2170 Bathgate Avenue
Bronx, NY 10457BBL 2-03048-0009Map
Owner of record: 2170 Mw LLC
2170 Bathgate Avenue is a walk-up apartment building built in 1925 in Bronx, 10457. It has 30 residential units across 6 floors. The owner of record is 2170 Mw LLC. HPD has recorded 614 housing violations here, most recently on October 13, 2026. 33 of the 50 most recent violations are still open. City tax records listed 33 rent-stabilized apartments here in 2024.
- HPD violations
- 614
- DOB violations
- 2
- ECB violations
- 5
- HPD complaints
- 1,048
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 614
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall, north wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Oct 13, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Oct 13, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway , the 2nd room from east at south located at apt 1, 1st story, 1st apartment from east at south
Oct 13, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from east at south
Oct 13, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Oct 13, 2026
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 1, 1st story, 1st apartment from east at south
Oct 13, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Oct 13, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Oct 13, 2026 · Apt 1
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall, north wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from east at south
Oct 13, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from east at south wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from east at south
Oct 13, 2026 · Apt 1
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Oct 13, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling, south wall, and east wall in the private hallway located at apt 1, 1st story, 1st apartment from east at south
Oct 13, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a1, 1st story, 1st apartment from north at east
Oct 7, 2026 · Apt A1
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south and west walls in the bathroom located at apt a1, 1st story, 1st apartment from north at east
Oct 7, 2026 · Apt A1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a1, 1st story, 1st apartment from north at east
Oct 7, 2026 · Apt A1
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 5th story
Sep 16, 2026
Open — Violation will be reinspected - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic soap dish at west wall in the bathroom located at apt e3, 6th story, 1st apartment from east at south
Sep 16, 2026 · Apt E3
Open — Violation will be reinspected - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt e3, 6th story, 1st apartment from east at south
Sep 16, 2026 · Apt E3
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing in the entire apartment located at apt e3, 6th story, 1st apartment from east at south
Sep 16, 2026 · Apt E3
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at , in the entire apartment located at apt e3, 6th story, 1st apartment from east at south
Sep 16, 2026 · Apt E3
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt e3, 6th story, 1st apartment from east at south
Sep 16, 2026 · Apt E3
Open — Civ14 mailed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at ... in the entire apartment located at apt b3, 3rd story, 1st apartment from east at south
Sep 4, 2026 · Apt B3
Open — Civ14 mailed - BHazardous
Remove all obstructions and repair all defects in drainpipe at bathtub in the bathroom located at apt a1, 1st story, 1st apartment from north at east
Aug 18, 2026 · Apt A1
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north, south, and west walls in the bathroom located at apt a1, 1st story, 1st apartment from north at east
Aug 18, 2026 · Apt A1
Open — Invalid certification - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling, north, south, and west walls in the bathroom located at apt a1, 1st story, 1st apartment from north at east
Aug 18, 2026 · Apt A1
Open — Invalid certification - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet handle in the bathroom located at apt a1, 1st story, 1st apartment from north at east
Aug 18, 2026 · Apt A1
Open — Invalid certification - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet of mold at window casing in the bathroom located at apt 2, 1st story, 1st apartment from west at north
Jun 24, 2026 · Apt 2
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 1st story, 1st apartment from west at north
Jun 24, 2026 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the missing wood door at room entrance in the 2nd room from east located at apt 2, 1st story, 1st apartment from west at north
Jun 24, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Replace with new the missing wood door at closet in the private hallway located at apt 2, 1st story, 1st apartment from west at north
Jun 24, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechanical stopper at bathtub in the bathroom located at apt 2, 1st story, 1st apartment from west at north
Jun 24, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch and assembly at building entrance door , 1st story
Jun 24, 2026
Closed — Violation closed - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 2, 1st story, 1st apartment from west at north
Jun 24, 2026 · Apt 2
Open — Not complied with - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2, 1st story, 1st apartment from west at north
Jun 24, 2026 · Apt 2
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door to roof at 1st public hall bulkhead from north, 6th story
Jun 19, 2026
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consiting of string lights and wires at 6th story balcony at 2nd fire escape from north at west exterior wall (building front) at fire escape
Jun 19, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and its assemblies at door to roof at 1st public hall bulkhead from north, 6th story
Jun 19, 2026
Closed — Violation closed - BHazardous
Provide an unlockable slide bolt and lock or hook on roof door that allows re entry from roof to public hall at 1st public hall bulkhead from north, 6th story
Jun 19, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak over the ceiling (at vestibule) at public hall, 1st story
Jun 19, 2026
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2, 1st story, 1st apartment from west at north
Jun 19, 2026 · Apt 2
Open — Not complied with - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at , in the entire apartment located at apt e3, 5th story
Jun 19, 2026 · Apt E3
Open — Violation will be reinspected - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door to roof at 1st public hall bulkhead from north, 6th story
Jun 19, 2026
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degress at fixtures throughout kitchen and bathroom in the entire apartment located at apt 2, 1st story, 1st apartment from west at north
Jun 19, 2026 · Apt 2
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing in the entire apartment located at apt 2, 1st story, 1st apartment from west at north
Jun 19, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 2, 1st story, 1st apartment from west at north
Jun 19, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to panel at west wall in the kitchen located at apt e3, 5th story
Jun 19, 2026 · Apt E3
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household debris at public hall, 6th story
Apr 11, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door at 1st public hall bulkhead from north, 7th story
Apr 11, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of house hold items at public hall, 5th story
Apr 8, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt e3, 5th story, 1st apartment from east at south
Apr 8, 2026 · Apt E3
Open — Not complied with
DOB building violations · 2
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 5
- Class - 2
B254,11a,32a,50a,50b,50c. as per class 2 (b254) 28-301.1 failure to maintain. 32a-exposed electrical wiring; 11a-surface blowdown valve/piping not installed; 50a-guards for water level sight glass missing;50b
Oct 15, 2018 · Penalty $655
Active - Class - 2
Failure to maintain bldg in code compliant manner. noted: at 4th sty apt d3,bathroom,floor is sagging & vertical cracks observed at wall. some tiles missing. remedy: repair &/or replace.
Dec 2, 2016 · Penalty $250
Active - Class - 1
Failure to maintan bldg in code compliant manner. at apt a4 ceiling inbedroom collapsed due to defective joists & water leak in bathtub of apt b4. remedy: make repairs in safe and lawful manner/partial
Dec 17, 2011 · Penalty $1,000
Resolve - Class - 2
Failure to maintain building in code-complaint manner. note: sheetrockceiling in bathroom has 2'x 2' hole which was recently covered & patche but left incompletely done;there are seems w/1/2 gaps where existing
Sep 28, 2011 · Penalty $500
Resolve - Non-hazardous
Failure to maintain defect is: brick work crack + defective . brick work crack+defective at north wall of rear south fire passageway. remedy: repair brick work to safe+lawful condition.
Aug 1, 1988
Resolve
Complaints
- Plumbing
Toilet
Oct 13, 2026 · Apt 1
Open - Water leak
Heavy flow
Oct 11, 2026 · Apt 1
Close - Paint/plaster
Ceiling
Oct 11, 2026 · Apt 1
Close - Water leak
Heavy flow
Oct 7, 2026 · Apt 1
Close - Paint/plaster
Ceiling
Oct 7, 2026 · Apt 1
Close - Water leak
Slow leak
Oct 2, 2026 · Apt 1
Close - Electric
Power outage
Sep 30, 2026 · Apt A1
Close - Plumbing
Toilet
Sep 29, 2026 · Apt A1
Close - Plumbing
Bathtub/shower
Sep 29, 2026 · Apt A1
Close - Water leak
Slow leak
Sep 29, 2026 · Apt A1
Close
Show 40 more ↓
- Electric
Outlet/switch
Sep 29, 2026 · Apt A1
Close - Paint/plaster
Ceiling
Sep 29, 2026 · Apt A1
Close - Unsanitary condition
Pests
Sep 29, 2026 · Apt A1
Close - Unsanitary condition
Sewage
Sep 29, 2026 · Apt A1
Close - Plumbing
Basin/sink
Sep 29, 2026 · Apt A1
Close - Plumbing
Water supply
Sep 3, 2026 · Apt BLDG
Close - Plumbing
Toilet
Aug 11, 2026 · Apt A1
Close - Unsanitary condition
Pests
Jul 7, 2026 · Apt 1
Open - Unsanitary condition
Pests
Jul 6, 2026 · Apt 1
Open - Plumbing
Basin/sink
Jun 17, 2026 · Apt 2
Close - Plumbing
Water supply
Jun 17, 2026 · Apt 2
Close - Appliance
Refrigerator
Jun 17, 2026 · Apt 2
Close - Door/window
Door
Jun 17, 2026 · Apt 2
Close - Door/window
Window frame
Jun 9, 2026 · Apt D3
Close - Plumbing
Toilet
Jun 9, 2026 · Apt D3
Close - General
Bell/buzzer/intercom
Jun 9, 2026 · Apt D3
Close - Paint/plaster
Ceiling
Jun 9, 2026 · Apt D3
Close - Water leak
Damp spot
Jun 9, 2026 · Apt D3
Close - Paint/plaster
Wall
Jun 9, 2026 · Apt D3
Close - Water leak
Heavy flow
Jun 3, 2026 · Apt 1
Close - Plumbing
Toilet
Apr 27, 2026 · Apt A1
Close - Water leak
Slow leak
Apr 27, 2026 · Apt A1
Close - Plumbing
Toilet
Apr 27, 2026 · Apt A1
Close - Unsanitary condition
Sewage
Apr 27, 2026 · Apt A1
Close - Paint/plaster
Ceiling
Apr 27, 2026 · Apt A1
Close - Plumbing
Bathtub/shower
Apr 27, 2026 · Apt A1
Close - Electric
Lighting
Apr 27, 2026 · Apt A1
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 5, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 1, 2026 · Apt E3
Close - Plumbing
Basin/sink
Apr 1, 2026 · Apt E3
Close - Plumbing
Toilet
Apr 1, 2026 · Apt E3
Close - General
Cabinet
Apr 1, 2026 · Apt E3
Close - Paint/plaster
Wall
Apr 1, 2026 · Apt E3
Close - Door/window
Window frame
Mar 19, 2026 · Apt 5D
Close - Unsanitary condition
Mold
Mar 19, 2026 · Apt 5D
Close - Flooring/stairs
Floor
Mar 19, 2026 · Apt 5D
Close - Water leak
Slow leak
Mar 19, 2026 · Apt 5D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1925
- Floors
- 6
- Residential units
- 30
- Building area
- 24,200 ft²
- Lot area
- 6,962 ft²
- Zoning
- R6A
- Community board
- 206
- Council district
- 15
- Block / lot
- 3048 / 9
- Assessed value
- $685,800
- Landmark / historic district
- No
HPD registration #209088, last renewed Sep 3, 2025.
Questions about 2170 Bathgate Avenue
Who owns 2170 Bathgate Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2170 Mw LLC.
Does 2170 Bathgate Avenue have violations?
Yes. NYC HPD has recorded 614 housing violations at this property.
Is 2170 Bathgate Avenue rent stabilized?
NYC Department of Finance tax bills listed 33 rent-stabilized units here in 2024 (about 100% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2170 Bathgate Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 2170 Bathgate Avenue?
It has 30 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.