1425 Plaza Drive
Bronx, NY 10452BBL 2-02857-0081Map
Owner of record: 1441 Macombs Realtycorp
1425 Plaza Drive is a walk-up apartment building built in 1927 in Bronx, 10452. It has 35 residential units across 5 floors. The owner of record is 1441 Macombs Realtycorp. HPD has recorded 85 housing violations here, most recently on June 10, 2026. 20 of the 50 most recent violations are still open. City tax records listed 38 rent-stabilized apartments here in 2024.
- HPD violations
- 85
- DOB violations
- 12
- ECB violations
- 4
- HPD complaints
- 83
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 85
- BHazardous
Properly repair with similar material the broken or defective brink and mortar joints at lentel above building entrance door , 1st story
Jun 10, 2026
Open — Nov sent out - BHazardous
Make safe by properly repairing the structural defect vertical crack from 4th story to parapet wall at east exterior wall (at northeast corner south section)
Jun 10, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective brick and mortar joints from 5th story to parapet wall at east exteriorwall(southeast corner north section)
Jun 10, 2026
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Open — Nov certified late - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Open — Invalid certification - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Open — Notice of issuance sent to tenant
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall, north wall in the 2nd room from north located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Open — Nov certified late - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from east at south wall door in the foyer located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Open — Nov certified late - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 squarw feet at west wall in the bathroom located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, north wall in the bathroom located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Open — Nov certified late - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from north at east located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 2nd room from north located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame in the foyer located at apt 2d, 2nd story, 1st apartment from west at north , section ''1425'', 1st from west at north
Jul 5, 2024 · Apt 2D
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 5c, 5th story, 2nd apartment from west at north , section at south
Feb 9, 2024 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the private hallway located at apt 5c, 5th story, 2nd apartment from west at north , section at south
Feb 9, 2024 · Apt 5C
Open — Invalid certification - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5c, 5th story, 2nd apartment from west at north , section at south
Feb 9, 2024 · Apt 5C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the private hallway located at apt 5c, 5th story, 2nd apartment from west at north , section at south
Feb 9, 2024 · Apt 5C
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at east wall approx 2 sq.ft at north wall approx 2 sq.ft at ceiling approx 2 sq.ft in the bathroom located at apt 5c, 5th story, 2nd apartment from west at north , section at south
Feb 9, 2024 · Apt 5C
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at east wall approx 2 sq.ft at north wall approx 2 sq.ft at ceiling approx 2 sq.ft in the bathroom located at apt 5c, 5th story, 2nd apartment from west at north , section at south original violation 16662980 issued 09-feb-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Feb 9, 2024 · Apt 5C
Open — Violation will be reinspected - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 5c, 5th story, 2nd apartment from west at north , section at south
Feb 9, 2024 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at intermediate landing at public hall stairs, 3rd story, section ''south''
Jan 2, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at intermediate landing at public hall stairs, 3rd story, section ''south''
Jan 2, 2024
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from east at north located at apt 5c, 5th story, 2nd apartment from west at north , section ''south''
Jan 2, 2024 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5c, 5th story, 2nd apartment from west at north , section ''south''
Jan 2, 2024 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 5c, 5th story, 2nd apartment from west at north , section ''south''
Jan 2, 2024 · Apt 5C
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 2 sqft at ceiling and 1 sqft at east wall in the bathroom located at apt 5c, 5th story, 2nd apartment from west at north , section ''south''
Jan 2, 2024 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the private hallway located at apt 5c, 5th story, 2nd apartment from west at north , section ''south''
Jan 2, 2024 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the private hallway located at apt 5c, 5th story, 2nd apartment from west at north , section ''south''
Jan 2, 2024 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt 5c, 5th story, 2nd apartment from west at north
Dec 9, 2023 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective bathtub with porcelain enamel reglaze in the bathroom located at apt 5c, 5th story, 2nd apartment from south at west
Dec 8, 2023 · Apt 5C
Open — Invalid certification - BHazardous
Repair the roof so that it will not leak at ceiling in the private hallway located at apt 5c, 5th story, 2nd apartment from south at west
Dec 8, 2023 · Apt 5C
Open — Invalid certification - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 5c, 5th story, 2nd apartment from south at west
Dec 8, 2023 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 5c, 5th story, 2nd apartment from north at east , section at south
Jun 26, 2022 · Apt 5C
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the private hallway located at apt 5c, 5th story, 2nd apartment from north at east , section at south
Jun 26, 2022 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance of lower sash window in the kitchen located at apt 5c, 5th story, 2nd apartment from north at east , section at south
Jun 26, 2022 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5c, 5th story, 2nd apartment from north at east , section at south
Jun 26, 2022 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 5c, 5th story, 2nd apartment from north at east , section at south
Jun 26, 2022 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5c, 5th story, 2nd apartment from north at east , section at south
Jun 26, 2022 · Apt 5C
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 2c, 2nd story, 2nd apartment from north at east
Jun 26, 2022 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly secure the loose sink to wall in the bathroom located at apt 2c, 2nd story, 2nd apartment from north at east
Jun 26, 2022 · Apt 2C
Closed — Violation dismissed - BHazardous
Replace with new the missing basebaord at north wall in the 1st room from north at west located at apt 2c, 2nd story, 2nd apartment from north at east
Jun 26, 2022 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north at west located at apt 2c, 2nd story, 2nd apartment from north at east
Jun 26, 2022 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling approx 9 sq ft in the bathroom located at apt 2c, 2nd story, 2nd apartment from north at east
Jun 26, 2022 · Apt 2C
Closed — Violation dismissed
DOB building violations · 12
- Construction other optional
Requesting a structural stability report for vertical and step cracks at exposure 1 extending from the 4th story to the parapet wall on the north and south sections. also observed horizontal and step cracks at the inner court north section extending from the 5th story through the parapet wall.
Jun 11, 2026
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 16, 2021
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed
Show 2 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 1
Failure to maintain exterior facade. at time of inspection, vertical and step cracks observed at exposure 1 extending from the 4th story up to the parapet wall on both the north and south sections. additionally
Jun 11, 2026 · Penalty $2,500
Resolve - Class - 3
Work without a permit .ntd at 1st fl grocery deli stre nrth est crnr of bldg a mezz lvl was erected wood frame & sheet rck @ rear -nght crnrof stre space approx area 10'x8 mezz does not have required head room
Oct 16, 2009
Resolve - Class - 3
Occupancy contrary to that allowed by the c of o or building department records. c of o #205 dated 10/20/40 shows 5 stores at 1st flr. at present there are 3 stores. remedy: discontinue illegal use and/or amend
Mar 16, 2009 · Penalty $200
Resolve - Hazardous
Work without a permit./haz work noted-exhaust ouct-low temp cnimney terminates approx 8' above court yard at primary egress to multiple dwelling contrary to rs13-2-3.4.3. exhaust discuance on to egress travel p
Jul 20, 2000 · Penalty $1,300
Resolve
Complaints
- Electric
Outlet/switch
Jul 20, 2026 · Apt 2D
Close - Water leak
Heavy flow
May 24, 2026 · Apt 5C
Close - Unsanitary condition
Pests
Apr 23, 2026 · Apt 2D
Close - General
Cabinet
Apr 23, 2026 · Apt 2D
Close - Plumbing
Basin/sink
Apr 23, 2026 · Apt 2D
Close - Heat/hot water
Entire building
Dec 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2025 · Apt 3D
Close - Unsanitary condition
Mold
Sep 11, 2025 · Apt 2E
Close - Paint/plaster
Ceiling
Sep 11, 2025 · Apt 2E
Close - Water leak
Slow leak
Sep 11, 2025 · Apt 2E
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Sep 11, 2025 · Apt 2E
Close - General
Cabinet
Sep 11, 2025 · Apt 2E
Close - Paint/plaster
Wall
Sep 11, 2025 · Apt 2E
Close - Plumbing
Bathtub/shower
Sep 11, 2025 · Apt 2E
Close - Heat/hot water
Apartment only
Sep 24, 2024 · Apt 3B
Close - Water leak
Heavy flow
Sep 24, 2024 · Apt 3B
Close - Appliance
Refrigerator
Sep 24, 2024 · Apt 3B
Close - Unsanitary condition
Sewage
Jun 28, 2024 · Apt 2D
Close - Water leak
Damp spot
Jun 28, 2024 · Apt 2D
Close - Unsanitary condition
Pests
Jun 28, 2024 · Apt 2D
Close - Water leak
Heavy flow
Jan 10, 2024 · Apt 5C
Close - Unsanitary condition
Mold
Jan 10, 2024 · Apt 5C
Close - Paint/plaster
Ceiling
Jan 10, 2024 · Apt 5C
Close - Water leak
Heavy flow
Jan 4, 2024 · Apt 5C
Close - Unsanitary condition
Mold
Jan 4, 2024 · Apt 5C
Close - Paint/plaster
Ceiling
Jan 4, 2024 · Apt 5C
Close - Water leak
Heavy flow
Dec 31, 2023 · Apt 5C
Close - Paint/plaster
Ceiling
Dec 31, 2023 · Apt 5C
Close - Unsanitary condition
Mold
Dec 31, 2023 · Apt 5C
Close - Paint/plaster
Ceiling
Dec 8, 2023 · Apt 5C
Close - Water leak
Heavy flow
Dec 8, 2023 · Apt 5C
Close - Paint/plaster
Ceiling
Dec 4, 2023 · Apt 5C
Close - Water leak
Heavy flow
Dec 4, 2023 · Apt 5C
Close - Water leak
Damp spot
Nov 15, 2023 · Apt 5C
Close - Paint/plaster
Ceiling
Nov 15, 2023 · Apt 5C
Close - Water leak
Heavy flow
Sep 30, 2023 · Apt 5C
Close - Paint/plaster
Wall
Sep 30, 2023 · Apt 5C
Close - Water leak
Heavy flow
Mar 11, 2023 · Apt 5C
Close - Paint/plaster
Ceiling
Mar 11, 2023 · Apt 5C
Close - Unsanitary condition
Mold
Jun 24, 2022 · Apt 2C
Close - Flooring/stairs
Floor
Jun 24, 2022 · Apt 2C
Close - General
Cabinet
Jun 24, 2022 · Apt 2C
Close - Plumbing
Basin/sink
Jun 24, 2022 · Apt 2C
Close - Flooring/stairs
Floor
Jun 24, 2022 · Apt 2C
Close - Water leak
Heavy flow
May 7, 2022 · Apt 5C
Close - Heat/hot water
Entire building
Dec 21, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 1, 2021 · Apt 2D
Close - Water leak
Heavy flow
Jan 2, 2021 · Apt 5C
Close - Water leak
Heavy flow
Sep 4, 2019 · Apt 1H
Close - Unsanitary condition
Pests
Aug 16, 2019 · Apt 3G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1927
- Floors
- 5
- Residential units
- 35
- Building area
- 37,700 ft²
- Lot area
- 9,017 ft²
- Zoning
- R8A
- Community board
- 204
- Council district
- 16
- Block / lot
- 2857 / 81
- Assessed value
- $722,250
- Landmark / historic district
- No
HPD registration #205300, last renewed Aug 27, 2025.
Questions about 1425 Plaza Drive
Who owns 1425 Plaza Drive?
The owner of record in NYC Department of City Planning PLUTO data is 1441 Macombs Realtycorp.
Does 1425 Plaza Drive have violations?
Yes. NYC HPD has recorded 85 housing violations at this property.
Is 1425 Plaza Drive rent stabilized?
NYC Department of Finance tax bills listed 38 rent-stabilized units here in 2024 (about 100% of its 35 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1425 Plaza Drive built?
City records list 1927 as the year it was built.
How many apartments are in 1425 Plaza Drive?
It has 35 residential units and 39 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.