roofy

2300 Bathgate Avenue

Bronx, NY 10458BBL 2-03052-0005Map

Owner of record: Nugarese INC

2300 Bathgate Avenue is a walk-up apartment building built in 1928 in Bronx, 10458. It has 27 residential units across 5 floors. The owner of record is Nugarese INC. HPD has recorded 83 housing violations here, most recently on October 1, 2026. 25 of the 50 most recent violations are still open. City tax records listed 27 rent-stabilized apartments here in 2024.

HPD violations
83
DOB violations
4
ECB violations
5
HPD complaints
75

What to know

Concern
12 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 1, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
27
About 100% of the building's 27 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 83

  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at vestibule door , 1st story

    Oct 1, 2026

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective counter balance at lower window sash at north wall at public hall, 1st story

    Oct 1, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt a3, 1st story, 1st apartment from east at south

    Sep 11, 2026 · Apt A3

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd room from east at north located at apt a3, 1st story, 1st apartment from east at south

    Sep 11, 2026 · Apt A3

    Open — Civ14 mailed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt a3, 1st story, 1st apartment from east at south

    Sep 11, 2026 · Apt A3

    Open — First no access to re- inspect violation
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt a3, 1st story, 1st apartment from east at south

    Sep 11, 2026 · Apt A3

    Open — Civ14 mailed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft. at south and west wall in the bathroom located at apt b3, 2nd story, 1st apartment from east at south

    Mar 18, 2026 · Apt B3

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt b3, 2nd story, 1st apartment from east at south

    Mar 18, 2026 · Apt B3

    Closed — Violation dismissed
  • B

    Provide adequate lighting at ceiling at fire passage way, section ''north''

    Feb 18, 2026

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at 1st story at public hall

    Feb 18, 2026

    Closed — Violation dismissed
Show 40 more ↓
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall

    Feb 18, 2026

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Feb 18, 2026

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Feb 18, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings sign missing at 1st story

    Feb 18, 2026

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at 1st story at public hall

    Feb 18, 2026

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Feb 18, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at 1st story at public hall

    Feb 18, 2026

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective grout at bathtub in the bathroom located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall in the 3rd room from north located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the bathroom located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Nov certified late
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Nov certified late
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Nov sent out
  • C

    Trace and repair the source and abate the visible mold condition... greater than 30sq ft at ceiling in the bathroom located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Invalid certification
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at north and west walls in the bathroom located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 3rd room from north located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Defect letter issued
  • B

    Properly repair with similar material the broken or defective enamel glaze surface finish at bathtub in the bathroom located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective door at entrance in the bathroom located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective metal base cabinet at sink in the kitchen located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall in the 1st room from north at east located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 1st room from north at east located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Open — Certification postponment granted
  • B

    Properly repair or replace the broken or defective electrical outlets at north and south walls in the 3rd room from north located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall, south wall in the 1st room from north at east located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the west wall, 2nd window frame from north at east wall in the 3rd room from north located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the north and south walls in the bathroom located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the private hallway located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the foyer located at apt d4, 4th story, 2nd apartment from north at east

    Oct 2, 2025 · Apt D4

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door (from vestibule to public hall) , 1st story

    Aug 17, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story

    Aug 17, 2025

    Closed — Violation dismissed
  • A

    Paint or post a sign indicating floors .... at public hall, 2nd story

    Aug 17, 2025

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at south wall at public hall, 1st story

    Aug 17, 2025

    Open — Nov certified late
  • A

    Paint with light colored paint to the satisfaction of this department at south wall at public hall, 1st story

    Aug 17, 2025

    Closed — Violation dismissed

DOB building violations · 4

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Dec 4, 2003

    Vpw*-violation unserved ecb-work without permit-dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed

ECB violations · 5

  • Class - 2

    Failure to maintain building in code-complaint manner: lack of a system of automatic sprinklers where require per bc 903.2; 27-954 i observed in the basement 14 commercial gas dryers and no sprinkler system in

    Jul 13, 2023

    Resolve
  • Class - 2

    Failure to comply w/ commissioner's order contained in summons/violation#32092741r issued on 1/19/18, and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certifica

    Nov 20, 2018 · Penalty $625

    Resolve
  • Class - 2

    B254,36,50,50a,50b,50c. 50-need to clean boiler room of all things inboiler room; 50a-need to replace all covers on controls; 50b-rating plate for burner missing on durn ch; 50c-burner not registered with th

    Jan 19, 2018 · Penalty $500

    Resolve
  • Hazardous

    Failure to provide @ least 2 means of egress from room space as required noted : @ basement level apt. all windows sealed w/ bars (fixed) remedy : provide required means of egress.

    Nov 14, 2006

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by the cofo cofo# 1081 issued 07-06-28 states premises lap 27 units on five stairs @ time of inspec an additional single room was occupied as sleeping room in bsmt premises

    Jul 25, 2006

    Resolve

Complaints

  • Paint/plaster

    Ceiling

    Sep 10, 2026 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jan 9, 2026 · Apt C5

    Close
  • Unsanitary condition

    Mold

    Sep 24, 2025 · Apt D4

    Close
  • Unsanitary condition

    Pests

    Sep 24, 2025 · Apt D4

    Close
  • Paint/plaster

    Wall

    Sep 24, 2025 · Apt D4

    Close
  • Unsanitary condition

    Pests

    Sep 24, 2025 · Apt D4

    Close
  • Appliance

    Electric/gas range

    Sep 24, 2025 · Apt D4

    Close
  • Unsanitary condition

    Pests

    Sep 1, 2025 · Apt C5

    Close
  • Unsanitary condition

    Pests

    Aug 26, 2025 · Apt C5

    Close
Show 40 more ↓
  • Unsanitary condition

    Pests

    Aug 14, 2025 · Apt C5

    Close
  • Heat/hot water

    Entire building

    Dec 25, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2024 · Apt BLDG

    Close
  • Appliance

    Electric/gas range

    Jun 5, 2024 · Apt D4

    Close
  • Plumbing

    Basin/sink

    Jun 5, 2024 · Apt D4

    Close
  • Door/window

    Window pane

    Jun 5, 2024 · Apt D4

    Close
  • Unsanitary condition

    Pests

    Jun 5, 2024 · Apt D4

    Close
  • Water leak

    Slow leak

    Jun 5, 2024 · Apt D4

    Close
  • Paint/plaster

    Ceiling

    Jun 5, 2024 · Apt D4

    Close
  • Safety

    Smoke detector

    Mar 14, 2022 · Apt D4

    Close
  • Heat/hot water

    Entire building

    Nov 23, 2018 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Jan 7, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 7, 2017 · Apt C2

    Close
  • Heat/hot water

    Entire building

    Jan 7, 2017 · Apt D4

    Close
  • Heating

    Heat related

    Nov 13, 2013 · Apt NA

    Close
  • Appliance

    Electric/gas range

    Apr 26, 2013 · Apt 5D

    Close
  • Nonconst

    Carbon monoxide

    Apr 26, 2013 · Apt D2

    Close
  • Paint/plaster

    Wall

    Apr 29, 2011 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Apr 29, 2011 · Apt 2A

    Close
  • Nonconst

    Vermin

    Nov 25, 2009 · Apt 3E

    Close
  • Nonconst

    Vermin

    Mar 24, 2009 · Apt E1

    Close
  • Nonconst

    Vermin

    Jul 22, 2008 · Apt 3A

    Close
  • Heating

    Heat related

    Feb 19, 2007 · Apt 4D

    Close
  • Nonconst

    Vermin

    Aug 29, 2006 · Apt 5E

    Close
  • Nonconst

    Vermin

    Aug 29, 2006 · Apt 5E

    Close
  • Nonconst

    Vermin

    Jun 27, 2006 · Apt 2E

    Close
  • Nonconst

    Vermin

    Jun 26, 2006 · Apt 4E

    Close
  • Nonconst

    Vermin

    Jun 26, 2006 · Apt 4D

    Close
  • Nonconst

    Vermin

    Jun 17, 2006 · Apt 3E

    Close
  • Nonconst

    Vermin

    Jun 17, 2006 · Apt 3E

    Close
  • Plumbing

    Basin/sink

    Jan 25, 2006 · Apt 5E

    Close
  • Paint/plaster

    Wall

    Jan 25, 2006 · Apt 5E

    Close
  • Paint/plaster

    Wall

    Jan 25, 2006 · Apt 5E

    Close
  • General

    Ceramic-tile

    Jan 25, 2006 · Apt 5E

    Close
  • Heating

    Heat related

    Dec 29, 2005 · Apt 2A

    Close
  • Heating

    Heat related

    Dec 19, 2005 · Apt 5E

    Close
  • Heating

    Heat related

    Oct 23, 2005 · Apt 3E

    Close
  • Electric

    Electric-supply

    Sep 26, 2005 · Apt 5E

    Close
  • Nonconst

    Illegal

    Jul 27, 2004 · Apt BLDG.

    Close
  • Nonconst

    Illegal

    Jul 27, 2004 · Apt BLDG.

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1928
Floors
5
Residential units
27
Building area
22,000 ft²
Lot area
5,780 ft²
Zoning
R6A
Community board
206
Council district
15
Block / lot
3052 / 5
Assessed value
$724,950
Landmark / historic district
No

HPD registration #209094, last renewed Aug 20, 2025.

Questions about 2300 Bathgate Avenue

Who owns 2300 Bathgate Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Nugarese INC.

Does 2300 Bathgate Avenue have violations?

Yes. NYC HPD has recorded 83 housing violations at this property.

Is 2300 Bathgate Avenue rent stabilized?

NYC Department of Finance tax bills listed 27 rent-stabilized units here in 2024 (about 100% of its 27 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2300 Bathgate Avenue built?

City records list 1928 as the year it was built.

How many apartments are in 2300 Bathgate Avenue?

It has 27 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.