935 Kelly Street
Bronx, NY 10459BBL 2-02703-0018Map
Owner of record: Kelly Street Redevelopment Housing Devel Opment Fun
935 Kelly Street is a walk-up apartment building built in 1912 in Bronx, 10459. It has 32 residential units across 5 floors. The owner of record is Kelly Street Redevelopment Housing Devel Opment Fun. HPD has recorded 1,383 housing violations here, most recently on October 3, 2026. 45 of the 50 most recent violations are still open. City tax records listed 32 rent-stabilized apartments here in 2024.
- HPD violations
- 1,383
- DOB violations
- 33
- ECB violations
- 24
- HPD complaints
- 2,129
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,383
- ANon-hazardous
Properly repair or replace the broken or defective mortise lock at building entrance door at public hall, 1st story
Oct 3, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective at ceiling fire retardant material at public hall, 1st story
Sep 20, 2026
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 20, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Sep 20, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 1st room from north located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the kitchen located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the private hallway located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation riser pipe in the 1st room from north located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint metal in accordance with dept. regulation radiator and riser pipe in the 2nd room from north located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 2nd room from north located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the 2nd room from north located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Sep 13, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4b, 4th story, 2nd apartment from west at north
Sep 10, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4b, 4th story, 2nd apartment from west at north
Sep 10, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4b, 4th story, 2nd apartment from west at north
Sep 10, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Provide approved glass at building entrance door (from street to vestibule) , 1st story
Jul 27, 2026
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of plexiglass installed at building entrance door (from street to vestibule) , 1st story
Jul 27, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective heavy duty mortise lock and assemblies at building entrance door (from street to vestibule) , 1st story
Jul 27, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ceiling light fixture at public hall, 4th story
Jul 23, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at entrance door in the entrance located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective latch set at entrance door in the entrance located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel by means of reglazing at bathtub in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at riser in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper escutcheon plate at riser in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper escutcheon plate at riser in the 2nd room from north located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ceiling light fixture in the 2nd room from north located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell and buzzer intercom system from building front to panel at north wall in the private hallway located at apt 4b, 4th story, 1st apartment from west at north
Jul 23, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 2nd apartment from west at north
Feb 18, 2026 · Apt 4B
Open — Notice of issuance sent to tenant - BHazardous
Refit door in the entrance located at apt 4b, 4th story, 2nd apartment from west at north
Dec 31, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical fixture at ceiling in the foyer located at apt 4b, 4th story, 2nd apartment from west at north
Dec 31, 2025 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules in the entire apartment located at apt 4b, 4th story, 2nd apartment from west at north
Dec 31, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
File certification of satisfactory installation of smoke detecting device in accordance with h.p.d. rules and regulations. in the entire apartment located at apt 4b, 4th story, 2nd apartment from west at north
Dec 31, 2025 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Fire escape defective. properly secure from bottom up the 3rd metal tread to 4th story balcony at 3rd fire escape from north, 3rd story
Dec 26, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective rubber gasket around refrigirator doors in the kitchen located at apt 3b, 3rd story, 2nd apartment from west at north
Dec 20, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Dec 20, 2025 · Apt 3B
Open — Notice of issuance sent to tenant
DOB building violations · 33
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 7, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 4, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 4, 2011
Dob violation - dismissed
Show 23 more ↓
- Emergency none
Egncy-emergency none
Jan 31, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 24
- Class - 2
Failure to provide approved plans at job site at time of inspection. no approved plan for job #220110911 at job site at time of inspection.remedy: provide approved plan.
May 10, 2012 · Penalty $250
Resolve - Class - 2
Rigger failed to place appropriate danger sign while using rigging equipment. active work site (2) suspended scaffolds off c-hook at site. remedy: provide proper signs.
Mar 23, 2012 · Penalty $400
Resolve - Class - 1
Failure to maintain. ceiling in foyer has partial collapse due to water & neglect approx 10'x 10' area is effected. remedy: obtain all necessary permits for repairs. make safe immediately.
Jun 13, 2011 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. noted at time of inspection: 1) bricks coming off bldg at exp 4 (e 163 st) 2) defective (pointing) and lintels causing water leaks in apt 5b. remedy: maintain
Jan 31, 2011 · Penalty $5,000
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner. noted at time of inspection following violating conditions. observed 1) apts 2b-5b sloping flrs n-8, cracks in walls and flr tiles. 2) apts 2a-5a sloping flrs
Jan 31, 2011 · Penalty $5,000
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner. noted: 1) bldg entry door completely off its hinges; which creates a breakdown in security. 2) hole,approx 2' x 3', in lobby ceiling,exposing spalling,masonry
Oct 20, 2010 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a certificate of correction w/the dept of bldgs. noted: respondent failed to comply with the commissioner's order to correct the violating conditions & file
Oct 20, 2010 · Penalty $4,000
Resolve - Class - 1
Failure to comply w/an order of the commissioner. noted: respondent failed to correct the conditions cited in the prior nov #34832834j. erected full-height partition walls, to create storage rooms, w/o a permit
Oct 20, 2010 · Penalty $24,000
Resolve - Class - 1
Unlawful acats.failure to comply w/an order of the comm.failure to comply w/comm's order to vacate apt.#21 vacte under #79/2010;apt.occuped @ time of inspec.pursuant to sec's 28-202.1 & 28-203.1 of adm. code of
Oct 15, 2010 · Penalty $12,000
Resolve - Class - 2
Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the dept. of bldg. noted : respondent failed to comply w/ the commissioner's order to correct the violating conditions & file
Aug 31, 2010 · Penalty $4,000
Resolve
Show 14 more ↓
- Class - 1
Unlawful acts. failure to comply with an order of the commissioner. noted: respondent failed to correct the conditions cited in the prior n.o.v. #34832834j. erected full height partitions,to create 2 storage
Aug 18, 2010 · Penalty $12,000
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner. noted: (1) bldg entry door is off its hinges & being supported,solely,by a light door closer which is not sturdy enough to support the heavy metal door. the
Aug 18, 2010 · Penalty $5,000
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept of bldgs. noted: respondent failed to comply with the commissioner's order to correct the violating conditions &
Aug 18, 2010 · Penalty $4,000
Resolve - Class - 2
B254,15,16,32a,48a,50,50a. 50- no light at boiler. 50a- clean debris out of boiler room.
Jun 23, 2010 · Penalty $2,500
Resolve - Class - 1
Sec 28-2-1.1, 28-207.4: failure to comply with the commissioners orderto vacate. vacate #79/2010 issued 3/29/10. it is ordered that the afo resaid bldg apt. #2a retain vacant and unoccupied until such time as
Apr 22, 2010 · Penalty $2,400
Resolve - Class - 1
Failure to maintain building in code-compliant manner defect noted @ cellar level part of ceiling below stores @ north section concrete slabis spalling & rebars are exposed & rusted wood beams below 1st story r
Mar 24, 2010 · Penalty $5,000
Resolve - Class - 1
Work w/o a permit. at cellar level of corner store - ne - "libernan shipping corp." erected full height partitions creating 2 rooms storing furniture, installed wood stairs from 1st sty to cellar,also installed
Mar 24, 2010 · Penalty $8,000
Resolve - Class - 3
Failure to maintain building interior defect noted: in sammy store drop ceiling is missing in various locations due to water leak. remedy: repair or replace.
Oct 6, 2008 · Penalty $500
Resolve - Class - 2
Failure to maintain bldg: interior (hazardous). defects noted: rotted joists at ceiling at grocery store at 948 163 st entrance. also drop ceiling is in danger of collapsing. remedy: repair/replace.
Sep 20, 2008 · Penalty $2,500
Resolve - Non-hazardous
Failure to file a 2005 annual boiler report with this department. remedy; file a current bo-9 inspection form as required.
Dec 18, 2006 · Penalty $2,500
Resolve - Hazardous
Failure to maintain building. defect:ceiling collapsed at variety plusstore.the collapsed ceiling is at the entry of store.it appears that wood and plaster has broken and fallen due to plumbing leak.
Jul 25, 2006 · Penalty $2,500
Resolve - Non-hazardous
Failue to maintain. defect is: 1)wood floor is severely sagging toward center of apartment 2b. 2)ceiling of stare below apartment 2b is cracked broken sagging and water is leaking at time of inspection. remedy:
Mar 28, 2002 · Penalty $800
Resolve - Non-hazardous
Work without a permit. work noted bathroom floor was defective. in danger of collapse and sagging approx 4" in apartment 2e. not: all work was completed. remedy: obtain approved plans and permit.
Feb 2, 2000 · Penalty $2,500
Resolve - Hazardous
Failure to maintain. defect is: bath fl is defective, in danger of collapse & sagging approx 4" in apt 2e. remedy: vacate apt, provide immediate temporary vertical shoring, make all necessary repairs,
Feb 5, 1999 · Penalty $800
Resolve
Complaints
- Plumbing
Radiator
Oct 18, 2026 · Apt 5G
Close - Paint/plaster
Wall
Oct 18, 2026 · Apt 5G
Close - Plumbing
Bathtub/shower
Oct 18, 2026 · Apt 5G
Close - Door/window
Door
Oct 2, 2026 · Apt 4B
Open - Plumbing
Water supply
Sep 25, 2026 · Apt 3B
Close - Door/window
Door
Sep 25, 2026 · Apt 3B
Close - Water leak
Slow leak
Sep 25, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Sep 25, 2026 · Apt 3B
Close - Paint/plaster
Ceiling
Sep 25, 2026 · Apt 3B
Close - Door/window
Door
Sep 25, 2026 · Apt 3B
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Sep 20, 2026 · Apt 4B
Close - Unsanitary condition
Garbage/recycling storage
Sep 13, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Sep 10, 2026 · Apt 4B
Close - Door/window
Door
Sep 10, 2026 · Apt 4B
Close - Flooring/stairs
Floor
Sep 10, 2026 · Apt 4B
Close - Plumbing
Bathtub/shower
Sep 10, 2026 · Apt 4B
Close - Electric
Lighting
Sep 10, 2026 · Apt 4B
Close - Plumbing
Bathtub/shower
Sep 10, 2026 · Apt 4B
Close - Unsanitary condition
Mold
Sep 10, 2026 · Apt 4B
Close - Unsanitary condition
Mold
Aug 7, 2026 · Apt 4B
Close - Water leak
Damp spot
Aug 7, 2026 · Apt 4B
Close - Electric
No lighting
Aug 3, 2026 · Apt 2G
Close - Water leak
Heavy flow
Aug 3, 2026 · Apt 2G
Close - Unsanitary condition
Pests
Jul 30, 2026 · Apt 5B
Close - Flooring/stairs
Floor
Jul 30, 2026 · Apt 5B
Close - Door/window
Door
Jul 30, 2026 · Apt 5B
Close - Paint/plaster
Wall
Jul 30, 2026 · Apt 5B
Close - Flooring/stairs
Floor
Jul 30, 2026 · Apt 5B
Close - Plumbing
Bathtub/shower
Jul 30, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Jul 30, 2026 · Apt 5B
Close - Plumbing
Bathtub/shower
Jul 30, 2026 · Apt 5B
Close - Electric
No lighting
Jul 30, 2026 · Apt 5B
Close - Paint/plaster
Wall
Jul 30, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Jul 26, 2026 · Apt APT3D
Close - Electric
Outlet/switch
Jul 26, 2026 · Apt APT3D
Close - Unsanitary condition
Pests
Jul 26, 2026 · Apt APT3D
Close - Electric
No lighting
Jul 26, 2026 · Apt APT3D
Close - Paint/plaster
Ceiling
Jul 26, 2026 · Apt APT3D
Close - Unsanitary condition
Pests
Jul 26, 2026 · Apt APT3D
Close - Unsanitary condition
Mold
Jul 26, 2026 · Apt APT3D
Close - Heat/hot water
Apartment only
Jul 23, 2026 · Apt 4B
Close - Safety
Fire escape
Jul 19, 2026 · Apt BLDG
Close - Safety
Window guard broken/missing
Jul 19, 2026 · Apt BLDG
Close - Door/window
Door
Jul 19, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 19, 2026 · Apt BLDG
Close - Water leak
Slow leak
Jul 11, 2026 · Apt 4B
Close - Paint/plaster
Ceiling
Jul 11, 2026 · Apt 4B
Close - Electric
Outlet/switch
Jul 7, 2026 · Apt 3B
Close - Door/window
Door
Jul 7, 2026 · Apt 3B
Close - General
Bell/buzzer/intercom
Jul 7, 2026 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1912
- Floors
- 5
- Residential units
- 32
- Building area
- 29,700 ft²
- Lot area
- 8,100 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2703 / 18
- Assessed value
- $744,750
- Landmark / historic district
- No
HPD registration #211816, last renewed Sep 11, 2025.
Questions about 935 Kelly Street
Who owns 935 Kelly Street?
The owner of record in NYC Department of City Planning PLUTO data is Kelly Street Redevelopment Housing Devel Opment Fun.
Does 935 Kelly Street have violations?
Yes. NYC HPD has recorded 1,383 housing violations at this property.
Is 935 Kelly Street rent stabilized?
NYC Department of Finance tax bills listed 32 rent-stabilized units here in 2024 (about 100% of its 32 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 935 Kelly Street built?
City records list 1912 as the year it was built.
How many apartments are in 935 Kelly Street?
It has 32 residential units and 36 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.