2030 Ryer Avenue
Bronx, NY 10457BBL 2-03149-0015Map
Owner of record: 2030 Ryer LLC
2030 Ryer Avenue is a walk-up apartment building built in 1927 in Bronx, 10457. It has 10 residential units across 4 floors. The owner of record is 2030 Ryer LLC. HPD has recorded 267 housing violations here, most recently on July 21, 2026. 12 of the 50 most recent violations are still open. City tax records listed 10 rent-stabilized apartments here in 2024.
- HPD violations
- 267
- DOB violations
- 18
- ECB violations
- 5
- HPD complaints
- 245
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 267
- BHazardous
File certification of satisfactory installation of smoke detecting device in accordance with h.p.d. rules and regulations. in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Jul 21, 2026 · Apt 1B
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Jul 21, 2026 · Apt 1B
Open — Civ14 mailed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at front yard yard
Jul 14, 2026
Open — Nov certified on time - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at back yard yard
Jul 14, 2026
Open — Nov certified on time - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the household garbage at rear yard at basement
Jul 14, 2026
Open — Nov certified on time - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard
May 27, 2026
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
May 27, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective , cracked ceramic floor tiles in the kitchen located at apt 1b, 1st story, 1st apartment from north at east
May 23, 2026 · Apt 1B
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
May 23, 2026 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
May 23, 2026 · Apt 1B
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Provide approved glass at building entrance door , 1st story
May 13, 2026
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of plexiglass installed at building entrance door , 1st story
May 13, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10sq.ft at ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set and assemblies at building entrance door ( from street to vestibule door) at public hall, 1st story
Apr 16, 2026
Closed — Violation closed - BHazardous
Properly secure the loose wash basin to west wall in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective bell buzzer intercom system from building entrance door up to panel at south wall in the foyer located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set and assemblies at building entrance door ( from street to vestibule door) at public hall, 1st story
Apr 16, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 1st story
Apr 16, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Apr 16, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing the bathtub in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator at west wall in the 2nd room from east located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective countertop at sink at east wall in the kitchen located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective rotted wood inside base cabinet at east wall in the kitchen located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by methhod of reglazing the bathtub in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash at window at south wall in the kitchen located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash at window at south wall in the kitchen located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Apr 16, 2026 · Apt 1B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... mold less than 10sq feet at widow stool in the 3rd room from north located at apt 1b, 1st story, 1st apartment from north at east
Apr 12, 2026 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Apr 12, 2026 · Apt 1B
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... mold less than 10sq feet at ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Apr 12, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Apr 12, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and assembly to door in the entrance located at apt 1b, 1st story, 1st apartment from north at east
Apr 12, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective connection at the sink in the kitchen located at apt 1b, 1st story, 1st apartment from north at east
Apr 12, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 3rd room from north located at apt 1b, 1st story, 1st apartment from north at east
Apr 12, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 2nd room from north located at apt 1b, 1st story, 1st apartment from north at east
Apr 12, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from north located at apt 1b, 1st story, 1st apartment from north at east
Apr 12, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective connection at the sink in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Apr 12, 2026 · Apt 1B
Closed — Violation closed - ANon-hazardous
Repair leaky water closet flush pipe connection ... in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Apr 12, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective at lower window sash in the 1st room from north located at apt 1b, 1st story, 1st apartment from north at east
Apr 12, 2026 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 2nd story
Aug 18, 2025
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective at ceiling and south wall at intermediate landing at public hall, 2nd story
Aug 18, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls at meter room
Aug 10, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of discarded refrigerator with doors intact at meter room
Aug 10, 2025
Open — Nov sent out
DOB building violations · 18
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
Show 8 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 5
- Class - 1
Failure to maintain building in code-compliant manner. at time of inspection observed at interior hallways floors 1-4 & bulkhead ceilings & walls vertical cracks, water penetration & spalling. exterior cracks a
Apr 9, 2026 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code-compliant manner. note: at time of inspection observed at exp #3(east elev.) cracked/spalling retainingwall stone/concrete at various locations. remedy: repair and replace.
Jan 17, 2026 · Penalty $2,500
Resolve - Class - 2
Found dirty glass gauge, exposed wiring, and poor lighting in boiler room.
Sep 18, 2023 · Penalty $312
Resolve - Class - 2
Failure to maintain building in a code compliant manner. noted;at rooflevel asphalt roofing on parapet wall approx a 3'h x 2'w section has failed&is pulling away from wall. failure is above bedroom of apt 4a wh
Oct 18, 2020
Resolve - Class - 2
36. as per class 254-36 boiler not register as per dob records. correct all violating conditions & submit a c of c.
Aug 2, 2017 · Penalty $500
Resolve
Complaints
- Unsanitary condition
Pests
Jul 18, 2026 · Apt BB
Close - Unsanitary condition
Garbage/recycling storage
Jul 17, 2026 · Apt YARD
Close - Unsanitary condition
Garbage/recycling storage
Jun 26, 2026 · Apt YARD
Close - Unsanitary condition
Garbage/recycling storage
Jun 25, 2026 · Apt BASEME
Close - Unsanitary condition
Garbage/recycling storage
Jun 25, 2026 · Apt BB
Close - Unsanitary condition
Garbage/recycling storage
Apr 17, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 17, 2026 · Apt BLDG
Close - Door/window
Window frame
Apr 8, 2026 · Apt 1B
Close - Plumbing
Bathtub/shower
Apr 8, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Apr 8, 2026 · Apt 1B
Close
Show 40 more ↓
- Plumbing
Basin/sink
Apr 8, 2026 · Apt 1B
Close - Paint/plaster
Wall
Apr 8, 2026 · Apt 1B
Close - Paint/plaster
Wall
Apr 8, 2026 · Apt BUILDI
Close - Outside building
Roof door/hatch
Apr 8, 2026 · Apt 1B
Close - Outside building
Roof door/hatch
Apr 8, 2026 · Apt 1B
Close - Flooring/stairs
Stairs
Apr 8, 2026 · Apt 1B
Close - Safety
Fire escape
Apr 8, 2026 · Apt 1B
Close - Safety
Fire escape
Apr 8, 2026 · Apt 1B
Close - Water leak
Damp spot
Apr 8, 2026 · Apt 1B
Close - Water leak
Slow leak
Apr 8, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Apr 8, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Apr 8, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Apr 8, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Apr 8, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Apr 8, 2026 · Apt 1B
Close - Safety
Fire escape
Apr 8, 2026 · Apt 1B
Close - Plumbing
Water supply
Apr 8, 2026 · Apt 1B
Close - Plumbing
Water supply
Apr 8, 2026 · Apt 1B
Close - Plumbing
Toilet
Apr 8, 2026 · Apt 1B
Close - Plumbing
Toilet
Apr 8, 2026 · Apt 1B
Close - Door/window
Door
Apr 8, 2026 · Apt 1B
Close - Door/window
Door
Apr 8, 2026 · Apt 1B
Close - Plumbing
Bathtub/shower
Apr 8, 2026 · Apt 1B
Close - Door/window
Window frame
Apr 8, 2026 · Apt 1B
Close - Electric
Outlet/switch
Apr 8, 2026 · Apt 1B
Close - Electric
No lighting
Apr 8, 2026 · Apt 1B
Close - Flooring/stairs
Floor
Apr 8, 2026 · Apt 1B
Close - General
Bell/buzzer/intercom
Apr 8, 2026 · Apt 1B
Close - General
Cabinet
Apr 8, 2026 · Apt 1B
Close - General
Cabinet
Apr 8, 2026 · Apt 1B
Close - Paint/plaster
Cabinet
Apr 8, 2026 · Apt 1B
Close - Paint/plaster
Cabinet
Apr 8, 2026 · Apt 1B
Close - Paint/plaster
Ceiling
Apr 8, 2026 · Apt 1B
Close - Plumbing
Basin/sink
Apr 8, 2026 · Apt 1B
Close - Paint/plaster
Radiator
Apr 8, 2026 · Apt 1B
Close - Paint/plaster
Wall
Apr 8, 2026 · Apt 1B
Close - Paint/plaster
Wall
Apr 8, 2026 · Apt 1B
Close - Paint/plaster
Wall
Apr 8, 2026 · Apt 1B
Close - Plumbing
Basin/sink
Apr 8, 2026 · Apt 1B
Close - Paint/plaster
Ceiling
Apr 8, 2026 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 4
- Residential units
- 10
- Building area
- 6,300 ft²
- Lot area
- 2,375 ft²
- Zoning
- R7-1
- Community board
- 205
- Council district
- 15
- Block / lot
- 3149 / 15
- Assessed value
- $503,100
- Landmark / historic district
- No
HPD registration #200426, last renewed Aug 6, 2025.
Questions about 2030 Ryer Avenue
Who owns 2030 Ryer Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2030 Ryer LLC.
Does 2030 Ryer Avenue have violations?
Yes. NYC HPD has recorded 267 housing violations at this property.
Is 2030 Ryer Avenue rent stabilized?
NYC Department of Finance tax bills listed 10 rent-stabilized units here in 2024 (about 100% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2030 Ryer Avenue built?
City records list 1927 as the year it was built.
How many apartments are in 2030 Ryer Avenue?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.