2356 Lorillard Place
Bronx, NY 10458BBL 2-03054-0006Map
Owner of record: Hp 2356 Lorillard & 2710 Bainbridge Hous Ing Develo
2356 Lorillard Place is a walk-up apartment building built in 1931 in Bronx, 10458. It has 30 residential units across 5 floors. The owner of record is Hp 2356 Lorillard & 2710 Bainbridge Hous Ing Develo. HPD has recorded 1,205 housing violations here, most recently on October 9, 2026. 31 of the 50 most recent violations are still open. City tax records listed 31 rent-stabilized apartments here in 2024.
- HPD violations
- 1,205
- DOB violations
- 15
- ECB violations
- 11
- HPD complaints
- 1,798
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,205
- BHazardous
Remove all encumbrances consisting of flower pots at balcony at fire escape, 4th story
Oct 9, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash glass pane at west closet in the 3rd room from east at north located at apt 7, 2nd story, 2nd apartment from south at west
Sep 27, 2026 · Apt 7
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east at south located at apt 7, 2nd story, 2nd apartment from south at west
Sep 27, 2026 · Apt 7
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east at north located at apt 7, 2nd story, 2nd apartment from south at west
Sep 27, 2026 · Apt 7
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 7, 2nd story, 2nd apartment from south at west
Sep 27, 2026 · Apt 7
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 7, 2nd story, 2nd apartment from south at west
Sep 27, 2026 · Apt 7
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 7, 2nd story, 2nd apartment from south at west
Sep 27, 2026 · Apt 7
Open — Nov sent out - BHazardous
Properly secure the loose wash basin in the bathroom located at apt 7, 2nd story, 2nd apartment from south at west
Sep 27, 2026 · Apt 7
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective enamel glaze surface finish at bathtub in the bathroom located at apt 7, 2nd story, 2nd apartment from south at west
Sep 27, 2026 · Apt 7
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 7, 2nd story, 2nd apartment from south at west
Sep 27, 2026 · Apt 7
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 7, 2nd story, 2nd apartment from south at west
Sep 27, 2026 · Apt 7
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 2nd room from east located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - BHazardous
Properly secure the loose escutcheon plate at east steam riser in the 1st room from east located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mortise lock assembly at door in entrance in the foyer located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - BHazardous
Properly secure the loose escutcheon plate at north steam riser in the bathroom located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - BHazardous
Properly secure the loose wash basin in the bathroom located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective enamel glaze surface finish at bathtub in the bathroom located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower wall cabinet and west wall in the kitchen located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective upper and lower window sashes spring balances at fire escape window at west wall in the 3rd room from east at south located at apt 7, 2nd story, 2nd apartment from south at west
Sep 27, 2026 · Apt 7
Open — Civ14 mailed - CImmediately hazardous
Properly repair or replace the broken or defective inoperable lower window sash spring balances at fire escape window at north wall in the kitchen located at apt 18, 3rd story, 1st apartment from west at north
Sep 27, 2026 · Apt 18
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges in the entrance located at apt 7, 2nd story, 2nd apartment from south at west
Sep 27, 2026 · Apt 7
Open — False certification - CImmediately hazardous
M/d law abate the nuisance consisting of free standing refrigerator at public hall, 4th story
Jul 1, 2026
Closed — Violation closed - BHazardous
Refit fire retardant metal door in the entrance located at apt 26, 5th story, 1st apartment from south at west
Jul 1, 2026 · Apt 26
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 26, 5th story, 1st apartment from south at west
Jul 1, 2026 · Apt 26
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 26, 5th story, 1st apartment from south at west
Jul 1, 2026 · Apt 26
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in at sink wasteline in the kitchen located at apt 26, 5th story, 1st apartment from south at west
Jul 1, 2026 · Apt 26
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 8, 2nd story, 1st apartment from south at west
Jun 24, 2026 · Apt 8
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 2nd room from east located at apt 8, 2nd story, 1st apartment from south at west
Jun 24, 2026 · Apt 8
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.
Jun 16, 2026
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 16, 2026
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the north yard
Jun 16, 2026
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 20 sq. ft. at ceiling and all walls in the bathroom located at apt 12a, 2nd story, 2nd apartment from south at west
Jun 1, 2026 · Apt 12A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective sloped wood flooring beaneath north wall radiator in the 2nd room from east at south located at apt 12a, 2nd story, 2nd apartment from south at west
Jun 1, 2026 · Apt 12A
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash, at 2nd window from south at west wall in the 2nd room from east at south located at apt 12a, 2nd story, 2nd apartment from south at west
Jun 1, 2026 · Apt 12A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 12a, 2nd story, 2nd apartment from south at west
Jun 1, 2026 · Apt 12A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective slopped wood flooring in the kitchen located at apt 12a, 2nd story, 2nd apartment from south at west
Jun 1, 2026 · Apt 12A
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 12a, 2nd story, 2nd apartment from south at west
Jun 1, 2026 · Apt 12A
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash, at 1st window from south at west wall, leading to fire escape in the 2nd room from east at south located at apt 12a, 2nd story, 2nd apartment from south at west
Jun 1, 2026 · Apt 12A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 12a, 2nd story, 2nd apartment from south at west
Jun 1, 2026 · Apt 12A
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash at north wall window in the bathroom located at apt 12a, 2nd story, 2nd apartment from south at west
Jun 1, 2026 · Apt 12A
Closed — Violation closed
DOB building violations · 15
- Construction other optional
C-construction other optional
May 3, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Emergency none
Egncy-emergency none
Apr 23, 2010
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed
Show 5 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 1, 1990
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Mar 1, 1990
Dob violation - dismissed
ECB violations · 11
- Class - 2
Found rockmills model#4a45 oil fired boiler with dog bolts missing on boiler doors, also need to be resealed, shut off valve missing at oil supply line at tank, air gap and discharge pipe missing at back flow p
Aug 26, 2024 · Penalty $312
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39038408k issued on 03/28/21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for obstructing the exit
May 1, 2021
Resolve - Class - 1
Observed trash and other materials stored and piled in the corridors of the exit passageways for the rear fire escapes., remove obstruction
Mar 28, 2021 · Penalty $312
Resolve - Class - 1
B154,3,32. b154(51) hazardous condition 3 flue pipe corroded/hole in flue pipe. do not operate boiler until all hazardous conditions are immediately corrected and dob is notified to reinspect to lift cease use
Jun 12, 2017 · Penalty $1,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. noted: plumbing, sheetrock, sheetrock dust piles open to doors to unattended construction areas (empty apts) observed @ every
Apr 13, 2012
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner, use of prohibited door hardware per bc 1008.1.8(j) noted: exit gate serving small courtyard at 4th exp is chained & padlocked. said courtyard serves @ least 5
Apr 13, 2012 · Penalty $1,000
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: exit passgewayat 2nd exp is partially obstructed by multiple plastic bags, mattress-up to supers apt and is totally obstructed by piled debris approx 5'
Apr 13, 2012
Resolve - Class - 2
Fail to comply w.comm order. respondent failed to comply w/comm order to correct the violating conditions & file a certificate of correctionpursuant to 28-204.2, for nov 34832969r. remedy: file certificate of c
Aug 30, 2010 · Penalty $4,000
Resolve - Class - 1
Failure to maintain bldg. wall(s) or appurtenances. cracks & deterioration of martar joints observed at various locations throughout the exterior wall. also noted spalling stucco @ various locations. rem maint
Apr 13, 2010 · Penalty $250
Resolve - Hazardous
Failure to maintain hazardous defects are:cracked, shattered glass in public hallway windows.2-debris stored on public stairs near roof area.3-cracked & chipped marble and/or tile threads ( )areas & floor
Mar 12, 2008 · Penalty $800
Resolve
Show 1 more ↓
- Hazardous
Plumbing work without a permit. found new gas line run in apt. # 27 from gas meter #2501964 to cooking stove. no permits in system. gas shut off by con-ed due to gas leak. remedy: obtain permit call for test an
Oct 3, 2001 · Penalty $1,000
Resolve
Complaints
- Electric
No lighting
Oct 22, 2026 · Apt 25
Open - Door/window
Door
Oct 22, 2026 · Apt 25
Open - Unsanitary condition
Pests
Oct 22, 2026 · Apt 25
Open - Unsanitary condition
Pests
Oct 5, 2026 · Apt 7
Close - Door/window
Window frame
Oct 5, 2026 · Apt 7
Close - Plumbing
Toilet
Oct 5, 2026 · Apt 7
Close - Unsanitary condition
Pests
Oct 5, 2026 · Apt 7
Close - Paint/plaster
Wall
Sep 20, 2026 · Apt 7
Close - Flooring/stairs
Floor
Sep 20, 2026 · Apt 7
Close - Door/window
Window pane
Sep 20, 2026 · Apt 7
Close
Show 40 more ↓
- Electric
Outlet/switch
Sep 20, 2026 · Apt 7
Close - Unsanitary condition
Pests
Sep 20, 2026 · Apt 7
Close - Plumbing
Bathtub/shower
Sep 20, 2026 · Apt 7
Close - Safety
Fire escape
Jun 12, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 12, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 12, 2026 · Apt BLDG
Close - Electric
Outlet/switch
May 28, 2026 · Apt 12A
Close - Unsanitary condition
Mold
May 28, 2026 · Apt 12A
Close - Plumbing
Toilet
May 28, 2026 · Apt 12A
Close - Flooring/stairs
Floor
May 28, 2026 · Apt 12A
Close - Paint/plaster
Radiator
May 28, 2026 · Apt 12A
Close - Door/window
Window frame
May 28, 2026 · Apt 12A
Close - Plumbing
Basin/sink
Apr 21, 2026 · Apt 18
Close - General
Mailbox
Apr 6, 2026 · Apt 26
Close - Door/window
Door frame
Mar 27, 2026 · Apt 26
Close - Paint/plaster
Wall
Mar 27, 2026 · Apt 26
Close - Door/window
Door frame
Mar 24, 2026 · Apt 26
Close - General
Mailbox
Mar 24, 2026 · Apt 26
Close - General
Mailbox
Mar 23, 2026 · Apt 26
Close - Door/window
Door
Mar 23, 2026 · Apt 26
Close - Door/window
Door frame
Mar 20, 2026 · Apt 26
Close - Plumbing
Basin/sink
Mar 17, 2026 · Apt 26
Close - Door/window
Door
Mar 17, 2026 · Apt 26
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt BLDG
Close - General
Mailbox
Mar 10, 2026 · Apt 26
Close - Plumbing
Basin/sink
Mar 10, 2026 · Apt 26
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 12A
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Plumbing
Bathtub/shower
Feb 5, 2026 · Apt 26
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 7
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 7
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Plumbing
Bathtub/shower
Jan 20, 2026 · Apt 26
Close - Plumbing
Basin/sink
Jan 20, 2026 · Apt 26
Close - Plumbing
Basin/sink
Jan 20, 2026 · Apt 26
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 5
- Residential units
- 30
- Building area
- 22,000 ft²
- Lot area
- 5,000 ft²
- Zoning
- R6
- Community board
- 206
- Council district
- 15
- Block / lot
- 3054 / 6
- Assessed value
- $787,950
- Landmark / historic district
- No
HPD registration #209276, last renewed Jul 11, 2025.
Questions about 2356 Lorillard Place
Who owns 2356 Lorillard Place?
The owner of record in NYC Department of City Planning PLUTO data is Hp 2356 Lorillard & 2710 Bainbridge Hous Ing Develo.
Does 2356 Lorillard Place have violations?
Yes. NYC HPD has recorded 1,205 housing violations at this property.
Is 2356 Lorillard Place rent stabilized?
NYC Department of Finance tax bills listed 31 rent-stabilized units here in 2024 (about 100% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2356 Lorillard Place built?
City records list 1931 as the year it was built.
How many apartments are in 2356 Lorillard Place?
It has 30 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.