2323 Crotona Avenue
Bronx, NY 10458BBL 2-03103-0049Map
Owner of record: 2323 Crotona LLC
2323 Crotona Avenue is a walk-up apartment building built in 1910 in Bronx, 10458. It has 9 residential units across 4 floors. The owner of record is 2323 Crotona LLC. HPD has recorded 1,018 housing violations here, most recently on August 10, 2026. 25 of the 50 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 1,018
- DOB violations
- 6
- ECB violations
- 2
- HPD complaints
- 739
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,018
- CImmediately hazardous
Properly repair with similar material the broken or defective ceremic floor tiles at vestibule at public hall, 1st story
Aug 10, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Aug 10, 2026
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective [missing south corner of concrete sill] at decorative awning above entrance at building front
Aug 7, 2026
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Aug 6, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Aug 6, 2026 · Apt 2
Open — Civ14 mailed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at .... in the entrance located at apt 2, 1st story, 2nd apartment from south at west
Aug 6, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Aug 6, 2026 · Apt 2
Open — Civ14 mailed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 6, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at 1st story at public hall
Aug 6, 2026
Open — Nov sent out - BHazardous
§ 27-2033.3(e) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon request. data requested for the period of april 2026
Jul 9, 2026
Open — First no access to re- inspect violation
Show 40 more ↓
- BHazardous
§ 27-2033.3(e) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon request. data requested for the period of may 2026
Jul 9, 2026
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective lifting vinyl floor tile in the private hallway located at apt 3, 2nd story, 1st apartment from south at west
Jun 21, 2026 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceilings throughout in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Jun 21, 2026 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective closet door in the 4th room from east located at apt 3, 2nd story, 1st apartment from south at west
Jun 21, 2026 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
Jun 21, 2026 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
Jun 21, 2026 · Apt 3
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 21, 2026
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall and ceiling in the kitchen located at apt 2, 1st story, 2nd apartment from south at west
Jun 1, 2026 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 5th room from east, the bathroom , the 4th room from east located at apt 2, 1st story, 2nd apartment from south at west
Jun 1, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Jun 1, 2026 · Apt 2
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Jun 1, 2026 · Apt 2
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 4th room from east located at apt 2, 1st story, 2nd apartment from south at west
Jun 1, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at west wall and ceiling in the bathroom located at apt 2, 1st story, 2nd apartment from south at west
Jun 1, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
§ 27-2033.3(e) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon request. for march 2026
May 14, 2026
Open — Nov certified late - BHazardous
§ 27-2033.3(e) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon request. for february 2026
Apr 28, 2026
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5, 3rd story, 1st apartment from south at west
Apr 22, 2026 · Apt 5
Closed — Violation closed - BHazardous
Repair the broken or defective connection at waste line at sink in the kitchen located at apt 5, 3rd story, 1st apartment from south at west
Apr 22, 2026 · Apt 5
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story
Apr 22, 2026
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at west wall in the bathroom located at apt 5, 3rd story, 1st apartment from south at west original violation 18808814 issued 22-apr-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Apr 22, 2026 · Apt 5
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at building entrance door , 1st story
Apr 22, 2026
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at west wall in the bathroom located at apt 5, 3rd story, 1st apartment from south at west
Apr 22, 2026 · Apt 5
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective , cracked ceramic floor tiles at vestibule , 1st story
Apr 22, 2026
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5, 3rd story, 1st apartment from south at west
Apr 22, 2026 · Apt 5
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front yard
Mar 19, 2026
Open — False certification - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Mar 19, 2026 · Apt 2
Open — Notice of issuance sent to tenant - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding the maximum allowable temp of 130 degrees in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Mar 19, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at .. yard
Mar 19, 2026
Open — Nov sent out - BHazardous
§ 27-2033.3(e) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon request. for february 2026
Mar 2, 2026
Open — First no access to re- inspect violation - BHazardous
§ 27-2033.3(e) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon request. for january 2026
Mar 2, 2026
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, and west wall in the bathroom located at apt 4, 3rd story, 1st apartment from south at west
Feb 24, 2026 · Apt 4
Open — Nov sent out - CImmediately hazardous
Properly secure the loose 10th, and 11th baluster up from bottom at intermediate landing going up at bulkhead at public hall stairs, 4th story
Feb 24, 2026
Closed — Violation dismissed - BHazardous
Provide slide bolt or hook on roof door that allows re-entry from roof to bulkhead at public hall stairs, 4th story
Feb 24, 2026
Closed — Violation dismissed - BHazardous
Remove the illegal fastening pushbar lock installed on door to roof that doesn't allow re-entry from roof to bulkhead at public hall stairs, 4th story
Feb 24, 2026
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 4, 3rd story, 1st apartment from south at west
Feb 24, 2026 · Apt 4
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the allowed maximum temperature of 130 degrees in the entire apartment located at apt 4, 3rd story, 1st apartment from south at west
Feb 24, 2026 · Apt 4
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak above the ceiling in the bathroom located at apt 4, 3rd story, 1st apartment from south at west
Feb 24, 2026 · Apt 4
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective leak at air valve at east radiator in the 1st room from east located at apt 6, 3rd story, 2nd apartment from south at west
Feb 4, 2026 · Apt 6
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 6, 3rd story, 2nd apartment from south at west
Feb 4, 2026 · Apt 6
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 6, 3rd story, 2nd apartment from south at west
Feb 4, 2026 · Apt 6
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2, 1st story, 2nd apartment from south at west
Feb 2, 2026 · Apt 2
Closed — Violation dismissed
DOB building violations · 6
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 12, 2021
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 2
- Class - 2
Failure to provide key for access to boiler room,as per hmc-27-2033. called phone number of designated person posted in building left message.; 27-misc, comply with code; correct violating condition an submit a
Aug 1, 2024 · Penalty $1,250
Resolve - Class - 1
Cease use- weil mclain egh-95 boiler, due to in poor condition and water leaking from boiler. do not operate boiler til all hazardous conditions are corrected and dob is notified to re inspect in order to lift
Feb 10, 2021 · Penalty $1,250
Active
Complaints
- Unsanitary condition
Pests
Aug 6, 2026 · Apt 8
Close - Unsanitary condition
Mold
Aug 6, 2026 · Apt 8
Close - Unsanitary condition
Pests
Aug 6, 2026 · Apt 6
Open - Unsanitary condition
Pests
Aug 6, 2026 · Apt 2
Close - Unsanitary condition
Pests
Aug 6, 2026 · Apt 2
Close - Unsanitary condition
Pests
Aug 6, 2026 · Apt 1
Open - Unsanitary condition
Garbage/recycling storage
Aug 6, 2026 · Apt BLDG
Close - Water leak
Heavy flow
May 28, 2026 · Apt 2
Close - Plumbing
Basin/sink
Apr 20, 2026 · Apt 5
Close - Unsanitary condition
Mold
Apr 20, 2026 · Apt 5
Close
Show 40 more ↓
- Water leak
Slow leak
Apr 20, 2026 · Apt 5
Close - Plumbing
Basin/sink
Apr 17, 2026 · Apt 5
Close - Unsanitary condition
Mold
Apr 17, 2026 · Apt 5
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt 5
Close - Water leak
Heavy flow
Mar 11, 2026 · Apt 5
Close - Heat/hot water
Entire building
Feb 21, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 5
Close - Water leak
Heavy flow
Jan 29, 2026 · Apt 5
Close - Paint/plaster
Ceiling
Jan 29, 2026 · Apt 5
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt 5
Close - Paint/plaster
Ceiling
Jan 28, 2026 · Apt 5
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 5
Close - Water leak
Heavy flow
Jan 28, 2026 · Apt 5
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 5
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 20, 2026 · Apt 5
Close - Heat/hot water
Apartment only
Jan 12, 2026 · Apt 5
Close - Heat/hot water
Apartment only
Jan 5, 2026 · Apt 6
Close - Door/window
Door frame
Jan 5, 2026 · Apt 6
Close - Flooring/stairs
Floor
Jan 5, 2026 · Apt 6
Close - Water leak
Damp spot
Jan 5, 2026 · Apt 6
Close - Paint/plaster
Wall
Jan 5, 2026 · Apt 6
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2025 · Apt 6
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt 7
Close - Heat/hot water
Entire building
Nov 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 6, 2025 · Apt 6
Close - Heat/hot water
Entire building
Nov 5, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 4, 2025 · Apt 6
Close - Heat/hot water
Entire building
Nov 4, 2025 · Apt 3
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 26, 2025 · Apt 5
Close - Flooring/stairs
Floor
Sep 23, 2025 · Apt 5
Close - Water leak
Heavy flow
Sep 23, 2025 · Apt 5
Close - Flooring/stairs
Floor
Sep 23, 2025 · Apt 5
Close - Unsanitary condition
Mold
Sep 23, 2025 · Apt 5
Close - Plumbing
Bathtub/shower
Sep 23, 2025 · Apt 5
Close - General
Cabinet
Sep 23, 2025 · Apt 5
Close - Electric
Lighting
Sep 23, 2025 · Apt 5
Close - Electric
Lighting
Sep 23, 2025 · Apt 5
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1910
- Floors
- 4
- Residential units
- 9
- Building area
- 10,200 ft²
- Lot area
- 2,993 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3103 / 49
- Assessed value
- $616,950
- Landmark / historic district
- No
HPD registration #204207, last renewed Aug 11, 2025.
Questions about 2323 Crotona Avenue
Who owns 2323 Crotona Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2323 Crotona LLC.
Does 2323 Crotona Avenue have violations?
Yes. NYC HPD has recorded 1,018 housing violations at this property.
Is 2323 Crotona Avenue rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 100% of its 9 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2323 Crotona Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 2323 Crotona Avenue?
It has 9 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.