824 Southern Boulevard
Bronx, NY 10459BBL 2-02732-0008Map
Owner of record: 824 Southern Blvd, Holding, LLC
824 Southern Boulevard is a walk-up apartment building built in 1923 in Bronx, 10459. It has 58 residential units across 6 floors. The owner of record is 824 Southern Blvd, Holding, LLC. HPD has recorded 43 housing violations here, most recently on September 22, 2026. 5 of the 43 most recent violations are still open. City tax records listed 57 rent-stabilized apartments here in 2024.
- HPD violations
- 43
- DOB violations
- 8
- ECB violations
- 0
- HPD complaints
- 358
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 43
- BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet . in the bathroom located at apt 5g, 5th story, 1st apartment from south at west
Sep 22, 2026 · Apt 5G
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 5g, 5th story, 1st apartment from south at west
Sep 22, 2026 · Apt 5G
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5g, 5th story, 1st apartment from south at west
Sep 22, 2026 · Apt 5G
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5g, 5th story, 1st apartment from south at west
Sep 22, 2026 · Apt 5G
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 1o square feet at ceiling and south wall in the bathroom located at apt 5g, 5th story, 1st apartment from south at west
Sep 22, 2026 · Apt 5G
Open — Civ14 mailed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceilng in the bathroom located at apt 5g, 5th story, 1st apartment from south at west
Dec 20, 2025 · Apt 5G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 5h, 5th story, 1st apartment from east at south
May 21, 2025 · Apt 5H
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at roof bulkhead east, west, south and north walls 6th story ( south section )
Nov 28, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing sign
Nov 28, 2024
Closed — Violation closed - ANon-hazardous
Paint or post a sign indicating floors at public hallway stairs 3rd story ( south section )
Nov 28, 2024
Closed — Violation closed
Show 33 more ↓
- ANon-hazardous
Paint or post a sign indicating floors at public hallway stairs 2nd story ( south section )
Nov 28, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at roof bulkhead east, west, south and north walls 6th story ( south section )
Nov 28, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at roof bulkhead east, west, south and north walls 6th story ( south section )
Nov 28, 2024
Closed — Violation closed - ANon-hazardous
Paint or post a sign indicating floors at public hallway stairs 6th story ( south section )
Nov 28, 2024
Closed — Violation closed - ANon-hazardous
Paint or post a sign indicating floors at public hallway stairs 5th story ( south section )
Nov 28, 2024
Closed — Violation closed - ANon-hazardous
Paint or post a sign indicating floors at public hallway stairs 4th story ( south section )
Nov 28, 2024
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, and north wall in the bathroom located at apt 5h, 5th story, 1st apartment from east at south , section ''north''
Nov 19, 2024 · Apt 5H
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 5h, 5th story, 1st apartment from east at south , section ''north''
Nov 19, 2024 · Apt 5H
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5h, 5th story, 1st apartment from east at south , section ''north''
Nov 19, 2024 · Apt 5H
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective upper sash window spring balance in the kitchen located at apt 6h, 6th story, 1st apartment from east at south
Sep 4, 2024 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 6h, 6th story, 1st apartment from east at south
Sep 4, 2024 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6h, 6th story, 1st apartment from east at south
Sep 4, 2024 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 6h, 6th story, 1st apartment from east at south
Sep 4, 2024 · Apt 6H
Closed — Violation dismissed - BHazardous
Provide adequate lighting at ceiling at west fire passageway at public hall
Sep 2, 2024
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at wash basin in the bathroom located at apt 6h, 6th story, 1st apartment from north at east
May 8, 2019 · Apt 6H
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at wash basin in the bathroom located at apt 6h, 6th story, 1st apartment from north at east
May 8, 2019 · Apt 6H
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 6h, 6th story, 1st apartment from north at east
May 8, 2019 · Apt 6H
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 6h, 6th story, 1st apartment from north at east
May 8, 2019 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall at bulkhead
Apr 1, 2019
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at skylight at bulkhead
Apr 1, 2019
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding through window at 3rd story balcony at front of building at fire escape
Nov 30, 2018
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening door lock to fire escape room in the 1st room from east located at apt 6g, 6th story, 1st apartment from west at north
Oct 4, 2013 · Apt 6G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retarded walls north,south,east and west at bulkhead to roof at public hall, 6th story, section at north
Oct 4, 2013
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls at bulkhead leading to roof at public hall, 6th story, section at north
Oct 4, 2013
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarded walls north,south,east and west at bulkhead to roof at public hall, 6th story, section at south
Oct 4, 2013
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls at bulkhead leading to roof at public hall, 6th story, section at south
Oct 4, 2013
Closed — Violation closed - BHazardous
Replace with new the missing ,air-valves at steam -radiators in the entire apartment located at apt 6g, 6th story, 1st apartment from west at north , section at east
Jan 21, 2011 · Apt 6G
Closed — Violation closed - BHazardous
Replace with new the broken or defective ,glass -panes top and bottom window sashes in the entire apartment located at apt 6g, 6th story, 1st apartment from west at north , section at east
Jan 21, 2011 · Apt 6G
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors ,doors at public hall stairs bulk-head east and west sections at public hall stairs
Jan 21, 2011
Closed — Violation closed - BHazardous
Replace with new the broken or defective upper wire glass pane at entrance door to bldg at public hall, 1st story
Nov 9, 2010
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 5a, 5th story, 2nd apartment from south at west
Mar 31, 2010 · Apt 5A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east, the foyer , the 4th room from east located at apt 5a, 5th story, 2nd apartment from south at west
Mar 31, 2010 · Apt 5A
Closed — Violation closed
DOB building violations · 8
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Plumbing
Water supply
Sep 13, 2026 · Apt 5G
Close - Plumbing
Basin/sink
Sep 13, 2026 · Apt 5G
Close - Unsanitary condition
Mold
Sep 13, 2026 · Apt 5G
Close - Plumbing
Toilet
Sep 13, 2026 · Apt 5G
Close - Paint/plaster
Wall
Sep 13, 2026 · Apt 5G
Close - Paint/plaster
Ceiling
Sep 13, 2026 · Apt 5G
Close - Heat/hot water
Entire building
Mar 3, 2026 · Apt 1G
Close - Heat/hot water
Entire building
Feb 12, 2026 · Apt 2G
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 2G
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 1C
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2025 · Apt NILESP
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 2G
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 1C
Close - Paint/plaster
Wall
Dec 1, 2025 · Apt 5G
Close - Unsanitary condition
Mold
Dec 1, 2025 · Apt 4G
Close - Unsanitary condition
Sewage
Dec 1, 2025 · Apt 4G
Close - Paint/plaster
Wall
Dec 1, 2025 · Apt 4G
Close - Paint/plaster
Ceiling
Dec 1, 2025 · Apt 4G
Close - Plumbing
Basin/sink
Dec 1, 2025 · Apt 5G
Close - Unsanitary condition
Mold
Dec 1, 2025 · Apt 5G
Close - Water leak
Damp spot
Dec 1, 2025 · Apt 4G
Close - Plumbing
Basin/sink
Dec 1, 2025 · Apt 4G
Close - Heat/hot water
Entire building
Nov 20, 2025 · Apt 2G
Close - Heat/hot water
Entire building
Nov 20, 2025 · Apt 3K
Close - Heat/hot water
Entire building
Nov 19, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2025 · Apt 6E
Close - Heat/hot water
Entire building
Nov 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt 5L
Close - Unsanitary condition
Mold
Sep 29, 2025 · Apt 4G
Close - Heat/hot water
Entire building
Feb 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1923
- Floors
- 6
- Residential units
- 58
- Building area
- 41,874 ft²
- Lot area
- 10,000 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2732 / 8
- Assessed value
- $1,206,450
- Landmark / historic district
- No
HPD registration #201609, last renewed Jul 30, 2026.
Questions about 824 Southern Boulevard
Who owns 824 Southern Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 824 Southern Blvd, Holding, LLC.
Does 824 Southern Boulevard have violations?
Yes. NYC HPD has recorded 43 housing violations at this property.
Is 824 Southern Boulevard rent stabilized?
NYC Department of Finance tax bills listed 57 rent-stabilized units here in 2024 (about 98% of its 58 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 824 Southern Boulevard built?
City records list 1923 as the year it was built.
How many apartments are in 824 Southern Boulevard?
It has 58 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.