Violations at 2317 Cambreleng Avenue
Bronx, NY 10458 · BBL 2-03088-0039 · Back to the property
HPD housing violations
The newest 50 of 132 HPD violations. The city keeps the complete history.
- BHazardous
Properly repair or replace the broken or defective intercom system panel at east wall in the foyer located at apt 5e, 5th story, 5th apartment from south at west
Oct 29, 2026 · Apt 5E
Open — Violation open - BHazardous
Properly repair or replace the broken or defective handle at vestibule door at public hall, 1st story
Sep 14, 2026
Open — Nov certified on time - BHazardous
Properly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to the apartment wall panel in the entire apartment located at apt 5e, 5th story, 5th apartment from east at south
Sep 10, 2026 · Apt 5E
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance and vestibule at public hall, 1st story
Sep 9, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building vestibule door at public hall, 1st story
Jul 23, 2026
Open — Not complied with - ANon-hazardous
File with this department a registration statement for building.
Jul 23, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Mar 27, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west , section ''abi'', at south
Mar 27, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Mar 24, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west
Mar 24, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [hinge] door to trash chute room at public hall, 4th story
Feb 20, 2026
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of motion sensor installed on light fixture at ceiling at stair a at public hall stairs, 4th story
Feb 20, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Dec 10, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west , section ''ab-i'', at south
Dec 10, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 7i, 7th story, 4th apartment from north at east
Nov 15, 2025 · Apt 7I
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 7i, 7th story, 4th apartment from north at east
Nov 15, 2025 · Apt 7I
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the private hallway located at apt 7i, 7th story, 4th apartment from north at east
Nov 15, 2025 · Apt 7I
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on fire rated door in the entrance located at apt 4h, 4th story, 3rd apartment from north at east
Oct 9, 2025 · Apt 4H
Closed — Violation closed - ANon-hazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 4h, 4th story, 3rd apartment from north at east
Oct 9, 2025 · Apt 4H
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the kitchen located at apt 4h, 4th story, 3rd apartment from north at east
Oct 9, 2025 · Apt 4H
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the kitchen located at apt 4h, 4th story, 3rd apartment from north at east
Oct 9, 2025 · Apt 4H
Closed — Violation closed - ANon-hazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 4h, 4th story, 3rd apartment from north at east
Oct 9, 2025 · Apt 4H
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts #5b vacate # 259384 posted on march 20th, 2025 in the entire apartment located at apt, 5th story, 2nd apartment from south at west
Mar 20, 2025
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 3rd room from east located at apt 4b, 4th story
Mar 13, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the bathroom located at apt 4b, 4th story
Mar 13, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 3rd room from east located at apt 3b, 3rd story, 2nd apartment from south at west
Mar 13, 2025 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 5b, 5th story, 2nd apartment from south at west
Mar 11, 2025 · Apt 5B
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the foyer located at apt 5e, 5th story, 5th apartment from south at west
Feb 12, 2025 · Apt 5E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5e, 5th story, 5th apartment from south at west
Feb 12, 2025 · Apt 5E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective buzzer and return voice intercom system from building vestibule up to panel at west wall at apartment 5e , 5th story
Jan 29, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system doors locked at boiler room
Jan 22, 2025
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste line drain pipe at wash/basin in the bathroom located at apt 5e, 5th story, 5th apartment from south at west
Jan 22, 2025 · Apt 5E
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective bell and return buzzer from vestibule to pannel on west wall in the kitchenette located at apt 5e, 5th story, 5th apartment from south at west
Jan 22, 2025 · Apt 5E
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 5th story, 5th apartment from south at west
Jan 22, 2025 · Apt 5E
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling north and west walls in the bathroom located at apt 4b, 4th story, 2nd apartment from south at west
Jan 22, 2025 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west
Jan 22, 2025 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system lock door at boiler room
Jan 13, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 2nd apartment from north at east
Jan 13, 2025 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 5th story, 5th apartment from north at east
Jan 13, 2025 · Apt 5E
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercom (not funtioning correctly with intercom at building vestibule (n) with apartment intercom) at east wall in the foyer located at apt 5e, 5th story, 5th apartment from north at east
Jan 13, 2025 · Apt 5E
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Dec 28, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8e, 8th story, 5th apartment from south at west
Dec 28, 2024 · Apt 8E
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Dec 28, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west
Dec 28, 2024 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west
Dec 28, 2024 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west
Dec 24, 2024 · Apt 4B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling and east wall in the bathroom located at apt 4b, 4th story, 2nd apartment from south at west original violation 17564187 issued 18-dec-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Dec 18, 2024 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west
Dec 18, 2024 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 18, 2024
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling and east wall in the bathroom located at apt 4b, 4th story, 2nd apartment from south at west
Dec 18, 2024 · Apt 4B
Closed — Violation closed
DOB building violations
7 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 27, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 8, 2019
Vp*-violation unserved ecb- dismissed
ECB violations
19 ECB violations, newest first.
- Class - 2
Failure to maintain building exterior facade and appurtenances. note: at time of inspection, i observed at exp #2 south, #3 west, #4 north cracked/spalling mortar joints multi loc.-exp #3 west has missing copin
Oct 25, 2024 · Penalty $1,250
Active - Class - 1
At the time of inspection, observed 8 story occupied mixed use building with ongoing construction work on 1st and 2nd floor. tenant protection plan was not provided nor posted anywhere in the building. g.c fai
May 17, 2023 · Penalty $1,250
Resolve - Class - 2
Work does not conform to approved const documents and/or amendments-sodewalk shed @time of inspection @a 8 sty nb, i observed on street/ground lvl sidealk shed bridge was not built to plans & also braces
May 11, 2020 · Penalty $625
Resolve - Class - 2
Failure to institute safe measures at a construction or demolition site.at time of inspection at an active new building construction jobsitei observed an open elevator shaft at bulkhead that had no guardrails o
Apr 8, 2020 · Penalty $5,000
Resolve - Class - 1
Unsafe storage of combustible materials & equipment @time of inspection i observed combustibel materials (sperated all floors. more than 25 cu. yard. in each floor. which is weight/falls/trip hazards. cutting
Dec 7, 2019 · Penalty $625
Resolve - Class - 1
Failure to maintain housekeeping per section requirement. @time of inspection i observed const materials (seperated) all floors. it is more than 25 cu. yard each floor. which one hazardous. thses debris/matel
Dec 7, 2019 · Penalty $625
Resolve - Class - 1
Failure to safeguard all persons & property affected by const operations. @time of inspection i obseved. workers doing work w/o guardrail(onthe roof), w/o wearing fall protection, & observed no caps on rebar.
Dec 7, 2019 · Penalty $5,000
Resolve - Class - 2
Works contrary to after hours variance permit. @the time of inspectioni observed works performed w/o ahv permit/contrary to 28-105.12.5 rem:obtain permit.
Dec 7, 2019 · Penalty $625
Resolve - Class - 2
Construction superintendent failed to perform duties per code.@time ofinsp of an 8story bldg @roof level const work in progress.during insp noted several violation conditions:1-const chute w/o permit 2-no overh
Aug 26, 2019 · Penalty $2,500
Resolve - Class - 2
3301.1.3contractors shed not fire peterdant treated.@time of insp of 8story bldg @roof level const work in progress.during insp noted that the temp office located @1st fl & the wall was built w/plywood & wood
Aug 26, 2019
Resolve - Class - 1
28-407.1no welder license.@time of insp of 8 story bldg @roof level cost work in progress.during insp noted workers installing stairs from 8th fl to the roof & the workers did not provide a dob welder license a
Aug 26, 2019 · Penalty $625
Resolve - Class - 1
3308.1.2missing hoizontal netting.@time of insp of 8th fl story bldg @roof level const work in progress.during insp noted that the contractor was framing the roof & there is no horizontal nettng @exp #1 as requ
Aug 26, 2019
Resolve - Class - 1
3303.12.2failure to provide elevator in readiness.@time of insp of 8thfl story bldg @roof level const work in progress during insp noted that the bldg is @8th fl level & there is not @least 1 elevator kept in
Aug 26, 2019
Resolve - Class - 1
3301.2no overhead protection.note:@ time of 8th story bldg at roof level const work in progress.during insp noted that all exterior work is not completed & there is no overhead protection @exp #1 as required by
Aug 26, 2019 · Penalty $2,500
Resolve - Class - 1
Work w/o permit/design & permit.@time of insp of 8th story bldg @roof level const work in progress.during insp noted a const chute expected @ exp #1 approx 70' in height,upon request for permit as required bc33
Aug 26, 2019 · Penalty $1,250
Resolve - Class - 2
3309.1=protect adjoining properties.at the time of swo reinspection observed inactive job site.i also observed adjoining 2 story buidling foundation is exposed & loose brick/rocks at exposure two due excavation
Feb 20, 2019
Resolve - Class - 1
Sec. 3304.7 failure to provide at least safe mean of ingress & egress at all times. at time of inspection,i observed workers climbing dirt &gravel non completed slope from foundation level to grade level as a
Feb 8, 2019 · Penalty $2,500
Resolve - Class - 1
Construction super failed to perform duties per codes. at the time of inspection,i observed worker performing duties on site. after approx 20 minutes of observation i ssked worker where is the site super no cou
Feb 8, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to provide protection at side of excavation. at time of inspection,i observed worker climbing up chipped/excavagted rock & boil as ameans to get from foundation level to grade/street level. 1 ladder on
Feb 8, 2019
Resolve