1809 Marmion Avenue
Bronx, NY 10460BBL 2-02953-0048Map
Owner of record: 1809 M LLC
1809 Marmion Avenue is an elevator apartment building built in 1936 in Bronx, 10460. It has 30 residential units across 6 floors. The owner of record is 1809 M LLC. HPD has recorded 293 housing violations here, most recently on October 20, 2026. 6 of the 50 most recent violations are still open. City tax records listed 31 rent-stabilized apartments here in 2024.
- HPD violations
- 293
- DOB violations
- 45
- ECB violations
- 37
- HPD complaints
- 570
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 293
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 65, 6th story, 1st apartment from east at south
Oct 20, 2026 · Apt 65
Open — Notice of issuance sent to tenant - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at .. in the entrance located at apt 65, 6th story, 1st apartment from east at south
Oct 20, 2026 · Apt 65
Open — Nov sent out - ANon-hazardous
Replace with new the missing light fixture cover in the 1st room from north at west located at apt 65, 6th story, 1st apartment from east at south
Oct 20, 2026 · Apt 65
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercom system at west wall in the foyer located at apt 65, 6th story, 1st apartment from east at south
Oct 20, 2026 · Apt 65
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood door at closet in the 1st room from east located at apt 4, 1st story, 1st apartment from north at east , section at south
Apr 19, 2026 · Apt 4
Closed — Violation dismissed - ANon-hazardous
Provide a suitable strainer for the drain at washbasin in the bathroom located at apt 4, 1st story, 1st apartment from north at east , section at south
Apr 19, 2026 · Apt 4
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective knobs at the washbasin in the bathroom located at apt 4, 1st story, 1st apartment from north at east , section at south
Apr 19, 2026 · Apt 4
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective loose ceramic wall tile at west wall at bathtub in the bathroom located at apt 4, 1st story, 1st apartment from north at east , section at south
Apr 19, 2026 · Apt 4
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4, 1st story, 1st apartment from north at east , section at south
Apr 19, 2026 · Apt 4
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood flooring at cabinet at washbasin in the bathroom located at apt 4, 1st story, 1st apartment from north at east , section at south
Apr 19, 2026 · Apt 4
Closed — Violation dismissed
DOB building violations · 45
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 21, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 24, 2018
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed
ECB violations · 37
- Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #907401. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $2,500
Active - Class - 2
Failure to maintain exterior bldg facade & appurances.as noted:bldg have not repaired defects from previous summons #35542110p issued on 04/28/2020.as of 06/28/21 conditions still exists which include spilled b
Jun 11, 2021 · Penalty $620
Resolve - Class - 2
Failure to maitnain building facade/walls and appurtenances.note:at time of inspection observed deflected/bowed steel lintels above windows @ interior of exp#1,behind fire escape above 2nd flr windows towards e
Apr 28, 2021 · Penalty $1,250
Resolve - Class - 1
Failed to repair cracking of the face(stop cracks)at various locationsalong the street facades,brick coating(stucco)deterioration at exp#3/rear facade within time frame recommended by qewi.qewi recommended repa
Apr 28, 2021
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Jan 5, 2015 · Penalty $4,000
Resolve - Class - 2
Failure to file an acceptable 5, 6 & 7 cycles technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules &
May 27, 2014 · Penalty $10,000
Resolve - Class - 2
67x10 - restore emergency communication (phone) in elev. cab to an outside source.
Mar 28, 2013 · Penalty $500
Resolve - Class - 2
Failure to file an acceptable 5th or 6th round technical report in compliance with article 28-302 of the bldg code & dept of bldgs' rules & regulations. 36011981y. respondent has demonstrated a history of non-c
Nov 22, 2011 · Penalty $10,000
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.remed
Apr 15, 2011 · Penalty $8,000
Resolve - Class - 1
Work w/o a permit. partitions erected at basement level to create additional living space; arrangement for 3 pc bathroom observed; tub & toilet installed roughing for sink in place; observed electrical work
Apr 1, 2011
Resolve
Complaints
- Door/window
Door
Oct 19, 2026 · Apt 65
Close - Electric
No lighting
Oct 19, 2026 · Apt 65
Close - General
Bell/buzzer/intercom
Oct 19, 2026 · Apt 65
Close - Heat/hot water
Apartment only
Oct 19, 2026 · Apt 65
Close - Heat/hot water
Entire building
Jul 24, 2026 · Apt 41
Close - Safety
Window guard broken/missing
Jul 10, 2026 · Apt BLDG
Close - Plumbing
Bathtub/shower
Apr 8, 2026 · Apt 41
Close - Flooring/stairs
Floor
Jan 5, 2026 · Apt 4
Close - Door/window
Door
Jan 5, 2026 · Apt 4
Close - Door/window
Door frame
Jan 5, 2026 · Apt 4
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1936
- Floors
- 6
- Residential units
- 30
- Building area
- 30,084 ft²
- Lot area
- 5,474 ft²
- Zoning
- M1-2
- Community board
- 206
- Council district
- 15
- Block / lot
- 2953 / 48
- Assessed value
- $972,000
- Landmark / historic district
- No
HPD registration #206259, last renewed Aug 29, 2026.
Questions about 1809 Marmion Avenue
Who owns 1809 Marmion Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1809 M LLC.
Does 1809 Marmion Avenue have violations?
Yes. NYC HPD has recorded 293 housing violations at this property.
Is 1809 Marmion Avenue rent stabilized?
NYC Department of Finance tax bills listed 31 rent-stabilized units here in 2024 (about 100% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1809 Marmion Avenue built?
City records list 1936 as the year it was built.
How many apartments are in 1809 Marmion Avenue?
It has 30 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.