121 East Clarke Place
Bronx, NY 10452BBL 2-02840-0088Map
Owner of record: Clarke-Walton LLC
121 East Clarke Place is an elevator apartment building built in 1927 in Bronx, 10452. It has 48 residential units across 6 floors. The owner of record is Clarke-Walton LLC. HPD has recorded 532 housing violations here, most recently on July 27, 2026. 30 of the 50 most recent violations are still open. City tax records listed 48 rent-stabilized apartments here in 2024.
- HPD violations
- 532
- DOB violations
- 38
- ECB violations
- 22
- HPD complaints
- 623
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 532
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at roof east bulkhead door at 6th story
Jul 27, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at roof east bulkhead door at 6th story
Jul 27, 2026
Open — Nov certified on time - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 6h, 6th story, 1st apartment from east at south , section ''west ''
Jul 27, 2026 · Apt 6H
Open — Nov certified on time - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet flapper in the bathroom located at apt 6h, 6th story, 1st apartment from east at south , section ''west ''
Jul 27, 2026 · Apt 6H
Open — Civ14 mailed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jul 13, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at south exterior wall at 2nd fire escape from east, 6th story
Jul 13, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the 3rd room from north at east located at apt 2g, 2nd story, 1st apartment from south at west
Feb 4, 2026 · Apt 2G
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Feb 4, 2026
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 3rd room from north at east located at apt 2g, 2nd story, 1st apartment from south at west
Feb 4, 2026 · Apt 2G
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door from street to public hall at public hall, 1st story
Feb 1, 2026
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door at public hall, 2nd story
Feb 1, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set and its assembly at building entrance door from street to public hall at public hall, 1st story
Feb 1, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 5d, 5th story, 1st apartment from west at north , section at east
Jan 28, 2026 · Apt 5D
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5d, 5th story, 1st apartment from west at north , section at east
Jan 28, 2026 · Apt 5D
Open — False certification - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5d, 5th story, 1st apartment from west at north , section at east
Jan 28, 2026 · Apt 5D
Open — False certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective first fire door from west at public hall, 5th story
Jan 28, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles and soap holder cracked at north wall in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south
Jan 1, 2026 · Apt 5A
Open — Nov sent out - ANon-hazardous
Properly secure the loose escutcheon plate at top of riser pipe at west wall in the 2nd room from north located at apt 5a, 5th story, 2nd apartment from east at south
Jan 1, 2026 · Apt 5A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 5d, 5th story, 1st apartment from west at north
Jan 1, 2026 · Apt 5D
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6h, 6th story, 1st apartment from east at south , section ''west''
Nov 16, 2025 · Apt 6H
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6h, 6th story, 1st apartment from east at south , section ''west''
Nov 16, 2025 · Apt 6H
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Nov 16, 2025
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6h, 6th story, 1st apartment from north at east , section ''west''
Oct 31, 2025 · Apt 6H
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked. at boiler room
Oct 31, 2025
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at fire door at public hall, 3rd story
Sep 28, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Sep 20, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the kitchen located at apt 4f, 4th story
Aug 11, 2025 · Apt 4F
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4f, 4th story
Aug 11, 2025 · Apt 4F
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4f, 4th story
Aug 11, 2025 · Apt 4F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the bathroom located at apt 4f, 4th story, 2nd apartment from south at west , section ''west''
Aug 11, 2025 · Apt 4F
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2a, 2nd story, 2nd apartment from east at south
Jul 6, 2025 · Apt 2A
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the kitchen located at apt 2a, 2nd story, 2nd apartment from east at south
Jul 6, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Fire escape defective. replace with new the broken, defective and/or missing loose front fascia plate at 5th story balcony 1st fire escape from west on south exterior (building front)
Jul 6, 2025
Open — Not complied with - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2a, 2nd story, 2nd apartment from east at south
Jul 6, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the bathroom located at apt 4f, 4th story, 2nd apartment from south at west , section ''west''
Jun 11, 2025 · Apt 4F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroom located at apt 4f, 4th story, 2nd apartment from south at west , section ''west''
Jun 11, 2025 · Apt 4F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 4f, 4th story, 2nd apartment from south at west , section ''west''
Jun 11, 2025 · Apt 4F
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 4f, 4th story, 2nd apartment from south at west , section ''west''
Jun 11, 2025 · Apt 4F
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the 1st room from north located at apt 4f, 4th story, 2nd apartment from south at west , section ''west''
Jun 11, 2025 · Apt 4F
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st room from north located at apt 4f, 4th story, 2nd apartment from south at west , section ''west''
Jun 11, 2025 · Apt 4F
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 4f, 4th story, 2nd apartment from south at west , section ''west''
Jun 11, 2025 · Apt 4F
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 4f, 4th story, 2nd apartment from south at west , section ''west''
Jun 11, 2025 · Apt 4F
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at apt 4f, 4th story, 2nd apartment from south at west , section ''west''
Jun 11, 2025 · Apt 4F
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective bell and buzzer return system from building entrance to west wall in the private hallway located at apt 2a, 2nd story, 2nd apartment from east at south , section ''east''
Mar 30, 2025 · Apt 2A
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north at east located at apt 2a, 2nd story, 2nd apartment from east at south , section ''east''
Mar 30, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical outlets at north wall in the 3rd room from north located at apt 2a, 2nd story, 2nd apartment from east at south , section ''east''
Mar 30, 2025 · Apt 2A
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and south wall in the kitchen located at apt 2a, 2nd story, 2nd apartment from east at south , section ''east''
Mar 30, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2a, 2nd story, 2nd apartment from east at south , section ''east''
Mar 30, 2025 · Apt 2A
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2a, 2nd story, 2nd apartment from east at south , section ''east''
Mar 30, 2025 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation steam riser at east wall in the bathroom located at apt 2a, 2nd story, 2nd apartment from east at south , section ''east''
Mar 30, 2025 · Apt 2A
Closed — Violation closed
DOB building violations · 38
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 3, 2019
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 18, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2015
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed
Show 28 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2013
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 8, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 22, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 24, 2004
Dob violation - resolved - Elevator elevatorrequired
2p414
Apr 22, 2003
Dob violation - resolved - Elevator elevatorrequired
2p414
Feb 12, 2001
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 28, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 25, 1993
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
1
Apr 7, 1992
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 25, 1991
Dob violation - dismissed - Elevator elevatorrequired
51-remove nosie for gov 52-replace missing splice box covers necessary 53-renew car floor covering 54-make interlocks self closing & self latching 55-remove water out of pit
Feb 3, 1989
Dob violation - resolved - Elevator elevatorrequired
(51)repair main floor interlock so door cannot be opened with car away from landing. cease use of elev. for until item. #51 is complied with
Jul 19, 1988
Dob violation - resolved
ECB violations · 22
- Class - 2
Failure to comply with commissioner's order contained in summons #39092522l issued on 08/15/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Jan 29, 2025 · Penalty $1,250
Active - Class - 2
Failure to comply with commissioner's order contained in summons#39060061l issued on 4/12/2022,and failure to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptablen certific
Aug 26, 2024 · Penalty $3,125
Resolve - Class - 2
Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #907816. remedy: submit acceptable requ
Apr 11, 2024 · Penalty $1,250
Active - Class - 2
Found to have corroded manhole, discharge pipe missing on back flow preventer, sight glass missing on rear chamber door, smoke alarm on breeching defective, boiler room door not fire rated, water leaking from a
Aug 15, 2023 · Penalty $625
Active - Class - 2
Corrosion on hot water piping from boiler coil and after mixing valve-no cleanout at chimney base-hot water piping from mixing valve uncapped-oil stored in boiler room-dawgs missing and one bolt at front tube d
Apr 12, 2022 · Penalty $625
Active - Class - 2
Failure to maintain building in code-compliant manner. at time of inspection, observed, excessive construction debris at living room of 1b apartment at 1st floor level., repair and/or replace
Mar 22, 2021
Resolve - Class - 1
Class 1- no door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application,insta
Jan 30, 2020 · Penalty $3,125
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical exmination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #807816.submit required technical report
Oct 15, 2018 · Penalty $1,250
Resolve - Class - 1
05a10;70o02;70z04;35i11;10h11;05j01;32h11;68b07;58y02. 05a10-cease use item door zone restrictor has been tampered with/disabled and rendered inoperative. this is a safety device to ensure elevator passenge
Oct 10, 2018 · Penalty $1,250
Resolve - Class - 2
71m07,68b07,59m07. 71m07-provide pit light; 68b07-provide updated logbook; 59m07-provide 1 year brake test tag.
Apr 4, 2016 · Penalty $1,250
Resolve
Show 12 more ↓
- Class - 2
12q03/ 45q03/ 56y13/ 67x10/ 45-q-03 install guard on governor 67-x-10 repair communication in car ( telephone)
Jun 13, 2014 · Penalty $500
Resolve - Class - 1
28-116.4.1 16r11 97r07 97r-operating device w/o a cert of compliance no report of insp submitted to dob & no witnessing of test by dob rem: contact to schedule test appointment to obtain cert of compliance unde
May 15, 2012 · Penalty $1,600
Resolve - Class - 2
37t07 39o02 ma11 56y13 67m07 70z02 72m07 76m07 77q03 37t-provide sign for overhead sheave room door ma11-replace partition btwn motor room & shaftway 67m-provide communication in car telephone 68b-provide upda
May 15, 2012 · Penalty $250
Resolve - Non-hazardous
43h10,60t07,59q03,66o02,66z09,71q03. 60t07 provide company sticker formain line sw. 71q03 install guard for light under car.
Oct 30, 2007 · Penalty $180
Resolve - Hazardous
Failure to maintain exterior bldg. south elevation shows blocks of wood,bricks & metal cans under a/c units;flower pots on the landing of fire escape. remedy:make area safe,remove all blocks of wood,bricks
May 4, 2006 · Penalty $800
Resolve - Non-hazardous
55y10 66y02 58f10 36f10 #58 remove noise from brake #36 remove noise from over head shieve.
Jun 20, 2003 · Penalty $180
Resolve - Non-hazardous
57z9-33w6-33i11-33m7-30i11-21x11. 57-install pump as per code 33-door 33-walls 33-light 30-wall.
Aug 28, 2002
Resolve - Non-hazardous
57z9/ 33w6/ 33i11/ 33m7/ 30i11/ 21x11/ 57 install pump as per code 33 door 33 wall 33 light 30 wall
Aug 28, 2002
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certifying to the installation of required fire protection systems remedy:file report.
Jul 20, 2000 · Penalty $400
Resolve - Non-hazardous
Failure to provide elevator landing sign for elevator bank on floor 2 to 6 failure to provide 3-inch high aplhabetic letter of identification for elevator band and for open stair(two) on floor 1 to 6. failure
Jul 20, 2000 · Penalty $1,200
Resolve - Non-hazardous
14m,17b,35p,40b,57z,74o,74i, (17) provide approved type vision panel guards (35) provide access to motor room (40) remove noise from governor (57) remove water from pit (74) clean car top (74) replace broken c.
Jan 5, 1994 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain defect is: due to fire the dameages were encurrecdinterior partition burned window broken. remedy: repair woods floor beam and interior partition as safe and lawful condition.
Feb 27, 1989 · Penalty $250
Resolve
Complaints
- Paint/plaster
Radiator
Jul 21, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Jul 21, 2026 · Apt 3B
Close - Plumbing
Water supply
Jul 9, 2026 · Apt 1A
Close - Plumbing
Basin/sink
Jun 11, 2026 · Apt 2A
Open - Plumbing
Bathtub/shower
Jun 11, 2026 · Apt 2A
Open - Heat/hot water
Apartment only
Mar 4, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt 2G
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt 1H
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 30, 2026 · Apt 1H
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 2A
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 5D
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 2A
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 20, 2026 · Apt 2A
Close - General
Bell/buzzer/intercom
Jan 16, 2026 · Apt 2A
Open - Electric
Outlet/switch
Jan 16, 2026 · Apt 2A
Open - Heat/hot water
Apartment only
Jan 16, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Jan 13, 2026 · Apt 2G
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt 4H
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt 3F
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt 5D
Close - Flooring/stairs
Floor
Dec 30, 2025 · Apt 5D
Close - Flooring/stairs
Floor
Dec 30, 2025 · Apt 5D
Close - Plumbing
Basin/sink
Dec 30, 2025 · Apt 5D
Close - Heat/hot water
Apartment only
Dec 30, 2025 · Apt 5D
Close - Heat/hot water
Entire building
Dec 26, 2025 · Apt 3F
Close - Heat/hot water
Apartment only
Dec 22, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Dec 22, 2025 · Apt 3F
Close - Heat/hot water
Entire building
Dec 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 17, 2025 · Apt 5C
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 17, 2025 · Apt 5D
Close - General
Bell/buzzer/intercom
Dec 15, 2025 · Apt 2A
Open - Electric
Outlet/switch
Dec 15, 2025 · Apt 2A
Open - Heat/hot water
Entire building
Dec 15, 2025 · Apt 2A
Open - Heat/hot water
Apartment only
Dec 14, 2025 · Apt 5C
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Dec 13, 2025 · Apt 5C
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 6, 2025 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1927
- Floors
- 6
- Residential units
- 48
- Building area
- 44,634 ft²
- Lot area
- 10,291 ft²
- Zoning
- R8
- Community board
- 204
- Council district
- 16
- Block / lot
- 2840 / 88
- Assessed value
- $664,200
- Landmark / historic district
- No
HPD registration #206224, last renewed Oct 8, 2025.
Questions about 121 East Clarke Place
Who owns 121 East Clarke Place?
The owner of record in NYC Department of City Planning PLUTO data is Clarke-Walton LLC.
Does 121 East Clarke Place have violations?
Yes. NYC HPD has recorded 532 housing violations at this property.
Is 121 East Clarke Place rent stabilized?
NYC Department of Finance tax bills listed 48 rent-stabilized units here in 2024 (about 100% of its 48 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 121 East Clarke Place built?
City records list 1927 as the year it was built.
How many apartments are in 121 East Clarke Place?
It has 48 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.