915 Elsmere Place
Bronx, NY 10460BBL 2-02985-0064Map
Owner of record: 915 Elsmere Place Bronx Associates LLC
915 Elsmere Place is an elevator apartment building built in 2021 in Bronx, 10460. It has 76 residential units across 9 floors. The owner of record is 915 Elsmere Place Bronx Associates LLC. HPD has recorded 83 housing violations here, most recently on September 27, 2026. 7 of the 50 most recent violations are still open. City tax records listed 76 rent-stabilized apartments here in 2024.
- HPD violations
- 83
- DOB violations
- 8
- ECB violations
- 25
- HPD complaints
- 280
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 83
- ANon-hazardous
Refit heating baseboards cover at south wall in the 1st room from east located at apt 8a, 8th story, 3rd apartment from east at south
Sep 27, 2026 · Apt 8A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the bathroom located at apt 8a, 8th story, 3rd apartment from east at south
Sep 27, 2026 · Apt 8A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 8a, 8th story, 3rd apartment from east at south
Sep 27, 2026 · Apt 8A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain ennamel finish by method of reglaging at bathtub in the bathroom located at apt 8a, 8th story, 3rd apartment from east at south
Sep 27, 2026 · Apt 8A
Open — Nov sent out - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set [ at door from vestibule to public hallway ] , 1st story
Jun 30, 2026
Closed — Violation closed - BHazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device [ at door from vestibule to public hallway ] , 1st story
Jun 30, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at hopper chute door at public hall, 2nd story
Jun 30, 2026
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 10, 2026
Closed — Violation closed - BHazardous
Provide in the event of power outrage by means of an acceptable mechanical heavy-lock and latch set at the building entrance door (from street to vestibule) at public hall, 1st story
Jun 10, 2026
Closed — Violation closed - BHazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at the building entrance door at public hall, 1st story
Jun 10, 2026
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jun 10, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set and it's assemblys to vestibule door at public hall, 1st story
Jun 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch to door at vestibule at public hall, 1st story
Jun 2, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set and it's assemblys on the door in the building entrance. at public hall, 1st story
Jun 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch to door from street to vestibule at public hall, 1st story
Jun 2, 2026
Closed — Violation closed - ANon-hazardous
Properly secure the loose spout at bathtub in the bathroom located at apt 7j, 7th story, 3rd apartment from west at north , section ''e-j'', at east
May 6, 2026 · Apt 7J
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 7j, 7th story, 3rd apartment from west at north , section ''e-j'', at east
May 6, 2026 · Apt 7J
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective door at lower cabinet at sink in the kitchen located at apt 7j, 7th story, 3rd apartment from west at north , section ''e-j'', at east
May 6, 2026 · Apt 7J
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tile in the 2nd room from east located at apt 8d, 8th story, 2nd apartment from east at south , section ''d-h'', at east
May 6, 2026 · Apt 8D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 8d, 8th story, 2nd apartment from east at south , section ''d-h'', at east
May 6, 2026 · Apt 8D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 8d, 8th story, 2nd apartment from east at south , section ''d-h'', at east
May 6, 2026 · Apt 8D
Closed — Violation dismissed - ANon-hazardous
Repair the leaky and/or defective faucets handle at sink in the kitchenette located at apt 7j, 7th story, 3rd apartment from west at north , section ''e-j'', at east
May 6, 2026 · Apt 7J
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south , section at west
Apr 28, 2026 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 8a, 8th story, 3rd apartment from east at south
Mar 23, 2026 · Apt 8A
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 8a, 8th story, 3rd apartment from east at south
Mar 23, 2026 · Apt 8A
Open — First no access to re- inspect violation - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at south wall (near hydronic baseboard heater) in the 1st room from east located at apt 8a, 8th story, 3rd apartment from east at south
Mar 23, 2026 · Apt 8A
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 8d, 8th story, 2nd apartment from east at south
Dec 15, 2025 · Apt 8D
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 8d, 8th story, 2nd apartment from east at south
Dec 15, 2025 · Apt 8D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2i, 2nd story, 1st apartment from east at south
Oct 14, 2025 · Apt 2I
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at hopper door, at compactor closet. at public hall, 3rd story
Oct 6, 2025
Closed — Violation closed - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Oct 6, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 4th story, 4th apartment from south at west
Oct 6, 2025 · Apt 3C
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from north located at apt 6j, 6th story, 4th apartment from west at north
Apr 23, 2025 · Apt 6J
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures .. in the kitchen located at apt 6j, 6th story, 4th apartment from west at north
Apr 23, 2025 · Apt 6J
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2i, 2nd story, 1st apartment from east at south
Apr 23, 2025 · Apt 2I
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story
Apr 23, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5f, 5th story, 3rd apartment from west at north
Feb 22, 2025 · Apt 5F
Closed — Violation dismissed - BHazardous
Refit north 1 casment window in the 1st room from north at east located at apt 8b, 8th story, 1st apartment from west at north
Jan 17, 2025 · Apt 8B
Closed — Violation dismissed - BHazardous
Refit at north 1 casment window in the 1st room from north at west located at apt 8b, 8th story, 1st apartment from west at north
Jan 17, 2025 · Apt 8B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 15, 2025
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective wall mounted electrical heating and cooling system in the 3rd room from north at east located at apt 4a, 4th story, 5th apartment from east at south
Jan 15, 2025 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures low volume pressure from hot water supply at bathroom and in the kitchen located at apt 4a, 4th story, 5th apartment from east at south
Jan 15, 2025 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 5th apartment from east at south
Jan 15, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Jan 10, 2025
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of intercom located between the locked front door and vestibule and prevent communication with tenants
Jan 10, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2i, 2nd story, 1st apartment from east at south
Dec 6, 2024 · Apt 2I
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 6, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ptac heating and cooling system at south wall in the 1st room from north at west located at apt 2i, 2nd story, 1st apartment from east at south
Nov 30, 2024 · Apt 2I
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ptac heating/ cooling system at south wall in the 1st room from north at east located at apt 2i, 2nd story, 1st apartment from east at south
Nov 30, 2024 · Apt 2I
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system made call no answer phone 929,484,5458 at boiler room, 9th story
Nov 24, 2024
Closed — Violation closed
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed
ECB violations · 25
- Class - 1
At time of inspection of a 9 story nb active site, i observed adjacent property at exp#2 chimney/vent/fan aprox 2 feet from edge of nb aprox 30ft above 1932 crotona pkwy bx, not extended or offset as required p
Oct 7, 2022
Resolve - Class - 1
At time of inspection of a 9 story nb active site. i obeserved adjacent property at ex4 chimney/vent/fan approximately 2 ft from edge at exp2 of nb 30 ft above 1932 crotona pkwy bx. not extendend as required du
Jul 28, 2022
Resolve - Class - 2
3307.6.4.4 failure to provide high visibility markings on sidewalk shed on street or tie-ins anchor tie or barriers ar exp1 driveway.noted at time of inspection at a 9 story new building active jobsite,i observ
Mar 28, 2022
Resolve - Class - 2
3309.10 failure to protect adjoining property-no/missing/inadequate roof protection at exp2.noted at time of inspection at a 9 story new building active jobsite,i observed roof protection of adjoining property
Mar 28, 2022
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments-work contrary to supported scaffold plans.noted at time of inspection at a 9 story new building active jobsite,i observed on e
Mar 28, 2022
Resolve - Class - 2
3307.6.5.5 failure to maintain sidewalk shed-cleaning at exp1,4.noted at time of inspection at a 9 story new building active jobsite,i observed a sidewalk shed in place at exp1,4 approx 8-12ft high.upon further
Mar 28, 2022
Resolve - Class - 2
Bc3301.1.3 failure to provide manufacturer specs & logs for safety equipment on site.at tme of inspection on an active 9 story no construction site.notice workers using concrete embedded anchor straps on the 3r
Oct 13, 2021 · Penalty $620
Resolve - Class - 1
Bc3301.6 failure to provide design drawings for fall arrest system.at time of inspection on an active 9 story nb construction site.notice about 10-12 workers on the 3rd fl doing cmu block work also observed 2 w
Oct 13, 2021 · Penalty $2,500
Resolve - Class - 1
Bc3303.8 failure to provide standpipe in state of readiness.at time of inspection on active 9 story nb construction site observed work being done on insulatio of standpipe inside building also informed by worke
Aug 17, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to communicate required information to workers during pre shift safety meetings.at time of inspection on active 9 story nb construction site observed contractor and competent person failed to maintain p
Aug 17, 2021 · Penalty $5,000
Resolve
Show 15 more ↓
- Class - 2
Superintendent failed to perform duties as per code.at time of inspection on active 9 story nb construction site observed conditions on site unnoticed by superintendent (1)hoist only operates to 4th floor and b
Aug 17, 2021 · Penalty $2,500
Resolve - Class - 1
Bc3303.12 failure to have hoist/elevator in readiness as per code.at time of inspection on active 9 story nb construction site observed that hoist was out of order 2nd only able to open at 4th floor where build
Aug 17, 2021 · Penalty $2,500
Resolve - Class - 1
Bc3308.6 failure to provide & maintain horizontal safety netting as per code.at time of inspection on active 9 story nb construction site observed horizontal netting not in place as per code.code requires netti
Aug 17, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to provide overhead protection as per code.at time of inspection on active 9 story nb construction site observed at exp #2 adjacent roof below mose upper floor.observed door opening onto roof of adjacen
Aug 17, 2021 · Penalty $1,250
Resolve - Class - 1
Bc3301.6 failure to provide design drawings for temp platform on site.at time of inspection on active 9 story nb construction site observed workers working on platform not build as per safety.when design drawin
Aug 17, 2021 · Penalty $625
Resolve - Class - 1
Failure to maintain guardrails on site as per code.at time of inspection on active 9 story nb construction site observed openings and guardrails not in place or maintained per code. openings on floor 7 and belo
Aug 17, 2021 · Penalty $5,000
Resolve - Class - 1
3303.4.1.1 failure to maintain.note:at the time of inspection,observeda construction site at soe level.workers working on it.also observed sidewalk inside the fence area is cracked,broken making tripping hazard
Jan 27, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to safeguard public & property note:at the time of inspection observed a construction site at soe level.workers doing piling work onit.also observed several cracks on street in front of construction fen
Jan 27, 2021
Resolve - Class - 1
3307.2.2 temporary public walkway in the street.note:at the time of inspection,observed a construction site at soe level.workers working on it.also observed a temporary walkway open to the public provided on st
Jan 27, 2021
Resolve - Class - 2
Construction superintendent failed to perform duties per code.at time of inspection observed an active construction site with excavation work in progress.during inspection noted several violating conditions:(1)
Nov 27, 2020 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents.at time of inspection observed an active construction site with excavation work in progress.during inspection noted after reviewing the soe plans that th
Nov 27, 2020 · Penalty $625
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. noted: observed retaining wall has collapsed onto the adjoining property. remedy: repair &/or replace.
Feb 15, 2020 · Penalty $3,125
Resolve - Class - 1
Failure to maintain wall(s) an don appurtentenances treianing wall has collapsed onto adjourning property maintain building wall(s)
Dec 27, 2019 · Penalty $2,500
Resolve - Class - 2
Violation of parking regulations in a residential district. at time of inspection noted around 37 vehicles parked in the lot with no plates, no registration and no inspection stickers. this should be a vacant l
Nov 22, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building wall or appurtenances.retaining wall approximately 10"highx60"long.at east side of property adjoining 1939 dalyaveis leaning approximately 6"-10" and pushing on adjacent garage.reme
Oct 31, 2019
Resolve
Complaints
- Unsanitary condition
Pests
Sep 22, 2026 · Apt 8A
Close - Paint/plaster
Wall
Sep 22, 2026 · Apt 8A
Close - Paint/plaster
Ceiling
Sep 22, 2026 · Apt 8A
Close - Door/window
Door frame
Sep 22, 2026 · Apt 8A
Close - Plumbing
Bathtub/shower
Sep 22, 2026 · Apt 8A
Close - Unsanitary condition
Mold
Sep 22, 2026 · Apt 8A
Close - Electric
Wiring
Sep 22, 2026 · Apt 8A
Close - Unsanitary condition
Pests
Sep 22, 2026 · Apt 8A
Close - Door/window
Door
Jun 4, 2026 · Apt 6J
Close - Unsanitary condition
Mold
May 8, 2026 · Apt 8D
Close
Show 40 more ↓
- Appliance
Electric/gas range
Apr 30, 2026 · Apt 4C
Close - Flooring/stairs
Floor
Apr 30, 2026 · Apt 8D
Close - Water leak
Heavy flow
Apr 30, 2026 · Apt 8D
Close - Unsanitary condition
Mold
Apr 30, 2026 · Apt 8D
Close - Heat/hot water
Entire building
Apr 29, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Apr 29, 2026 · Apt 8D
Open - Heat/hot water
Apartment only
Apr 29, 2026 · Apt 8D
Open - Heat/hot water
Apartment only
Apr 29, 2026 · Apt 7J
Close - General
Cabinet
Apr 29, 2026 · Apt 7J
Close - Heat/hot water
Apartment only
Apr 28, 2026 · Apt 7J
Close - Heat/hot water
Apartment only
Apr 26, 2026 · Apt 4C
Close - Unsanitary condition
Pests
Apr 26, 2026 · Apt 4C
Close - Appliance
Electric/gas range
Apr 26, 2026 · Apt 4C
Close - Plumbing
Bathtub/shower
Mar 18, 2026 · Apt 8A
Close - Plumbing
Basin/sink
Mar 18, 2026 · Apt 8A
Close - Paint/plaster
Wall
Mar 18, 2026 · Apt 8A
Close - Plumbing
Radiator
Mar 18, 2026 · Apt 8A
Close - Unsanitary condition
Mold
Mar 18, 2026 · Apt 8A
Close - Paint/plaster
Wall
Mar 18, 2026 · Apt 8A
Close - Paint/plaster
Ceiling
Mar 18, 2026 · Apt 8A
Close - Unsanitary condition
Pests
Feb 12, 2026 · Apt 2A
Close - Electric
Wiring
Feb 12, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Feb 12, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Feb 12, 2026 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 12, 2026 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 3D
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Dec 10, 2025 · Apt 8D
Close - Heat/hot water
Apartment only
Dec 3, 2025 · Apt 2I
Close - Unsanitary condition
Mold
Nov 25, 2025 · Apt 8D
Close - Flooring/stairs
Floor
Nov 25, 2025 · Apt 8D
Close - Flooring/stairs
Floor
Nov 25, 2025 · Apt 8D
Close - Water leak
Heavy flow
Nov 25, 2025 · Apt 8D
Close - Flooring/stairs
Floor
Nov 24, 2025 · Apt 8D
Close - Water leak
Slow leak
Nov 24, 2025 · Apt 8D
Close - Unsanitary condition
Mold
Nov 24, 2025 · Apt 8D
Close - Heat/hot water
Apartment only
Nov 17, 2025 · Apt 6C
Close - Door/window
Window frame
Nov 17, 2025 · Apt 6C
Close - Unsanitary condition
Pests
Oct 13, 2025 · Apt 2I
Close - Heat/hot water
Apartment only
Oct 13, 2025 · Apt 2I
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2021
- Floors
- 9
- Residential units
- 76
- Building area
- 64,610 ft²
- Lot area
- 9,825 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 2985 / 64
- Assessed value
- $5,210,100
- Landmark / historic district
- No
HPD registration #228613, last renewed Jul 15, 2025.
Questions about 915 Elsmere Place
Who owns 915 Elsmere Place?
The owner of record in NYC Department of City Planning PLUTO data is 915 Elsmere Place Bronx Associates LLC.
Does 915 Elsmere Place have violations?
Yes. NYC HPD has recorded 83 housing violations at this property.
Is 915 Elsmere Place rent stabilized?
NYC Department of Finance tax bills listed 76 rent-stabilized units here in 2024 (about 100% of its 76 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 915 Elsmere Place built?
City records list 2021 as the year it was built.
How many apartments are in 915 Elsmere Place?
It has 76 residential units and 78 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.