1140 Tiffany Street
Bronx, NY 10459BBL 2-02718-0017Map
Owner of record: Tiffany Street Associates LP
1140 Tiffany Street is an elevator apartment building built in 2008 in Bronx, 10459. It has 84 residential units across 8 floors. The owner of record is Tiffany Street Associates LP. HPD has recorded 642 housing violations here, most recently on October 12, 2026. 50 of the 50 most recent violations are still open. City tax records listed 84 rent-stabilized apartments here in 2024.
- HPD violations
- 642
- DOB violations
- 66
- ECB violations
- 38
- HPD complaints
- 640
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 642
- BHazardous
Properly repair and abate unsafe electric wiring condition consisting of wire connections at east wall at public hall, 1st story
Oct 12, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 6d, 6th story, 2nd apartment from west at north
Oct 12, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 6d, 6th story, 2nd apartment from west at north
Oct 12, 2026 · Apt 6D
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6d, 6th story, 2nd apartment from west at north
Oct 12, 2026 · Apt 6D
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective exhaust vent at east wall in the bathroom located at apt 6d, 6th story, 2nd apartment from west at north
Oct 12, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective silicone caulking around the bathtub in the bathroom located at apt 6d, 6th story, 2nd apartment from west at north
Oct 12, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood stool at window in the 3rd room from east located at apt 6d, 6th story, 2nd apartment from west at north
Oct 12, 2026 · Apt 6D
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... observed less than 10 sq.ft at window stool in the 2nd room from east located at apt 6d, 6th story, 2nd apartment from west at north
Oct 12, 2026 · Apt 6D
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north and west wall in the kitchen located at apt 6d, 6th story, 2nd apartment from west at north
Oct 7, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from east at north located at apt 6d, 6th story, 2nd apartment from west at north
Oct 7, 2026 · Apt 6D
Open — Nov sent out
Show 40 more ↓
- BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10sq.ft but less than 30 sq ft at north wall in the 3rd room from east at north located at apt 6d, 6th story, 2nd apartment from west at north
Oct 7, 2026 · Apt 6D
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective entrance door panel in the 2nd room from north located at apt 6d, 6th story, 2nd apartment from west at north
Oct 7, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from north located at apt 6d, 6th story, 2nd apartment from west at north
Oct 7, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 6d, 6th story, 2nd apartment from west at north
Oct 7, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 2nd room from east located at apt 6d, 6th story, 2nd apartment from west at north
Oct 7, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by the method of glazed at the bathtub in the bathroom located at apt 6d, 6th story, 2nd apartment from west at north
Oct 7, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10sq.ft but less than 30 sq ft at north wall in the 2nd room from east located at apt 6d, 6th story, 2nd apartment from west at north
Oct 7, 2026 · Apt 6D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6c, 6th story, 1st apartment from north at east
Oct 5, 2026 · Apt 6C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3c, 3rd story, 1st apartment from south at west
Oct 5, 2026 · Apt 3C
Open — Civ14 mailed - CImmediately hazardous
Provide ready access to buildings heating system no access to basement at boiler room
Oct 5, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6c, 6th story, 1st apartment from south at west
Oct 5, 2026 · Apt 6C
Open — Civ14 mailed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Oct 5, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7b, 7th story, 1st apartment from north at east
Oct 5, 2026 · Apt 7B
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6c, 6th story, 1st apartment from north at east
Oct 5, 2026 · Apt 6C
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Oct 4, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 4, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6d, 6th story, 1st apartment from east at south
Oct 4, 2026 · Apt 6D
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 2nd fire door from north at east at stairwell ''b'' at public hall, 7th story
Oct 4, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the foyer located at apt 1a, 1st story, 1st apartment from north at east
Oct 4, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the foyer located at apt 1a, 1st story, 1st apartment from north at east
Oct 4, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 3, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6c, 6th story, 1st apartment from north at east
Oct 3, 2026 · Apt 6C
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to roof at 2nd public hall bulkhead from north, 8th story
Oct 2, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system no access to boiler room at boiler room
Oct 2, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8a, 8th story, 1st apartment from south at west
Oct 2, 2026 · Apt 8A
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7a, 7th story, 1st apartment from south at west
Sep 30, 2026 · Apt 7A
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6d, 6th story, 1st apartment from east at south
Sep 30, 2026 · Apt 6D
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 7a, 7th story, 1st apartment from south at west
Sep 30, 2026 · Apt 7A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 7a, 7th story, 1st apartment from south at west
Sep 30, 2026 · Apt 7A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Sep 30, 2026
Open — Nov certified on time - CImmediately hazardous
Properly repair or replace the broken or defective cracked outter glass pane at rear yard door at public hall, 1st story
Sep 24, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hitting saddle to rear yard at public hall, 1st story
Sep 24, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3h, 3rd story, 1st apartment from north at east
Sep 24, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3h, 3rd story, 1st apartment from north at east
Sep 24, 2026 · Apt 3H
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3h, 3rd story, 1st apartment from north at east
Sep 24, 2026 · Apt 3H
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3h, 3rd story, 1st apartment from north at east
Sep 24, 2026 · Apt 3H
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair with similar material the broken or defective bulging wood floor in the 1st room from east located at apt 3h, 3rd story, 1st apartment from north at east
Sep 24, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in wasteline pipe at bathtub in the bathroom located at apt 6g, 6th story, 1st apartment from north at east
Sep 21, 2026 · Apt 6G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 6g, 6th story, 1st apartment from north at east
Sep 21, 2026 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell buzzer from building street entrance to west wall in the foyer located at apt 6g, 6th story, 1st apartment from north at east
Sep 21, 2026 · Apt 6G
Open — Nov sent out
DOB building violations · 66
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 8, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Facade safety program facade required
Cycle 8b unsafe report filed
May 3, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 19, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 21, 2019
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 29, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2017
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 24, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 24, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 12, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 12, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 12, 2013
Dob violation - resolved
ECB violations · 38
- Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#x0000475 by the august 1,2024 deadline.to date,the department has
Oct 1, 2024
Resolve - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 077721 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for low-pressu
Jun 7, 2024
Resolve - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 077721 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for low-pressu
Jun 7, 2024
Resolve - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 077721 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for low-pressu
Jun 7, 2024
Resolve - Class - 1
Failure to maintain building exterior facade and appurtenances.as noted: exposure 1 spalled/cracked bricks and stones cracked window sills damaged mortar joints exposure #2 damaged stucco or parapet
Jun 26, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #814743. rmdy: submit required technical report.
Oct 15, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #814878. rem: submit required technical report.
Oct 15, 2018 · Penalty $1,250
Resolve - Class - 2
33h11,12q03,68b07,99bb05,59m05,29i11-33)counterweight rollers worn. 12)in car lighting unguarded. 68)provide maintenance detail log book. 99)1 year exp. 59)perform brake maintenance. 29)broken connector or oper
Oct 2, 2017 · Penalty $1,250
Resolve - Class - 1
Cease use. 5a10,2x10. (5a)car door restrictor tampered w/ alarm bell not working. repair & contact nyc dob for re-insp nyc dob [email protected] & 212-393-2435 to return device to service.
Sep 6, 2017 · Penalty $1,000
Resolve - Class - 2
9i10,100b10. 9- broken tiles and flr sunken in. 100- safeties make noise going up the shaftway.
Feb 17, 2012 · Penalty $250
Resolve
Show 28 more ↓
- Class - 1
97r# 97r#device operated by site super. franf giordano w/o equipment ppermit and no safety governor on platform remedy:obtain cert.of compliance
Aug 26, 2009 · Penalty $500
Resolve - Class - 1
97r# 97r# device operated by super. franf giordano w/o equipmentuse permit and safety governor on platform remedy:obtain cofc
Aug 26, 2009
Resolve - Class - 1
45m7.97#17.45m7 platform in operation w/o safety governor 97#17 use of unsafe platform by non-employee superintendent or elevator company cure-inspection required
Aug 26, 2009 · Penalty $1,000
Resolve - Non-hazardous
73##
Feb 24, 1999
Resolve - Non-hazardous
Work without a permit work noted constructed new store fron & interiorpartition for office at front. remedy: file plan to obtain approval & permit/or restore back to legal prior condition.
Sep 29, 1997
Resolve - Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy c of o #51489-87 expired sept.27-1987 note:created a oppening through 922 firewall conmecting with 918 & coading & unloading of trucks and car
Jan 18, 1995
Resolve - Non-hazardous
Work without a permit work noted created opening appro.5 wide x7high through a fire sparation walls at north front.connecting 922 with 918 making one store.remedy:discontinue unlawful use /and restore file pla
Jan 18, 1995 · Penalty $1,000
Resolve - Non-hazardous
Altered duilding occupied without a valid certificate of occupancy alt 274/65. remedy: obtain valid capo.
Jan 6, 1995
Resolve - Non-hazardous
Work without apermit (new store front erected office & partitions at front of premises holesin wall. new doors. remedy: obtain a permit if feasible or restore premises to prior legal condition.
Jun 16, 1994
Resolve - Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy #51489 87 expired sept. 27/87. remedy: discontinue llegaluse (noted loading & unlanding of trucks & cars east 169 st side of premises contrary
Jun 16, 1994
Resolve - Non-hazardous
Work without a permit. work noted: erected two mezzanines, one at front and one at rear.erected two extensions at rear: one masonry 25' x 25' x15' and one of wood and metal 25' x38' x 15' remedy: obtain approva
Apr 18, 1994
Resolve - Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy. certificate of occupancy #51489 expired 9-27-87 remedy: obtain a new certificate of occupancy.
Apr 18, 1994 · Penalty $350
Resolve - Non-hazardous
Work without apermit. work noted: erected new storefront. created an office at front of building. remedy: obtain approvals and permits
Apr 18, 1994
Resolve - Non-hazardous
Work without a permit work noted: new store front erected (2) officesand partitions at front erected. remedy: file plans + obtain permits.noted no jobs filed as per 04.04.94.
Apr 4, 1994
Resolve - Non-hazardous
Work noted: (1) new store front erected. (2) office and partitions at front has been erected. remedy: file plans & obtain permits
Mar 8, 1993 · Penalty $350
Resolve - Non-hazardous
Defect noted: mortar missing througout brickwork at various locations at front. remedy: make all necessary reapirs in a safe and lawful manner
Mar 8, 1993 · Penalty $350
Resolve - Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy. c of o #51489/87 expired sept 27-87. remedy: obtain a certificate of occupancy or note: loading and unloading of trucks and/ or cars at e. 169
Mar 8, 1993 · Penalty $350
Resolve - Non-hazardous
Work without a permit. work noted: 1. erected new store front. 2. erected office and partition at front. remedy: file plans and approvals and permit for work done or restore to prior legal condition
May 27, 1992
Resolve - Non-hazardous
Work iwthout a permit. work noted 1. erected mezzanine at front and rear. 2. block extinsion erected at rear approx 25'x25'x15'. remedy: file plans and obtain approvals and permit for owk done or restore to
May 18, 1992
Resolve - Non-hazardous
Occupancy contrary to that allowed by certificate of occupancy#51489 which expired 9-27-87 there is loading and unloading of trucks and/or car at e. 169 st. side of bldg. which is contrary to b.s.a col#8-67-bz
May 11, 1992
Resolve - Non-hazardous
Work without a permit work noted.1.erected 2 two mezzaineat front and rear 2.erected 2.extenions one concrete block approx.25x25x15 two woodmetal approx. 25x38x1 at rear. remedy: file plan and obtain permit.
May 7, 1992
Resolve - Non-hazardous
Illegal use in a residential district. (noted) illegal use in a residential district. wholesale grocery and beer distribution in a r7-1 district. remedy: discontintinue illegal use
Apr 17, 1992 · Penalty $460
Resolve - Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy c of o #51489 had expired 9-27-87. loading and unloading of trucks and/ or cars at 169th st side of premises contrary to b.s.a. cal no#8-67-bz
Jul 30, 1990 · Penalty $710
Resolve - Non-hazardous
Occupancy contrary to that allowed by the c of o remedy: renew a c/o
Jan 30, 1990 · Penalty $250
Resolve - Non-hazardous
Failrue to maintain. brickwork crackes and defective at various locations.
Jan 30, 1990 · Penalty $250
Resolve - Non-hazardous
Work without a permit. remedy: obtain a permit.
Jan 30, 1990 · Penalty $250
Resolve - Non-hazardous
Failure to maintain. exterior building wall. brickwork loose and defectove. remedy: make all repairs.
Jan 30, 1990 · Penalty $250
Resolve - Non-hazardous
Work without a permit. remedy: obtain a permit.
Jan 30, 1990 · Penalty $250
Resolve
Complaints
- Paint/plaster
Wall
Oct 20, 2026 · Apt 7F
Open - Electric
Outlet/switch
Oct 20, 2026 · Apt 7F
Open - Electric
Lighting
Oct 20, 2026 · Apt 7F
Open - Appliance
Refrigerator
Oct 20, 2026 · Apt 7F
Open - Door/window
Door
Oct 20, 2026 · Apt 7F
Open - Door/window
Door
Oct 14, 2026 · Apt 3A
Open - Plumbing
Toilet
Oct 14, 2026 · Apt 3A
Open - Plumbing
Bathtub/shower
Oct 8, 2026 · Apt 6D
Open - Water leak
Damp spot
Oct 8, 2026 · Apt 6D
Open - Unsanitary condition
Mold
Oct 8, 2026 · Apt 6D
Open
Show 40 more ↓
- Heat/hot water
Entire building
Oct 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 5, 2026 · Apt 7B
Close - Heat/hot water
Apartment only
Oct 5, 2026 · Apt 7B
Close - Heat/hot water
Entire building
Oct 4, 2026 · Apt 6C
Close - Heat/hot water
Entire building
Oct 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 2, 2026 · Apt 7B
Close - Heat/hot water
Apartment only
Oct 2, 2026 · Apt 6D
Close - Heat/hot water
Entire building
Oct 2, 2026 · Apt 6C
Close - Heat/hot water
Entire building
Oct 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 30, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Sep 30, 2026 · Apt 6D
Close - Water leak
Slow leak
Sep 30, 2026 · Apt 6D
Close - Plumbing
Bathtub/shower
Sep 30, 2026 · Apt 6D
Close - Plumbing
Water supply
Sep 27, 2026 · Apt 6D
Close - Paint/plaster
Wall
Sep 22, 2026 · Apt 3H
Open - Unsanitary condition
Pests
Sep 22, 2026 · Apt 3H
Open - Appliance
Electric/gas range
Sep 22, 2026 · Apt 3H
Open - Flooring/stairs
Floor
Sep 22, 2026 · Apt 3H
Open - Paint/plaster
Ceiling
Sep 16, 2026 · Apt 6G
Close - General
Bell/buzzer/intercom
Sep 16, 2026 · Apt 6G
Close - Appliance
Refrigerator
Sep 16, 2026 · Apt 6G
Close - Electric
Outlet/switch
Sep 16, 2026 · Apt 6G
Close - Paint/plaster
Ceiling
Sep 16, 2026 · Apt 6G
Close - Water leak
Slow leak
Sep 16, 2026 · Apt 6G
Close - Heat/hot water
Entire building
Sep 10, 2026 · Apt BUILDI
Close - Unsanitary condition
Pests
Sep 6, 2026 · Apt 3A
Close - Paint/plaster
Ceiling
Sep 1, 2026 · Apt 6G
Close - Water leak
Slow leak
Sep 1, 2026 · Apt 6G
Close - Water leak
Heavy flow
Aug 29, 2026 · Apt 6G
Close - Flooring/stairs
Floor
Aug 25, 2026 · Apt 3H
Close - Appliance
Electric/gas range
Aug 25, 2026 · Apt 3H
Close - Unsanitary condition
Pests
Aug 25, 2026 · Apt 3H
Close - Water leak
Heavy flow
Aug 20, 2026 · Apt 6G
Close - Paint/plaster
Ceiling
Aug 20, 2026 · Apt 6G
Close - Plumbing
Bathtub/shower
Aug 2, 2026 · Apt 3A
Close - Plumbing
Bathtub/shower
Aug 2, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 1, 2026 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2008
- Floors
- 8
- Residential units
- 84
- Building area
- 90,976 ft²
- Lot area
- 18,875 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2718 / 17
- Assessed value
- $1,489,500
- Landmark / historic district
- No
HPD registration #225897, last renewed Jul 15, 2025.
Questions about 1140 Tiffany Street
Who owns 1140 Tiffany Street?
The owner of record in NYC Department of City Planning PLUTO data is Tiffany Street Associates LP.
Does 1140 Tiffany Street have violations?
Yes. NYC HPD has recorded 642 housing violations at this property.
Is 1140 Tiffany Street rent stabilized?
NYC Department of Finance tax bills listed 84 rent-stabilized units here in 2024 (about 100% of its 84 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1140 Tiffany Street built?
City records list 2008 as the year it was built.
How many apartments are in 1140 Tiffany Street?
It has 84 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.