1810 Crotona Park East
Bronx, NY 10460BBL 2-02940-0036Map
Owner of record: 1810 Crotona Park LLC
1810 Crotona Park East is an elevator apartment building built in 2018 in Bronx, 10460. It has 20 residential units across 6 floors. The owner of record is 1810 Crotona Park LLC. HPD has recorded 26 housing violations here, most recently on March 29, 2026. 10 of the 26 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2024.
- HPD violations
- 26
- DOB violations
- 3
- ECB violations
- 11
- HPD complaints
- 34
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 26
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door to roof at 1st public hall bulkhead from east, 6th story
Mar 29, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing wood wedge at door to staircase at public hall, 1st story
Mar 29, 2026
Open — Nov certified late - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 6d , 6th story, 1st apartment from east at south
Mar 29, 2026 · Apt 6D
Closed — Violation dismissed - BHazardous
Remove the illegal fastening consistance of panic bar installed on the roof door that does not allow reentry from roof to public hall at 6th story public hall bulkhead east 1 at 1st public hall bulkhead from east, 6th story
Mar 29, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch and its assemblies at door to roof at 1st public hall bulkhead from east, 6th story
Mar 29, 2026
Open — Nov sent out - BHazardous
Provide an unlock able slidebolt, lock or a hook that allow reentry from roof to public hall at 1st public hall bulkhead from east, 6th story
Mar 29, 2026
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets shower missing valve at bathtub in the bathroom located at apt 6d , 6th story, 1st apartment from east at south
Mar 29, 2026 · Apt 6D
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6b, 6th story, 1st apartment from north at east
Feb 17, 2024 · Apt 6B
Open — Invalid certification - BHazardous
Repair the roof so that it will not leak over the ceiling in the private hallway located at apt 6b, 6th story, 1st apartment from north at east
Feb 17, 2024 · Apt 6B
Closed — Violation dismissed
Show 16 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 6b, 6th story, 1st apartment from north at east
Feb 17, 2024 · Apt 6B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 6b, 6th story, 1st apartment from north at east
Feb 17, 2024 · Apt 6B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6b, 6th story, 1st apartment from north at east
Feb 17, 2024 · Apt 6B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room locked at boiler room
Feb 17, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective lock and assembley at building entrance door. , 1st story
Jan 26, 2021
Open — Invalid certification - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jan 26, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 26, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 26, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 26, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jan 26, 2021
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jan 26, 2021
Open — Nov certified late - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jan 26, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 26, 2021
Open — Nov sent out
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 10, 2011
Dob violation - dismissed - Construction other optional
Failure to safeguard all persons & property affected by construction o perations. currently a location with intended proposed 6 story bldg i s accessible.no code compliant nor adequate fence exists. hinged gates are duct tape, wire, opening under front gate 2 feet. remedy: stop all work. contact 212 442-1838 safeguard site
Dec 3, 2008
Dob violation - dismissed
ECB violations · 11
- Class - 2
Failure to provide approved/accepted construction documents at job site. during an energy code compliance inspection at new building with job number 2205796391 i observed that there were no approved
Mar 8, 2019 · Penalty $625
Resolve - Class - 1
Work w/o a permit. steel and wood bracing has been erected at adj lots(rubble) retaining wall to the west bracing consists of 9 steel angle braces w/wood at wall. full swo - issued pursuant to 28-207.2 & posted
Oct 15, 2013
Resolve - Class - 2
Job site fence not constructed pursuant to subsection @ stalled job site observed defective pulling away missing sections of site fence @ front of site w/collapsed down sections @ rear/sides of site creating un
Sep 27, 2011
Resolve - Class - 2
Work w/o a permit expired fence permit #210052654 on 08/19/09 noted @ time of inspection @ stalled site observed fence permit is expired on 08/19/2009. rem: renew fence permit as req'd by code.
Sep 27, 2011
Resolve - Class - 2
Job site fence not constructed pursuant to subsection. noted: at time of inspection at stalled job site, observed defective, pulling away, missing sections of site fence at front of site, w/collapsed down
Sep 27, 2011 · Penalty $4,000
Resolve - Class - 2
Work w/o a permit; expired fence permit #210052654 on: 8.19.09. noted:at time of inspection at stalled site observed fence permit is expiredon: 8.19.09. remedy: renew fence permit, as required by code.
Sep 27, 2011 · Penalty $4,000
Resolve - Class - 2
Work with a permit. expired permit. note:at time of inspection observed construction fence erected .erected under application#210052654 issued on 11/13/2008 has expired on 8/19/2009.remedy:renew permit.
Jun 16, 2010 · Penalty $4,000
Resolve - Class - 2
Failure to provide approved/accepted plans at jobsite at time of inspection. noted: nb permit #210052654 only plans on site are 51 thru 59 and these do not show architectural or other elevations required for
Jun 3, 2009 · Penalty $2,500
Resolve - Class - 2
Job site fence (appl #210052654-01-eq-fn) not constructed pursuant to subsection. defects noted: 1) section of fence (approx: 20'l x 8'h) pulling away leaning toward job site and adjacent property at left side
Feb 23, 2009 · Penalty $4,000
Resolve - Class - 2
Sec bc 3307.3.2 & rcny 2704 misc viol: fail to provide a sign w/wording " to anonymously report unsafe conditions at this worksite that endangers workers 311 on nb. currently only a posted permit is visible at
Dec 3, 2008 · Penalty $800
Resolve
Show 1 more ↓
- Class - 2
Sec bc 3307.3.2 misc viol: fail to provide required lot line const fence. currently permits have been secured since 11/13/08 for noted proposed 6 story masonry bldg. however only an 8'x 16'l section of solid pa
Dec 3, 2008 · Penalty $800
Resolve
Complaints
- Plumbing
Water supply
Jun 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 17, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 3, 2026 · Apt 6C
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt 6D
Close - Heat/hot water
Apartment only
Feb 3, 2026 · Apt 5D
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 2, 2026 · Apt 5B
Close
Show 24 more ↓
- Heat/hot water
Entire building
Jan 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Oct 11, 2025 · Apt 5D
Close - Paint/plaster
Wall
Oct 11, 2025 · Apt 5D
Close - Appliance
Electric/gas range
Oct 11, 2025 · Apt 5D
Close - Heat/hot water
Apartment only
Dec 24, 2024 · Apt 5D
Close - Heat/hot water
Entire building
Dec 23, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 30, 2024 · Apt 2A
Close - Plumbing
Water supply
Mar 4, 2024 · Apt 3B
Close - Heat/hot water
Entire building
Mar 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 16, 2024 · Apt 6B
Close - Plumbing
Bathtub/shower
Feb 16, 2024 · Apt 6B
Close - Heat/hot water
Apartment only
Feb 13, 2024 · Apt 2C
Close - Plumbing
Basin/sink
Jan 23, 2024 · Apt 5D
Close - Heat/hot water
Apartment only
Nov 25, 2023 · Apt 3C
Close - Heat/hot water
Apartment only
Jan 4, 2022 · Apt 6C
Close - Heat/hot water
Apartment only
Jan 4, 2022 · Apt 6C
Close - Heat/hot water
Apartment only
Dec 23, 2021 · Apt 6C
Close - Heat/hot water
Entire building
Nov 19, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 19, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 24, 2021 · Apt 5B
Close - Unsanitary condition
Pests
Jan 13, 2021 · Apt 3E
Close - Heat/hot water
Apartment only
Nov 2, 2019 · Apt 5D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2018
- Floors
- 6
- Residential units
- 20
- Building area
- 16,820 ft²
- Lot area
- 5,000 ft²
- Zoning
- R7-1
- Community board
- 203
- Council district
- 15
- Block / lot
- 2940 / 36
- Assessed value
- $956,700
- Landmark / historic district
- No
HPD registration #228134, last renewed Aug 12, 2025.
Questions about 1810 Crotona Park East
Who owns 1810 Crotona Park East?
The owner of record in NYC Department of City Planning PLUTO data is 1810 Crotona Park LLC.
Does 1810 Crotona Park East have violations?
Yes. NYC HPD has recorded 26 housing violations at this property.
Is 1810 Crotona Park East rent stabilized?
NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2024 (about 100% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1810 Crotona Park East built?
City records list 2018 as the year it was built.
How many apartments are in 1810 Crotona Park East?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.