667 Casanova Street
Bronx, NY 10474BBL 2-02765-0079Map
Owner of record: Hunts Point Hsng Devfun
667 Casanova Street is a walk-up apartment building built in 1920 in Bronx, 10474. It has 84 residential units across 5 floors. The owner of record is Hunts Point Hsng Devfun. HPD has recorded 237 housing violations here, most recently on April 16, 2026. 26 of the 50 most recent violations are still open. City tax records listed 69 rent-stabilized apartments here in 2024.
- HPD violations
- 237
- DOB violations
- 23
- ECB violations
- 6
- HPD complaints
- 577
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 237
- CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the private hallway located at apt 2b, 2nd story, 1st apartment from east at south
Apr 16, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing located at apt 2b, 2nd story, 1st apartment from east at south
Apr 13, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing located at apt 2b, 2nd story, 1st apartment from east at south
Apr 13, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Apr 13, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective ( if on wall must be 4'' to 12'' from ceiling- if on ceiling must be 4'' from wall ) in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east , section ''south''
Apr 7, 2026 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective ( if on wall must be 4'' to 12'' from ceiling- if on ceiling must be 4'' from wall ) in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east , section ''south''
Apr 7, 2026 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective rubber gasket in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east , section ''south''
Apr 7, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective air vent at ceilng in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east , section ''south''
Apr 7, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective water diver cartridge for faucet in bathtub, single vavle, in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east , section ''south''
Apr 7, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in drain pipe of the bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east , section ''south''
Apr 7, 2026 · Apt 3A
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at east and north walls in the 2nd room from north located at apt 3a, 3rd story, 1st apartment from north at east , section ''south''
Apr 7, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective lifting wooden floors and subfloors in the foyer located at apt 3a, 3rd story, 1st apartment from north at east , section ''south''
Apr 7, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wioden subfloors parka floors in the 3rd room from north located at apt 3a, 3rd story, 1st apartment from north at east , section ''south''
Apr 7, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch and assembly's at hopper door at compactor closet, 3rd story, section ''south''
Apr 6, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective open brick and mortar joints at 5th story window at 2nd court from north west exterior wall , section ''south''
Apr 6, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hopper door(latch) at compactor closet, 3rd story, section ''south''
Apr 6, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 2nd room from east located at apt 5e, 5th story, 1st apartment from west at north , section at south
Apr 2, 2026 · Apt 5E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance lower sash at fire escape window in the kitchen located at apt 4b, 4th story, 1st apartment from east at south , section at south
Mar 27, 2026 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from east at south , section at south
Mar 27, 2026 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance lower sash 1st window from north at east wall in the 1st room from east at south located at apt 1c, 1st story, 2nd apartment from east at south , section at south
Mar 27, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at east wall in the 1st bathroom from east located at apt 5f, 5th story, 1st apartment from north at east , section at north
Mar 27, 2026 · Apt 5F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from east at south , section at south
Mar 27, 2026 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Dec 21, 2025 · Apt 3B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Dec 21, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective (defective latch of the lock ) on the door to east yard at public hall, 1st story
Dec 21, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Dec 21, 2025 · Apt 3B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt be, 1st story, 1st apartment from east at south
Dec 12, 2025 · Apt BE
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 12, 2025
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective off line (baseboard closer) at west wall in the 3rd room from east located at apt be, 1st apartment from east at south
Dec 3, 2025 · Apt BE
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective off line (baseboard closer) at south wall in the 3rd room from east located at apt be, 1st apartment from east at south
Dec 3, 2025 · Apt BE
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective concrete flashing at 5th story south exterior wall
May 24, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cracked and missing ceramic floor tiles in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Nov 27, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulking around tiles at east wall and south wall in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Nov 27, 2024 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Nov 27, 2024 · Apt 3A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective concrete flashing at 5th story to 3rd story at south exterior wall
Aug 18, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective (hinge) hopper door at south wall 3rd story at public hall, section ''665''
Aug 18, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [hinge] door to laundry room at door from street to basement at public hall
Aug 18, 2024
Closed — Violation closed - BHazardous
Provide adequate lighting at ceiling at fire passage way, section ''south''
Aug 18, 2024
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective (hinge) hopper door at south wall 2nd story at public hall, section ''665''
Aug 18, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective calking around bathtub in the bathroom located at apt 5b, 5th story, 1st apartment from east at south , section ''665''
Aug 18, 2024 · Apt 5B
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from east at south , section at south
May 23, 2024 · Apt 4B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from east at south , section at south
May 23, 2024 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at bsmt-apt bd
May 23, 2024 · Apt BD
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at bsmt-apt bd
May 23, 2024 · Apt BD
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance door hinge at public hall, 1st story
May 23, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5h, 5th story, 1st apartment from east at south
May 23, 2024 · Apt 5H
Open — Defect letter issued - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door leading to room with fire escape window in the 1st room from east at south located at apt 5f, 5th story, 1st apartment from north at east
May 23, 2024 · Apt 5F
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Jan 19, 2024 · Apt 3A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Jan 19, 2024 · Apt 3A
Open — Notice of issuance sent to tenant
DOB building violations · 23
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
Show 13 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 6
- Class - 1
Failure to maintain building in code-compliant manner for summons 39084347n. observed exposures 2 and 3 (rear courtyard) missing/damaged stucco and bricks. the rear fire-escape landing has household items. the
Mar 11, 2026 · Penalty $25,000
Active - Class - 2
Dob permit# x00582278 to repair retaining wall at exposure#3 was issued on 12/14/2021 and expired on 12/14/2022. as of 07/06/2023 the construction appears not completed. no final inspection has been conducted o
Jul 6, 2023 · Penalty $6,250
Active - Class - 1
Failure to maintain building in code compliant manner. at time of inspection observed at exposures 2/3 (rear court yard) masonry brick work in disrepair where sections have detached and fallen. area used by ten
Apr 21, 2023 · Penalty $6,250
Active - Class - 2
32a 32b 50abcde 50a-rating plate missing on boilers 50b-covers missing on controls 50c-spill switches missing 50d-valve leaking water 50e-exposed wires 8-modular hydrotherms
Apr 21, 2012 · Penalty $250
Resolve - Class - 2
32ab 50abcde 50a-rating plae missing on boilers 50b-covers missing on controls 50c-spill switches missing 50d-valve leaking water 8-modular hydotherm boilers
Apr 21, 2012 · Penalty $250
Resolve - Class - 3
Failure to maintain bldg wall(s) or appurtenances. noted: at exp 2 of md a hairline crack (vertical) running from 3rd fl through roof. remedy: maintain exterior bldg wall
Aug 17, 2011 · Penalty $200
Resolve
Complaints
- Plumbing
Water supply
Aug 4, 2026 · Apt 3D
Close - Plumbing
Water supply
Aug 4, 2026 · Apt BLDG
Close - Door/window
Door frame
Jul 2, 2026 · Apt 2F
Close - Door/window
Door
Jul 2, 2026 · Apt 2F
Close - Door/window
Door
Jul 2, 2026 · Apt 2F
Close - Door/window
Window frame
Jul 2, 2026 · Apt 2F
Close - Unsanitary condition
Pests
Jul 2, 2026 · Apt 2F
Close - Flooring/stairs
Floor
Mar 29, 2026 · Apt 3A
Close - Safety
Window guard broken/missing
Mar 29, 2026 · Apt 3A
Close - Flooring/stairs
Floor
Mar 29, 2026 · Apt 3A
Close
Show 40 more ↓
- Unsanitary condition
Mold
Mar 29, 2026 · Apt 3A
Close - Appliance
Electric/gas range
Mar 29, 2026 · Apt 3A
Close - Plumbing
Bathtub/shower
Mar 29, 2026 · Apt 3A
Close - Door/window
Door
Mar 29, 2026 · Apt 3A
Close - General
Cabinet
Mar 19, 2026 · Apt BE
Close - Electric
Outlet/switch
Feb 20, 2026 · Apt 5H
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt BE
Close - Water leak
Heavy flow
Jan 8, 2026 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 2, 2026 · Apt BE
Close - Heat/hot water
Apartment only
Jan 2, 2026 · Apt 5B
Close - Heat/hot water
Apartment only
Jan 1, 2026 · Apt BE
Close - Heat/hot water
Apartment only
Dec 28, 2025 · Apt BE
Close - Heat/hot water
Entire building
Dec 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt BE
Close - Heat/hot water
Apartment only
Dec 13, 2025 · Apt BE
Close - Heat/hot water
Apartment only
Dec 11, 2025 · Apt BE
Close - Heat/hot water
Apartment only
Dec 10, 2025 · Apt BE
Close - Heat/hot water
Apartment only
Dec 4, 2025 · Apt BE
Close - General
Cooking gas
Dec 4, 2025 · Apt BE
Close - Appliance
Electric/gas range
Dec 4, 2025 · Apt BE
Close - Heat/hot water
Apartment only
Dec 3, 2025 · Apt BE
Close - Heat/hot water
Apartment only
Dec 3, 2025 · Apt BE
Close - Heat/hot water
Apartment only
Dec 1, 2025 · Apt BE
Close - Heat/hot water
Apartment only
Nov 28, 2025 · Apt BE
Close - Heat/hot water
Apartment only
Nov 27, 2025 · Apt BE
Close - Heat/hot water
Apartment only
Nov 25, 2025 · Apt BE
Close - Heat/hot water
Apartment only
Nov 23, 2025 · Apt BE
Close - Heat/hot water
Entire building
Nov 22, 2025 · Apt 3D
Close - Appliance
Electric/gas range
Nov 20, 2025 · Apt BE
Close - Plumbing
Water supply
Nov 19, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Nov 12, 2025 · Apt BE
Close - Heat/hot water
Apartment only
Nov 12, 2025 · Apt BE
Close - Water leak
Heavy flow
Oct 26, 2025 · Apt 3A
Close - Appliance
Electric/gas range
Sep 26, 2025 · Apt BE
Close - Paint/plaster
Ceiling
Sep 11, 2025 · Apt BE
Close - General
Cabinet
Sep 11, 2025 · Apt BE
Close - Paint/plaster
Ceiling
Sep 4, 2025 · Apt BE
Close - Water leak
Heavy flow
Sep 4, 2025 · Apt BE
Close - Heat/hot water
Entire building
May 22, 2025 · Apt APT3D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 5
- Residential units
- 84
- Building area
- 70,400 ft²
- Lot area
- 17,500 ft²
- Zoning
- R6
- Community board
- 202
- Council district
- 17
- Block / lot
- 2765 / 79
- Assessed value
- $1,120,500
- Landmark / historic district
- No
HPD registration #200514, last renewed Jul 20, 2026.
Questions about 667 Casanova Street
Who owns 667 Casanova Street?
The owner of record in NYC Department of City Planning PLUTO data is Hunts Point Hsng Devfun.
Does 667 Casanova Street have violations?
Yes. NYC HPD has recorded 237 housing violations at this property.
Is 667 Casanova Street rent stabilized?
NYC Department of Finance tax bills listed 69 rent-stabilized units here in 2024 (about 82% of its 84 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 667 Casanova Street built?
City records list 1920 as the year it was built.
How many apartments are in 667 Casanova Street?
It has 84 residential units and 86 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.