770 East 182 Street
Bronx, NY 10460BBL 2-03110-0061Map
Owner of record: East 182nd Street LLC
770 East 182 Street is an elevator apartment building built in 2019 in Bronx, 10460. It has 18 residential units across 7 floors. The owner of record is East 182nd Street LLC. HPD has recorded 65 housing violations here, most recently on October 5, 2026. 15 of the 50 most recent violations are still open. City tax records listed 18 rent-stabilized apartments here in 2024.
- HPD violations
- 65
- DOB violations
- 0
- ECB violations
- 26
- HPD complaints
- 73
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 65
- CImmediately hazardous
Properly repair or replace the broken or defective lock set and assemblies at building entrance door , 1st story
Oct 5, 2026
Open — Nov certified on time - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 7b, 7th story, 3rd apartment from south at west
Jul 1, 2026 · Apt 7B
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective spring balance at upper window sash 2nd window from south at west wall in the 1st room from north located at apt 7b, 7th story, 3rd apartment from south at west
Jul 1, 2026 · Apt 7B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north located at apt 7b, 7th story, 3rd apartment from south at west
Jul 1, 2026 · Apt 7B
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft in the bathroom located at apt 7b, 7th story, 3rd apartment from south at west
Jul 1, 2026 · Apt 7B
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch srt and it's assemblies at mechanical room door ''mch room'' at public hall, 2nd story
Dec 30, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of wooden planks at intermediate landing at public hall stairs, 2nd story
Dec 30, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at ''stair case b'' door , 3rd story
Dec 30, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story, section ''east''
Dec 30, 2025
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Dec 30, 2025 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door at compactor closet, 5th story
Dec 30, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set and it's assemblies at ''stair case b'' door , 3rd story
Dec 30, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at mechanical room door ''mch room'' at public hall, 2nd story
Dec 30, 2025
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the landing and treads at public hall stairs, 4th story
Aug 7, 2025
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the landing and treads at public hall stairs, 3rd story
Aug 7, 2025
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the landing and treads at public hall stairs, 2nd story
Aug 7, 2025
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign present information missing at public hall, 1st story
Aug 7, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south
Aug 7, 2025 · Apt 4C
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south
Aug 7, 2025 · Apt 4C
Open — Defect letter issued - ANon-hazardous
Cleanse to the satisfaction of this department the landing and treads at public hall stairs, 1st story
Aug 7, 2025
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling, north, and west walls in the 4th room from east located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective slopping wood sub floor ( covered with vinyl floor tiles) in the kitchen located at apt 1b, 1st story, 1st apartment from east at south
Apr 25, 2025 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at window casing in the 1st room from east located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at window casing, and south wall in the 1st room from east located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from east located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at window casing in the 2nd room from east located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
Apr 25, 2025 · Apt 1B
Open — Defect letter issued - BHazardous
Repair the roof so that it will not leak at ceiling in the 4th room from east located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north, and west walls in the 4th room from east located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd bathroom from east located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective buzzer and return voice intercom system from building entrance up to panel at west wall in the entrance located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
Apr 25, 2025 · Apt 1B
Open — Defect letter issued - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
Apr 25, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
Apr 25, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at apt 1b, 1st story, 1st apartment from east at south
Apr 25, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 feet at window casing in the 3rd room from east located at apt 7b, 7th story, 1st apartment from west at north original violation 17852614 issued 25-apr-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Apr 25, 2025 · Apt 7B
Open — First no access to re- inspect violation - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 4th room from east located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 feet at window casing in the 3rd room from east located at apt 7b, 7th story, 1st apartment from west at north
Apr 25, 2025 · Apt 7B
Closed — Violation closed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at gaps between bottom of door and sill approx 10 inches in the entrance located at apt 1b, 1st story, 1st apartment from east at south
Jan 23, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector that is missing in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
Jan 23, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is missing in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
Jan 23, 2025 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
Jan 23, 2025 · Apt 1B
Open — Defect letter issued
DOB building violations · 0
No DOB violations on record
ECB violations · 26
- Class - 2
Provide motor room sign on motor room door
Jun 7, 2024 · Penalty $1,562
Resolve - Class - 1
Housekeeping at time of inspection of new buidling under construction i observed pile of debris and materials in backyard not placed in code complaint bin/container as rquired by code maintain housekeeping as r
Jan 16, 2020 · Penalty $1,250
Resolve - Class - 2
Storage of sidewlakshed at time of inspection of new building under construction i observed s.w.s. at exp 1 in place with materials stored on top upon review of s.w.s. plans no designated storage space indicate
Jan 16, 2020 · Penalty $1,250
Resolve - Class - 1
Maintain/provide documents at time of inspection of new building under construction i observed pipe scaffold and sidewlak shed in place at exp 1 upon request for s.w.s. installation letter (bc 3307.6.5.7) pipe
Jan 16, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to maintain records of pre-shift meeting for each worker at time fo inspection observed an actiev construction site with inteiror work in progress during inspection noted there was no pre-shift meeting
Nov 4, 2019 · Penalty $625
Resolve - Class - 2
3307.7=jobsite fence not constructed or maintained persunt to subsection at time fo inspection observed an atciev construction site with inteiror work in progress during inspection noted that the jobsite fence
Nov 4, 2019
Resolve - Class - 2
Housekeeping. @ the time of inspection of a 7 story building under construction at 6th floor level. some workers doing cleaning work at pre sence of owner bimla devi on site. i observed construction debris,con
Jan 15, 2019
Resolve - Class - 2
Storage on sidewalk shed. at the time of inspection of a 7story build ing under construction at 6th floor level, some workers doing cleaningwork at presence of owner bimla devi on site. i also observed about 15
Jan 15, 2019 · Penalty $2,400
Resolve - Class - 1
Handrails. at the time of inspection of a 7 story building under con struction at 6th floor level. some workers doing cleaning work at pre sence of owner bimla devi on site. observed missing handrails to stair
Jan 15, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain safety equipment measure:no toeboards. at the timeof inspection of a 7story building under construction at 6th floor level. some workers doing cleaning work at presence of owner bimla dev
Jan 5, 2019 · Penalty $5,000
Resolve
Show 16 more ↓
- Class - 2
Construction superintendent failed to perform duties per code. at timeof inspection on an active 7 story construction site at ground floor level, i observed that the superintendent failed to maintain the jobsit
Aug 28, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to file evidence of compliance w/ workers comp, low and/or disability benefits law. at time of inspection at an active site, after research on the building information system, it was found the nysif(wor
Aug 28, 2018 · Penalty $625
Resolve - Class - 2
Failure to maintain/display on site documents required by bc chapter 33. at an active jobsite w/ workers installing masonry blocks and working on steel, upon request for a site safety plan, no adequate site saf
Aug 28, 2018 · Penalty $625
Resolve - Class - 2
Bc3307.7.7 condition of fence. at time of inspection on an active 7 story jobsite, i observed at exposure 2&4 an inadequate fence. there wasa 6ft gap at exp2 allowing access to site, fence was leaning, and made
Aug 28, 2018 · Penalty $400
Resolve - Class - 2
Bc 3307.6.5.10 daily inspection for sidewalk shed. at time of inspection on an active construction site i observed a sidewalk shed erected at exposure 1. upon request for a daily inspection log for sidewalk she
Aug 28, 2018
Resolve - Class - 2
Bc3305.2.2 field connections-structural steel assembly. at time of inspection on an active jobsite i observed steel beams installed w/ fieldcuts observed(ends of beams were melted from a cutting torch, metal sh
Aug 28, 2018 · Penalty $625
Resolve - Class - 2
Work does not conform to approved construction documents and or approved amendments. note at the time of my inspection of an active job site, i observed sidewalk shed erected at exposure 1. after reviewing side
Aug 28, 2018
Resolve - Class - 1
Bc3301.2 fail to institute and maintain temporary equipment measures and temporary construction(overhead protection) at time of inspection on active site i observed at exposure 2 an active driveway for adjacent
Aug 28, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to provide approved construction documents. at time of inspection asked the site superintendent for site fence plan. he said he did not have one. the fence is a separate application so it requires a app
Aug 2, 2018
Resolve - Class - 2
Failure to provide approved construction documents. at time of inspection asked for sidewalk shed plans. the super of job site said he did not have it on site. as per code all documents shall be on site for ins
Aug 2, 2018
Resolve - Class - 2
Bc 3307.2.1 failure to comply with dot regulations as per rcny 2-05. at time of inspection asked the site superintendent for the dot permitsfor the fence and sidewalk shed on the sidewalk. he said he did not ha
Aug 2, 2018
Resolve - Class - 1
Failure to notify the dept prior to start of earthwork.(rule 52) at time of inspection noted that rule 52 notification prior to commencementof earthwork was not entered in the dob database. the foundation has b
Aug 2, 2018 · Penalty $2,500
Resolve - Class - 2
Bc 3303.7.2 failure to provide fire extinguishers and signs. at time of inspection noted at new construction job site no fire extinguishers on fence and signs as per dob and fdny extinguishers are to be placed
Aug 2, 2018
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio #35248808j issued on 04/23/18 & to file a cert of correction purusuant to 28-201.1 & 1rcny 102-01. failur eto safeguard public & property affected b
Jun 11, 2018 · Penalty $625
Resolve - Class - 1
Failure to safeguard public & property affected by construction operations. during mechanical demolition of 1st sty contrary to plans & w/o any protection for adjacent property also contrary to plans-section of
Apr 23, 2018 · Penalty $10,000
Resolve - Class - 2
Work does not conform to approved plans 1)job #220411472 non-conforming work noted: mechanical demolition of 1st sty. 2)failure to provide protection to adjacenet west properties as shown on page 1 of drawings
Apr 23, 2018 · Penalty $625
Resolve
Complaints
- Electric
Power outage
Oct 7, 2026 · Apt 3C
Close - Safety
Carbon monoxide detector
Jun 24, 2026 · Apt 7B
Close - Safety
Smoke detector
Jun 24, 2026 · Apt 7B
Close - Electric
No lighting
Jun 14, 2026 · Apt 5A
Close - Paint/plaster
Ceiling
Jun 14, 2026 · Apt 5A
Close - Water leak
Damp spot
Jun 14, 2026 · Apt 5A
Close - Water leak
Slow leak
Jun 14, 2026 · Apt 5A
Close - Unsanitary condition
Pests
May 19, 2026 · Apt 7B
Close - Unsanitary condition
Mold
May 19, 2026 · Apt 7B
Close - Flooring/stairs
Floor
May 19, 2026 · Apt 7B
Close
Show 40 more ↓
- Unsanitary condition
Pests
May 19, 2026 · Apt 7B
Close - Water leak
Damp spot
May 19, 2026 · Apt 7B
Close - Unsanitary condition
Mold
Apr 8, 2026 · Apt 5A
Close - Unsanitary condition
Pests
Apr 8, 2026 · Apt 5A
Close - Door/window
Window frame
Apr 8, 2026 · Apt 5A
Close - Electric
Power outage
Mar 25, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 4F
Close - Electric
Power outage
Feb 22, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Feb 12, 2026 · Apt 4J
Close - Electric
Wiring
Jan 24, 2026 · Apt 2C
Close - Electric
Power outage
Jan 20, 2026 · Apt 2C
Close - Electric
Power outage
Jan 5, 2026 · Apt 2C
Close - Electric
Power outage
Jan 5, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Electric
Power outage
Dec 26, 2025 · Apt 2C
Close - Unsanitary condition
Pests
Jul 31, 2025 · Apt 4C
Close - Unsanitary condition
Pests
Jul 31, 2025 · Apt 4C
Close - Unsanitary condition
Pests
Jul 31, 2025 · Apt 4C
Close - Door/window
Door frame
Mar 21, 2025 · Apt 7B
Close - Water leak
Slow leak
Mar 21, 2025 · Apt 7B
Close - Unsanitary condition
Pests
Mar 21, 2025 · Apt 7B
Close - Unsanitary condition
Pests
Mar 21, 2025 · Apt 7B
Close - General
Bell/buzzer/intercom
Mar 21, 2025 · Apt 7B
Close - Heat/hot water
Apartment only
Jan 21, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Jan 21, 2025 · Apt 1B
Close - Plumbing
Bathtub/shower
Jan 21, 2025 · Apt 1B
Close - Plumbing
Toilet
Jan 15, 2025 · Apt 1B
Close - Flooring/stairs
Floor
Jan 15, 2025 · Apt 1B
Close - Plumbing
Bathtub/shower
Jan 15, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Jan 15, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Jan 10, 2025 · Apt 4B
Close - Unsanitary condition
Pests
Jan 10, 2025 · Apt 4B
Close - Unsanitary condition
Garbage/recycling storage
Jan 10, 2025 · Apt 4B
Close - General
Janitor/super
Jan 10, 2025 · Apt 4C
Close - Heat/hot water
Apartment only
Dec 23, 2024 · Apt 3A
Close - Heat/hot water
Apartment only
Dec 14, 2024 · Apt 4F
Close - Water leak
Slow leak
Aug 20, 2024 · Apt 1B
Close - Plumbing
Toilet
Aug 20, 2024 · Apt 1B
Close - Electric
Power outage
Aug 20, 2024 · Apt 1B
Close - Door/window
Window frame
Jul 28, 2024 · Apt 4B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2019
- Floors
- 7
- Residential units
- 18
- Building area
- 16,800 ft²
- Lot area
- 3,913 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3110 / 61
- Assessed value
- $1,337,400
- Landmark / historic district
- No
HPD registration #228581, last renewed Jul 31, 2025.
Questions about 770 East 182 Street
Who owns 770 East 182 Street?
The owner of record in NYC Department of City Planning PLUTO data is East 182nd Street LLC.
Does 770 East 182 Street have violations?
Yes. NYC HPD has recorded 65 housing violations at this property.
Is 770 East 182 Street rent stabilized?
NYC Department of Finance tax bills listed 18 rent-stabilized units here in 2024 (about 100% of its 18 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 770 East 182 Street built?
City records list 2019 as the year it was built.
How many apartments are in 770 East 182 Street?
It has 18 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.