1049 Kelly Street
Bronx, NY 10459BBL 2-02705-0050Map
Owner of record: Kelly Manor LLC
1049 Kelly Street is a walk-up apartment building built in 1925 in Bronx, 10459. It has 8 residential units across 4 floors. The owner of record is Kelly Manor LLC. HPD has recorded 115 housing violations here, most recently on April 30, 2026. 2 of the 50 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 115
- DOB violations
- 14
- ECB violations
- 4
- HPD complaints
- 262
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 115
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5, 3rd story, 1st apartment from west at north
Feb 20, 2026 · Apt 5
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5, 3rd story, 1st apartment from west at north
Feb 20, 2026 · Apt 5
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at all walls and ceiling in the bathroom located at apt 5, 3rd story, 1st apartment from west at north
Feb 20, 2026 · Apt 5
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at all walls and ceiling in the bathroom located at apt 5, 3rd story, 1st apartment from west at north original violation 18659012 issued 20-feb-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Feb 20, 2026 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5, 3rd story, 1st apartment from west at north
Feb 20, 2026 · Apt 5
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage at building entrance yard
Aug 10, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door not self closing in the entrance located at apt 4, 2nd story, 1st apartment from south at west
Aug 7, 2023 · Apt 4
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule at public hall, 1st story
Aug 7, 2023
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 5th room from east located at apt 4, 2nd story, 1st apartment from south at west
Mar 22, 2023 · Apt 4
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 4, 2nd story, 1st apartment from south at west
Mar 22, 2023 · Apt 4
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the kitchen located at apt 4, 2nd story, 1st apartment from south at west
Mar 22, 2023 · Apt 4
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 4th room from east located at apt 4, 2nd story, 1st apartment from south at west
Mar 22, 2023 · Apt 4
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 4, 2nd story, 1st apartment from south at west
Mar 22, 2023 · Apt 4
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the 5th room from east located at apt 4, 2nd story, 1st apartment from south at west
Mar 22, 2023 · Apt 4
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north located at apt 3, 3rd story, 2nd apartment from south at west
Feb 7, 2020 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 2nd story, 2nd apartment from south at west
Nov 7, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 2nd story, 2nd apartment from south at west
Nov 7, 2019 · Apt 3
Open — Not complied with - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling approx. 16 sq ft. in the 5th room from east located at apt 3, 2nd story, 2nd apartment from south at west
Nov 7, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Refit wood door in the bathroom located at apt 3, 2nd story, 2nd apartment from south at west
Nov 7, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at walls in the bathroom located at apt 3, 2nd story, 2nd apartment from south at west
Nov 7, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective mortise door lock and assembly in the entrance located at apt 3, 2nd story, 2nd apartment from south at west
Nov 7, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 2nd story, 2nd apartment from south at west
Sep 19, 2019 · Apt 3
Open — Not complied with - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed ceiling in the 5th room from north located at apt 3, 3rd story, 2nd apartment from south at west
Sep 10, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at west wall in the bathroom located at apt 3, 3rd story, 2nd apartment from south at west
Sep 10, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 3, 3rd story, 2nd apartment from south at west
Sep 10, 2019 · Apt 3
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 2 square feet ceiling in the bathroom located at apt 5, 3rd story, 2nd apartment from south at west original violation 13213128 issued 06-aug-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 6, 2019 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 5, 3rd story, 2nd apartment from south at west
Aug 6, 2019 · Apt 5
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 2 square feet ceiling in the bathroom located at apt 5, 3rd story, 2nd apartment from south at west
Aug 6, 2019 · Apt 5
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3, 2nd story, 2nd apartment from north at east
Jul 18, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3, 2nd story, 2nd apartment from north at east
Jul 18, 2019 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 3, 2nd story, 2nd apartment from south at west
Jun 21, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective reglaze porcelain finish at bathtub in the bathroom located at apt 3, 2nd story, 2nd apartment from south at west
Jun 21, 2019 · Apt 3
Closed — Violation closed - BHazardous
Replace with new the broken or defective rotted wash basin wood cainet in the bathroom located at apt 3, 2nd story, 2nd apartment from south at west
Jun 21, 2019 · Apt 3
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the private hallway located at apt 3, 2nd story, 2nd apartment from south at west
Jun 21, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair or replace the smoke detector improperly installed at south wall more than 2 sq. ft from ceiling in the private hallway located at apt 3, 2nd story, 2nd apartment from south at west
Jun 21, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color closet ceiling and walls in the private hallway located at apt 3, 2nd story, 2nd apartment from south at west
Jun 21, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at closet ceiling in the private hallway located at apt 3, 2nd story, 2nd apartment from south at west
Jun 21, 2019 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at closet walls, approximately 5 sq. ft in the private hallway located at apt 3, 2nd story, 2nd apartment from south at west
Jun 21, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the entire apt. in the entire apartment located at apt 3, 2nd story
May 13, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Repair the broken or defective connection waste line pipe at wash basin in the bathroom located at apt 3, 2nd story, 2nd apartment from north at east
May 13, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 3, 2nd story
May 13, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor (approx. 3sq. ft.) in the kitchen located at apt 3, 2nd story, 2nd apartment from north at east
May 13, 2019 · Apt 3
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling and west wall (dimensions: 20 sq-ft) in the bathroom located at apt 3, 2nd story, 2nd apartment from south at west
Jul 27, 2017 · Apt 3
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 3, 2nd story, 2nd apartment from south at west
Jul 27, 2017 · Apt 3
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box
Jul 27, 2017
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 6th room from east located at apt 3, 2nd story, 2nd apartment from south at west
Jul 27, 2017 · Apt 3
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jul 27, 2017
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the bathroom located at apt 3, 2nd story, 2nd apartment from south at west
Jul 27, 2017 · Apt 3
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the bathroom located at apt 3, 2nd story, 2nd apartment from south at west
Jul 27, 2017 · Apt 3
Closed — Violation closed
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 2
Work does not conform to approved construction documents &/or approvedamendments for alt-2 job#220532476 loc folder. non-conformity noted: amend plan a-100.01 dated 3-8-17 proposes cellar to be storage & existi
May 2, 2018 · Penalty $625
Resolve - Class - 2
Failure to provide unobstructed exit passageway premises under alt-2 job#220532476 loc folder. at time of inspection found: north side passageway to be blocked bby 4 garbage cans. this passageway is an emergenc
May 2, 2018 · Penalty $313
Resolve - Class - 2
Occupancy contrary to that allowed by the c/o or bldg dept records. basement converted from ordinary use into a class 'a' apt w/full bathroom & kitchen,thereby increasing the bldg occupancy. remedy: discontinue
Jun 8, 2013 · Penalty $3,000
Resolve - Class - 2
& hpd records bsmt converted from ordinary use into a class a apt w/ full btrm and ktcn thereby increasing bldg occupancy rem: discontinue illegal use of amend c/o or obtain a permit
Jul 15, 2011 · Penalty $3,000
Resolve
Complaints
- Unsanitary condition
Mold
Feb 2, 2026 · Apt 5
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Plumbing
Bathtub/shower
Feb 2, 2026 · Apt 5
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 8, 2025 · Apt 6
Close - Unsanitary condition
Pests
Aug 8, 2025 · Apt 6
Close - Unsanitary condition
Garbage/recycling storage
Jul 8, 2024 · Apt BLDG
Close - Appliance
Refrigerator
Jul 3, 2024 · Apt 7
Close - Paint/plaster
Wall
Jun 28, 2023 · Apt 7
Close - Door/window
Door frame
Jun 28, 2023 · Apt 7
Close
Show 40 more ↓
- Unsanitary condition
Mold
Jun 28, 2023 · Apt 7
Close - Water leak
Slow leak
Jun 28, 2023 · Apt 7
Close - Appliance
Refrigerator
Jun 28, 2023 · Apt 7
Close - Unsanitary condition
Mold
Mar 22, 2023 · Apt 4
Close - Heat/hot water
Entire building
Dec 25, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 15, 2021 · Apt 7
Close - Heat/hot water
Apartment only
Nov 3, 2021 · Apt 5
Close - Heat/hot water
Entire building
Apr 20, 2021 · Apt 5
Close - Heat/hot water
Entire building
Nov 4, 2019 · Apt 3
Close - Flooring/stairs
Floor
May 9, 2019 · Apt 3
Close - Plumbing
Basin/sink
May 9, 2019 · Apt 3
Close - Unsanitary condition
Garbage/recycling storage
Sep 10, 2018 · Apt BLDG
Close - Water leak
Slow leak
Nov 1, 2017 · Apt 5
Close - Safety
Fire escape
Nov 1, 2017 · Apt 5
Close - Door/window
Door
Nov 1, 2017 · Apt 5
Close - Paint/plaster
Wall
Jul 22, 2017 · Apt 2
Close - Paint/plaster
Ceiling
Jul 22, 2017 · Apt 2
Close - Paint/plaster
Ceiling
Jul 22, 2017 · Apt 2
Close - Water leak
Heavy flow
Jul 22, 2017 · Apt 2
Close - Unsanitary condition
Sewage
Jul 22, 2017 · Apt 2
Close - Paint/plaster
Ceiling
Jul 22, 2017 · Apt 3
Close - Paint/plaster
Ceiling
Jul 22, 2017 · Apt 3
Close - Plumbing
Toilet
Jul 22, 2017 · Apt 3
Close - Unsanitary condition
Sewage
Jul 22, 2017 · Apt 3
Close - Appliance
Refrigerator
Feb 21, 2017 · Apt 2
Close - Appliance
Electric/gas range
Feb 21, 2017 · Apt 3
Close - Plumbing
Radiator
Nov 2, 2016 · Apt 2
Close - Water leak
Heavy flow
Nov 2, 2016 · Apt 2
Close - Paint/plaster
Ceiling
Nov 2, 2016 · Apt 2
Close - Appliance
Refrigerator
Nov 2, 2016 · Apt 2
Close - Paint/plaster
Wall
Nov 2, 2016 · Apt 2
Close - Paint/plaster
Ceiling
Nov 2, 2016 · Apt 2
Close - Water leak
Slow leak
Nov 2, 2016 · Apt 3
Close - Paint/plaster
Ceiling
Nov 2, 2016 · Apt 3
Close - Electric
No lighting
Nov 2, 2016 · Apt 3
Close - Paint/plaster
Wall
Aug 12, 2016 · Apt 8
Close - Door/window
Window pane
Aug 12, 2016 · Apt 8
Close - Electric
Outlet/switch
May 3, 2016 · Apt 8
Close - Water leak
Slow leak
May 3, 2016 · Apt 8
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1925
- Floors
- 4
- Residential units
- 8
- Building area
- 8,932 ft²
- Lot area
- 3,325 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2705 / 50
- Assessed value
- $728,550
- Landmark / historic district
- No
HPD registration #203392, last renewed Aug 13, 2025.
Questions about 1049 Kelly Street
Who owns 1049 Kelly Street?
The owner of record in NYC Department of City Planning PLUTO data is Kelly Manor LLC.
Does 1049 Kelly Street have violations?
Yes. NYC HPD has recorded 115 housing violations at this property.
Is 1049 Kelly Street rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1049 Kelly Street built?
City records list 1925 as the year it was built.
How many apartments are in 1049 Kelly Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.