roofy

1300 Rev James Polite Ave

Bronx, NY 10459BBL 2-02973-0052Map

Owner of record: Ek Polite LLC

1300 Rev James Polite Ave is a walk-up apartment building built in 2021 in Bronx, 10459. It has 17 residential units across 4.5 floors. The owner of record is Ek Polite LLC. HPD has recorded 25 housing violations here, most recently on May 16, 2026. 2 of the 25 most recent violations are still open. City tax records listed 17 rent-stabilized apartments here in 2024.

HPD violations
25
DOB violations
1
ECB violations
9
HPD complaints
59

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 16, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
17
About 100% of the building's 17 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 25

  • A

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt ph5a, 5th story, 2nd apartment from east at south

    May 16, 2026 · Apt PH5A

    Closed — Violation dismissed
  • B

    Refit door at base cabinet at east wall in the kitchen located at apt ph5a, 5th story, 2nd apartment from east at south

    May 16, 2026 · Apt PH5A

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt ph5a, 5th story, 2nd apartment from east at south

    May 16, 2026 · Apt PH5A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3d, 3rd story, 1st apartment from north at east

    Nov 16, 2025 · Apt 3D

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1d, 1st story, 1st apartment from north at east , section ''east''

    Nov 2, 2025 · Apt 1D

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1d, 1st story, 1st apartment from north at east , section ''east''

    Nov 2, 2025 · Apt 1D

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3d, 3rd story

    Sep 26, 2025 · Apt 3D

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 3rd story

    Sep 26, 2025 · Apt 3D

    Open — Not complied with
  • B

    Trace and repair the source and abate the visible mold condition... ..more than 10 sq ft athe ceiling in the bathroom located at apt 3d, 3rd story

    Sep 26, 2025 · Apt 3D

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from north at east

    Sep 19, 2025 · Apt 3D

    Closed — Violation dismissed
Show 15 more ↓
  • C

    Abate the infestation consisting of mice in the kitchen located at apt 3d, 3rd story, 1st apartment from north at east

    Jul 11, 2025 · Apt 3D

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from north at east

    Jul 11, 2025 · Apt 3D

    Open — Not complied with
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1d, 1st story, 1st apartment from north at east

    Feb 10, 2025 · Apt 1D

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective convector unit (hvac) at west wall in the 1st room from east at north located at apt 1d, 1st story, 1st apartment from north at east

    Feb 10, 2025 · Apt 1D

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective convector unit (hvac) at west wall in the 1st room from east at south located at apt 1d, 1st story, 1st apartment from north at east

    Feb 10, 2025 · Apt 1D

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective convector unit (hvac) at east wall in the 2nd room from east at south located at apt 1d, 1st story, 1st apartment from north at east

    Feb 10, 2025 · Apt 1D

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective convector unit (hvac) at east wall in the 3rd room from east located at apt 1d, 1st story, 1st apartment from north at east

    Feb 10, 2025 · Apt 1D

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1d, 1st story, 1st apartment from north at east

    Feb 10, 2025 · Apt 1D

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 2nd apartment from east at south

    Dec 7, 2024 · Apt 1B

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1b, 1st story, 2nd apartment from east at south

    Dec 7, 2024 · Apt 1B

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Dec 7, 2024

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective hvac split unit at west wall in the 2nd room from east at south located at apt 1b, 1st story, 2nd apartment from east at south

    Dec 7, 2024 · Apt 1B

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 2nd apartment from south at west , 1st section from south at west

    Dec 4, 2024 · Apt 1B

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Dec 4, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 18, 2024

    Closed — Violation dismissed

DOB building violations · 1

  • Construction other optional

    Work w/o permit during inspection it was notice that renovation of a f amily structure was occuring w/ partitions of wood and related plumbin g and electrical also drop ceiling 4" from existing ceiling remedy:stop all work obtain permit

    Jul 9, 2009

    Dob violation - dismissed

ECB violations · 9

  • Class - 1

    At the time of inspection of a proposed 4 story new building, observed on both stair case a & b missing and not installed handrails. failure to provide and maintain handrails on every staircase temp or final st

    Jul 11, 2023

    Resolve
  • Class - 1

    Time of inspection of a proposed 4 story ew building, observed on every level every room, large accumulations of construction debris. cardboard boxes, cut lumber, plastic, every type of construction debris for

    Jul 11, 2023 · Penalty $625

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction-no handrails.at time of inspection on active job site of 4 story building observed missing handrails at permanent stairs through

    Apr 21, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements.as noted at time of inspection observed tremendous amount of debris scrap of building materials sheetrock,garbage bags throughout entire site c

    Apr 21, 2023 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans/construction documents at jobsite.at time of inspection noted site super was not able to provide inspector with stamped approved dob drawings for mechanical installati

    Dec 15, 2022 · Penalty $1,562

    Resolve
  • Class - 2

    At the time of my inspection of 4 story new building i observed construction fence installed at exposures #1,2,4-uppon checking dob records no permit obtained prior of installation of construction fence

    Oct 27, 2022

    Resolve
  • Class - 1

    Worker on extention ladder between 3rd and 4th floor stair case pulling wire through light plate cut his right index finger taken to urgent care where he received 9 stitches.provide proper equipment to work on

    Jun 13, 2022

    Resolve
  • Class - 2

    Observed poor housekeeping wires, debris , materials and boards through out siteprovide adequate housekeeping

    Jun 13, 2022 · Penalty $625

    Resolve
  • Class - 3

    Failure to maintain bldg/property in code compliance manner.noted: @ time of insp observed approx 10ft of loose & broken chain link fence @ rear yard. broken fence & loose posts leaning into property @ rear yar

    Jun 11, 2018 · Penalty $250

    Resolve

Complaints

  • Water leak

    Damp spot

    Sep 8, 2026 · Apt 3D

    Close
  • General

    Ventilation system

    Sep 8, 2026 · Apt 3D

    Close
  • Plumbing

    Basin/sink

    Sep 8, 2026 · Apt 3D

    Close
  • Appliance

    Electric/gas range

    May 4, 2026 · Apt PH5A

    Close
  • Unsanitary condition

    Mold

    May 4, 2026 · Apt PH5A

    Close
  • Flooring/stairs

    Floor

    May 4, 2026 · Apt PH5A

    Close
  • Plumbing

    Bathtub/shower

    May 4, 2026 · Apt PH5A

    Close
  • Unsanitary condition

    Pests

    May 4, 2026 · Apt PH5A

    Close
  • General

    Cabinet

    May 4, 2026 · Apt PH5A

    Close
  • Paint/plaster

    Wall

    May 4, 2026 · Apt PH5A

    Close
Show 40 more ↓
  • Paint/plaster

    Window/frame

    May 4, 2026 · Apt PH5A

    Close
  • Unsanitary condition

    Pests

    May 4, 2026 · Apt PH5A

    Close
  • Door/window

    Window frame

    May 4, 2026 · Apt PH5A

    Close
  • Plumbing

    Toilet

    Mar 18, 2026 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Mar 18, 2026 · Apt 2B

    Close
  • Electric

    Lighting

    Mar 18, 2026 · Apt 2B

    Close
  • Electric

    Outlet/switch

    Dec 26, 2025 · Apt 3D

    Close
  • Unsanitary condition

    Pests

    Dec 26, 2025 · Apt 3D

    Close
  • Unsanitary condition

    Pests

    Dec 26, 2025 · Apt 3D

    Close
  • Appliance

    Electric/gas range

    Dec 16, 2025 · Apt 5A

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2025 · Apt 5A

    Close
  • Paint/plaster

    Window/frame

    Dec 16, 2025 · Apt 5A

    Close
  • Door/window

    Window frame

    Dec 16, 2025 · Apt 5A

    Close
  • Flooring/stairs

    Floor

    Dec 16, 2025 · Apt 5A

    Close
  • General

    Cabinet

    Dec 16, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Mold

    Dec 16, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Dec 16, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Dec 16, 2025 · Apt 5A

    Close
  • Door/window

    Door

    Oct 8, 2025 · Apt 1D

    Close
  • Plumbing

    Basin/sink

    Oct 8, 2025 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    Oct 8, 2025 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    Oct 8, 2025 · Apt 1D

    Close
  • Unsanitary condition

    Mold

    Oct 8, 2025 · Apt 1D

    Close
  • Electric

    No lighting

    Oct 8, 2025 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    Sep 24, 2025 · Apt 3D

    Close
  • Unsanitary condition

    Pests

    Sep 24, 2025 · Apt 3D

    Close
  • Unsanitary condition

    Mold

    Sep 24, 2025 · Apt 3D

    Close
  • Unsanitary condition

    Mold

    Sep 15, 2025 · Apt 3D

    Close
  • Unsanitary condition

    Pests

    Sep 15, 2025 · Apt 3D

    Close
  • Unsanitary condition

    Pests

    Sep 15, 2025 · Apt 3D

    Close
  • Plumbing

    Water supply

    Jun 25, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jun 10, 2025 · Apt 2D

    Close
  • Water leak

    Heavy flow

    May 5, 2025 · Apt 1D

    Close
  • Unsanitary condition

    Mold

    May 5, 2025 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    Mar 3, 2025 · Apt 3D

    Close
  • Water leak

    Damp spot

    Mar 3, 2025 · Apt 3D

    Close
  • Unsanitary condition

    Pests

    Mar 3, 2025 · Apt 3D

    Close
  • Water leak

    Damp spot

    Mar 3, 2025 · Apt 3D

    Close
  • Unsanitary condition

    Pests

    Mar 3, 2025 · Apt 3D

    Close
  • Electric

    Power outage

    Feb 7, 2025 · Apt 1B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
2021
Floors
4.5
Residential units
17
Building area
14,152 ft²
Lot area
3,583 ft²
Zoning
R7-1
Community board
203
Council district
17
Block / lot
2973 / 52
Assessed value
$971,550
Landmark / historic district
No

HPD registration #228903, last renewed Sep 17, 2025.

Questions about 1300 Rev James Polite Ave

Who owns 1300 Rev James Polite Ave?

The owner of record in NYC Department of City Planning PLUTO data is Ek Polite LLC.

Does 1300 Rev James Polite Ave have violations?

Yes. NYC HPD has recorded 25 housing violations at this property.

Is 1300 Rev James Polite Ave rent stabilized?

NYC Department of Finance tax bills listed 17 rent-stabilized units here in 2024 (about 100% of its 17 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 1300 Rev James Polite Ave built?

City records list 2021 as the year it was built.

How many apartments are in 1300 Rev James Polite Ave?

It has 17 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.