29, 2026 · Apt 3D

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3d, 3rd story, 1st apartment from north at east

    Jul 29, 2026 · Apt 3D

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective spring balance at lower sash window in the bathroom located at apt 3d, 3rd story, 1st apartment from north at east

    Jul 29, 2026 · Apt 3D

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3d, 3rd story, 1st apartment from north at east

    Jul 29, 2026 · Apt 3D

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east

    Jul 29, 2026 · Apt 3A

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at bulkhead

    Jul 29, 2026 · Apt BLDG

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4d, 4th story, 1st apartment from north at east

    Jul 29, 2026 · Apt 4D

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4d, 4th story, 1st apartment from north at east

    Jul 29, 2026 · Apt 4D

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west and south wall in the bathroom located at apt 4d, 4th story, 1st apartment from north at east

    Jul 29, 2026 · Apt 4D

    Open — Civ14 mailed
  • B

    Properly repair the source and abate the evidence of a water leak at west and south wall in the bathroom located at apt 4d, 4th story, 1st apartment from north at east

    Jul 29, 2026 · Apt 4D

    Open — Civ14 mailed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the entire rear yard

    Jul 15, 2026

    Open — Nov certified on time
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at yard

    Jul 15, 2026

    Open — Nov certified on time
  • B

    Properly repair the broken or defective paving at rear yard

    Jul 15, 2026

    Open — Nov certified on time

DOB building violations · 0

No DOB violations on record

ECB violations · 3

  • Class - 2

    Found exposed wiring, "co" detector missing from base, body drain missing on safety relief valve, remove all debris from rear of boiler.

    Dec 4, 2023

    Resolve
  • Class - 3

    As per the city record (hpd# 81790) the legal occupancy for the building is: five stories and 22 class a units. observed 21 class a units (four per a floor and one at the basement) with two commercial spaces at

    Mar 2, 2022 · Penalty $500

    Active
  • Non-hazardous

    Ailure to maintain exterior bldg wall defect: cracked and defectived brick work above the 5th story windows cousing brick parapet wall to lean. also defective steel lintels on the 5th story windows in front of

    Jan 4, 1999

    Resolve

Complaints

  • Plumbing

    Basin/sink

    Jul 28, 2026 · Apt 4D

    Close
  • Water leak

    Heavy flow

    Jul 24, 2026 · Apt 4D

    Close
  • Water leak

    Heavy flow

    Jul 20, 2026 · Apt 4D

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 18, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 30, 2026 · Apt BR

    Close
  • Paint/plaster

    Ceiling

    Jun 16, 2026 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Jun 16, 2026 · Apt 2B

    Close
  • Water leak

    Heavy flow

    Jun 16, 2026 · Apt 2B

    Close
  • Flooring/stairs

    Floor

    Jun 16, 2026 · Apt 2B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 22, 2026 · Apt 4D

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Mar 29, 2026 · Apt 5C

    Close
  • Paint/plaster

    Ceiling

    Mar 29, 2026 · Apt 5C

    Close
  • Electric

    Lighting

    Mar 14, 2026 · Apt 2B

    Close
  • Water leak

    Heavy flow

    Mar 14, 2026 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Mar 14, 2026 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Mar 13, 2026 · Apt 5C

    Close
  • Plumbing

    Bathtub/shower

    Mar 13, 2026 · Apt 1D

    Close
  • Paint/plaster

    Ceiling

    Mar 13, 2026 · Apt 1D

    Close
  • Door/window

    Door

    Jan 19, 2026 · Apt 5D

    Close
  • General

    Cabinet

    Jan 19, 2026 · Apt 5D

    Close
  • Plumbing

    Bathtub/shower

    Jan 19, 2026 · Apt 5D

    Close
  • Plumbing

    Radiator

    Jan 19, 2026 · Apt 5D

    Close
  • Unsanitary condition

    Pests

    Jan 19, 2026 · Apt 5D

    Close
  • Appliance

    Refrigerator

    Jan 19, 2026 · Apt 5D

    Close
  • Plumbing

    Basin/sink

    Jan 19, 2026 · Apt 5D

    Close
  • Appliance

    Electric/gas range

    Jan 19, 2026 · Apt 5D

    Close
  • Electric

    Lighting

    Jan 19, 2026 · Apt 5D

    Close
  • Plumbing

    Bathtub/shower

    Jan 2, 2026 · Apt 2B

    Close
  • Plumbing

    Bathtub/shower

    Jan 2, 2026 · Apt 2B

    Close
  • Plumbing

    Toilet

    Dec 26, 2025 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Dec 19, 2025 · Apt 4D

    Close
  • Heat/hot water

    Entire building

    Oct 28, 2025 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Oct 13, 2025 · Apt 2B

    Close
  • General

    Cabinet

    Oct 13, 2025 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Sep 25, 2025 · Apt 2B

    Close
  • Flooring/stairs

    Floor

    Aug 4, 2025 · Apt 2D

    Close
  • Paint/plaster

    Ceiling

    Aug 4, 2025 · Apt 2D

    Close
  • Door/window

    Window frame

    Aug 4, 2025 · Apt 2D

    Close
  • Unsanitary condition

    Mold

    Aug 4, 2025 · Apt 2D

    Close
  • Unsanitary condition

    Pests

    Aug 4, 2025 · Apt 2D

    Close
  • Unsanitary condition

    Pests

    Aug 4, 2025 · Apt 2D

    Close
  • Unsanitary condition

    Pests

    Aug 4, 2025 · Apt 2D

    Close
  • Plumbing

    Basin/sink

    Jul 1, 2025 · Apt 5D

    Close
  • General

    Cabinet

    Jul 1, 2025 · Apt 5D

    Close
  • Paint/plaster

    Ceiling

    Jul 1, 2025 · Apt 5D

    Close
  • Door/window

    Door

    Jul 1, 2025 · Apt 5D

    Close
  • Plumbing

    Bathtub/shower

    Jul 1, 2025 · Apt 5D

    Close
  • Paint/plaster

    Ceiling

    Jun 30, 2025 · Apt 1A

    Close
  • Door/window

    Window pane

    May 28, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    May 28, 2025 · Apt 2B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1915
Floors
5
Residential units
21
Building area
17,970 ft²
Lot area
5,000 ft²
Zoning
R8
Community board
205
Council district
15
Block / lot
3158 / 11
Assessed value
$773,550
Landmark / historic district
No

HPD registration #201308, last renewed Jul 6, 2026.

Questions about 2246 Grand Concourse

Who owns 2246 Grand Concourse?

The owner of record in NYC Department of City Planning PLUTO data is 2246 Holding Corp.

Does 2246 Grand Concourse have violations?

Yes. NYC HPD has recorded 798 housing violations at this property.

Is 2246 Grand Concourse rent stabilized?

NYC Department of Finance tax bills listed 15 rent-stabilized units here in 2024 (about 71% of its 21 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2246 Grand Concourse built?

City records list 1915 as the year it was built.

How many apartments are in 2246 Grand Concourse?

It has 21 residential units and 23 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.