1300 Rev James Polite Ave
Bronx, NY 10459BBL 2-02973-0052Map
Owner of record: Ek Polite LLC
1300 Rev James Polite Ave is a walk-up apartment building built in 2021 in Bronx, 10459. It has 17 residential units across 4.5 floors. The owner of record is Ek Polite LLC. HPD has recorded 25 housing violations here, most recently on May 16, 2026. 2 of the 25 most recent violations are still open. City tax records listed 17 rent-stabilized apartments here in 2024.
- HPD violations
- 25
- DOB violations
- 1
- ECB violations
- 9
- HPD complaints
- 59
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt ph5a, 5th story, 2nd apartment from east at south
May 16, 2026 · Apt PH5A
Closed — Violation dismissed - BHazardous
Refit door at base cabinet at east wall in the kitchen located at apt ph5a, 5th story, 2nd apartment from east at south
May 16, 2026 · Apt PH5A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt ph5a, 5th story, 2nd apartment from east at south
May 16, 2026 · Apt PH5A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3d, 3rd story, 1st apartment from north at east
Nov 16, 2025 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1d, 1st story, 1st apartment from north at east , section ''east''
Nov 2, 2025 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1d, 1st story, 1st apartment from north at east , section ''east''
Nov 2, 2025 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3d, 3rd story
Sep 26, 2025 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 3rd story
Sep 26, 2025 · Apt 3D
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... ..more than 10 sq ft athe ceiling in the bathroom located at apt 3d, 3rd story
Sep 26, 2025 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from north at east
Sep 19, 2025 · Apt 3D
Closed — Violation dismissed
Show 15 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the kitchen located at apt 3d, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 3D
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 3D
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1d, 1st story, 1st apartment from north at east
Feb 10, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective convector unit (hvac) at west wall in the 1st room from east at north located at apt 1d, 1st story, 1st apartment from north at east
Feb 10, 2025 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective convector unit (hvac) at west wall in the 1st room from east at south located at apt 1d, 1st story, 1st apartment from north at east
Feb 10, 2025 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective convector unit (hvac) at east wall in the 2nd room from east at south located at apt 1d, 1st story, 1st apartment from north at east
Feb 10, 2025 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective convector unit (hvac) at east wall in the 3rd room from east located at apt 1d, 1st story, 1st apartment from north at east
Feb 10, 2025 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1d, 1st story, 1st apartment from north at east
Feb 10, 2025 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 2nd apartment from east at south
Dec 7, 2024 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1b, 1st story, 2nd apartment from east at south
Dec 7, 2024 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 7, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective hvac split unit at west wall in the 2nd room from east at south located at apt 1b, 1st story, 2nd apartment from east at south
Dec 7, 2024 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 2nd apartment from south at west , 1st section from south at west
Dec 4, 2024 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 4, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 18, 2024
Closed — Violation dismissed
DOB building violations · 1
- Construction other optional
Work w/o permit during inspection it was notice that renovation of a f amily structure was occuring w/ partitions of wood and related plumbin g and electrical also drop ceiling 4" from existing ceiling remedy:stop all work obtain permit
Jul 9, 2009
Dob violation - dismissed
ECB violations · 9
- Class - 1
At the time of inspection of a proposed 4 story new building, observed on both stair case a & b missing and not installed handrails. failure to provide and maintain handrails on every staircase temp or final st
Jul 11, 2023
Resolve - Class - 1
Time of inspection of a proposed 4 story ew building, observed on every level every room, large accumulations of construction debris. cardboard boxes, cut lumber, plastic, every type of construction debris for
Jul 11, 2023 · Penalty $625
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no handrails.at time of inspection on active job site of 4 story building observed missing handrails at permanent stairs through
Apr 21, 2023 · Penalty $2,500
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.as noted at time of inspection observed tremendous amount of debris scrap of building materials sheetrock,garbage bags throughout entire site c
Apr 21, 2023 · Penalty $2,500
Resolve - Class - 2
Failure to provide approved/accepted plans/construction documents at jobsite.at time of inspection noted site super was not able to provide inspector with stamped approved dob drawings for mechanical installati
Dec 15, 2022 · Penalty $1,562
Resolve - Class - 2
At the time of my inspection of 4 story new building i observed construction fence installed at exposures #1,2,4-uppon checking dob records no permit obtained prior of installation of construction fence
Oct 27, 2022
Resolve - Class - 1
Worker on extention ladder between 3rd and 4th floor stair case pulling wire through light plate cut his right index finger taken to urgent care where he received 9 stitches.provide proper equipment to work on
Jun 13, 2022
Resolve - Class - 2
Observed poor housekeeping wires, debris , materials and boards through out siteprovide adequate housekeeping
Jun 13, 2022 · Penalty $625
Resolve - Class - 3
Failure to maintain bldg/property in code compliance manner.noted: @ time of insp observed approx 10ft of loose & broken chain link fence @ rear yard. broken fence & loose posts leaning into property @ rear yar
Jun 11, 2018 · Penalty $250
Resolve
Complaints
- Water leak
Damp spot
Sep 8, 2026 · Apt 3D
Close - General
Ventilation system
Sep 8, 2026 · Apt 3D
Close - Plumbing
Basin/sink
Sep 8, 2026 · Apt 3D
Close - Appliance
Electric/gas range
May 4, 2026 · Apt PH5A
Close - Unsanitary condition
Mold
May 4, 2026 · Apt PH5A
Close - Flooring/stairs
Floor
May 4, 2026 · Apt PH5A
Close - Plumbing
Bathtub/shower
May 4, 2026 · Apt PH5A
Close - Unsanitary condition
Pests
May 4, 2026 · Apt PH5A
Close - General
Cabinet
May 4, 2026 · Apt PH5A
Close - Paint/plaster
Wall
May 4, 2026 · Apt PH5A
Close
Show 40 more ↓
- Paint/plaster
Window/frame
May 4, 2026 · Apt PH5A
Close - Unsanitary condition
Pests
May 4, 2026 · Apt PH5A
Close - Door/window
Window frame
May 4, 2026 · Apt PH5A
Close - Plumbing
Toilet
Mar 18, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Mar 18, 2026 · Apt 2B
Close - Electric
Lighting
Mar 18, 2026 · Apt 2B
Close - Electric
Outlet/switch
Dec 26, 2025 · Apt 3D
Close - Unsanitary condition
Pests
Dec 26, 2025 · Apt 3D
Close - Unsanitary condition
Pests
Dec 26, 2025 · Apt 3D
Close - Appliance
Electric/gas range
Dec 16, 2025 · Apt 5A
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt 5A
Close - Paint/plaster
Window/frame
Dec 16, 2025 · Apt 5A
Close - Door/window
Window frame
Dec 16, 2025 · Apt 5A
Close - Flooring/stairs
Floor
Dec 16, 2025 · Apt 5A
Close - General
Cabinet
Dec 16, 2025 · Apt 5A
Close - Unsanitary condition
Mold
Dec 16, 2025 · Apt 5A
Close - Unsanitary condition
Pests
Dec 16, 2025 · Apt 5A
Close - Unsanitary condition
Pests
Dec 16, 2025 · Apt 5A
Close - Door/window
Door
Oct 8, 2025 · Apt 1D
Close - Plumbing
Basin/sink
Oct 8, 2025 · Apt 1D
Close - Unsanitary condition
Pests
Oct 8, 2025 · Apt 1D
Close - Unsanitary condition
Pests
Oct 8, 2025 · Apt 1D
Close - Unsanitary condition
Mold
Oct 8, 2025 · Apt 1D
Close - Electric
No lighting
Oct 8, 2025 · Apt 1D
Close - Unsanitary condition
Pests
Sep 24, 2025 · Apt 3D
Close - Unsanitary condition
Pests
Sep 24, 2025 · Apt 3D
Close - Unsanitary condition
Mold
Sep 24, 2025 · Apt 3D
Close - Unsanitary condition
Mold
Sep 15, 2025 · Apt 3D
Close - Unsanitary condition
Pests
Sep 15, 2025 · Apt 3D
Close - Unsanitary condition
Pests
Sep 15, 2025 · Apt 3D
Close - Plumbing
Water supply
Jun 25, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 10, 2025 · Apt 2D
Close - Water leak
Heavy flow
May 5, 2025 · Apt 1D
Close - Unsanitary condition
Mold
May 5, 2025 · Apt 1D
Close - Unsanitary condition
Pests
Mar 3, 2025 · Apt 3D
Close - Water leak
Damp spot
Mar 3, 2025 · Apt 3D
Close - Unsanitary condition
Pests
Mar 3, 2025 · Apt 3D
Close - Water leak
Damp spot
Mar 3, 2025 · Apt 3D
Close - Unsanitary condition
Pests
Mar 3, 2025 · Apt 3D
Close - Electric
Power outage
Feb 7, 2025 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2021
- Floors
- 4.5
- Residential units
- 17
- Building area
- 14,152 ft²
- Lot area
- 3,583 ft²
- Zoning
- R7-1
- Community board
- 203
- Council district
- 17
- Block / lot
- 2973 / 52
- Assessed value
- $971,550
- Landmark / historic district
- No
HPD registration #228903, last renewed Sep 17, 2025.
Questions about 1300 Rev James Polite Ave
Who owns 1300 Rev James Polite Ave?
The owner of record in NYC Department of City Planning PLUTO data is Ek Polite LLC.
Does 1300 Rev James Polite Ave have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 1300 Rev James Polite Ave rent stabilized?
NYC Department of Finance tax bills listed 17 rent-stabilized units here in 2024 (about 100% of its 17 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1300 Rev James Polite Ave built?
City records list 2021 as the year it was built.
How many apartments are in 1300 Rev James Polite Ave?
It has 17 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.