1249 Edward L Grant Hwy
Bronx, NY 10452BBL 2-02506-0054Map
Owner of record: 1245 Elgh LLC
1249 Edward L Grant Hwy is an elevator apartment building built in 2022 in Bronx, 10452. It has 110 residential units across 12 floors. The owner of record is 1245 Elgh LLC. HPD has recorded 63 housing violations here, most recently on September 30, 2026. 4 of the 50 most recent violations are still open. City tax records listed 110 rent-stabilized apartments here in 2024.
- HPD violations
- 63
- DOB violations
- 3
- ECB violations
- 27
- HPD complaints
- 169
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 63
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign posted information is missing at public hall, 1st story
Sep 30, 2026
Open — Nov certified on time - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Mar 25, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set in the entrance located at apt 12b, 12th story, 1st apartment from south at west
Mar 21, 2026 · Apt 12B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 12b, 12th story, 1st apartment from south at west
Mar 21, 2026 · Apt 12B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 20, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 11e, 11th story, 3rd apartment from south at west
Mar 20, 2026 · Apt 11E
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system signage missing at public hall, 1st story
Mar 20, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Feb 10, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3i, 3rd story, 4th apartment from south at west
Feb 10, 2026 · Apt 3I
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3i, 3rd story, 4th apartment from south at west
Feb 10, 2026 · Apt 3I
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Feb 4, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at boiler room
Feb 1, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2e, 2nd story, 3rd apartment from north at east
Feb 1, 2026 · Apt 2E
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeding over 130 degrees in the entire apartment located at apt 12d, 12th story, 2nd apartment from south at west
Jan 23, 2026 · Apt 12D
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2i, 2nd story, 1st apartment from north at east
Dec 31, 2025 · Apt 2I
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2i, 2nd story, 1st apartment from north at east
Dec 31, 2025 · Apt 2I
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 2i, 2nd story, 1st apartment from north at east
Dec 31, 2025 · Apt 2I
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 31, 2025
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective top hinges at entrance door in the bathroom located at apt 2e, 2nd story, 3rd apartment from north at east
Dec 22, 2025 · Apt 2E
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall ( near baseboard heating pipe) in the 1st room from east located at apt 2e, 2nd story, 3rd apartment from north at east
Dec 22, 2025 · Apt 2E
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing escutcheon plate at baseboard heating pipe on south wall in the 1st room from east located at apt 2e, 2nd story, 3rd apartment from north at east
Dec 22, 2025 · Apt 2E
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system that is missing at public hall 1st story
May 16, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at door in the entrance located at apt 6f, 6th story, 3rd apartment from north at east
May 9, 2025 · Apt 6F
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door in the entrance located at apt 6f, 6th story, 3rd apartment from north at east
Mar 10, 2025 · Apt 6F
Closed — Violation closed - BHazardous
Properly secure the loose hvac unit at east wall in the 2nd room from north located at apt 2i, 2nd story, 1st apartment from north at east
Feb 27, 2025 · Apt 2I
Closed — Violation dismissed - BHazardous
Properly secure the loose hvac unit at east wall in the 1st room from north located at apt 2i, 2nd story, 1st apartment from north at east
Feb 27, 2025 · Apt 2I
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2i, 2nd story, 1st apartment from north at east
Feb 27, 2025 · Apt 2I
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective radiator in the 2nd room from north located at apt 2c, 2nd story, 4th apartment from north at east
Feb 20, 2025 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 7i, 7th story, 1st apartment from north at east
Jan 14, 2025 · Apt 7I
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 14, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 2nd room from north at east located at apt 7i, 7th story, 1st apartment from north at east
Jan 14, 2025 · Apt 7I
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Jan 11, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 11, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 5th apartment from north at east
Jan 11, 2025 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 5th apartment from north at east
Jan 11, 2025 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 3a, 3rd story, 5th apartment from north at east
Dec 26, 2024 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 5th apartment from north at east
Dec 26, 2024 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 26, 2024
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3a, 3rd story, 5th apartment from north at east
Dec 26, 2024 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 22, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 2nd room from east located at apt 2j, 2nd story, 5th apartment from south at west
Dec 22, 2024 · Apt 2J
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 1st room from north located at apt 2i, 2nd story, 1st apartment from north at east
Dec 22, 2024 · Apt 2I
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 2nd room from east located at apt 2j, 2nd story, 5th apartment from south at west
Dec 22, 2024 · Apt 2J
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room, 1st story
Dec 22, 2024
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from north located at apt 2i, 2nd story, 1st apartment from north at east
Dec 22, 2024 · Apt 2I
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2c, 2nd story, 4th apartment from north at east
Dec 19, 2024 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures inadequate hot water at bathtub in the bathroom located at apt 3a, 3rd story, 4th apartment from east at south
Dec 18, 2024 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2i, 2nd story, 2nd apartment from north at east
Dec 7, 2024 · Apt 2I
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room, 1st story
Dec 7, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2i, 2nd story, 2nd apartment from north at east
Dec 7, 2024 · Apt 2I
Closed — Violation closed
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed
ECB violations · 27
- Class - 2
Provide designated lobby braille tags. brake maintenance tag must have full date.
Jul 26, 2024
Resolve - Class - 2
Provide designated lobby braille tags. brake maintenance tag must have full date.
Jul 26, 2024
Resolve - Class - 1
At the time of my inspection of a 12 story nb i observed workers performing housekeeping at exposure 1. sidewalk fully closed with sign to use temporary pedestrian walkway which was not maintained, no barriers
Aug 19, 2023 · Penalty $2,400
Resolve - Class - 1
Failure to notify the department of an accident incident that resultedin a fatality or an injury.note:a pedestrian struck a parked for kliftthe pedestrian was taken to hospital as per check of the department re
Apr 17, 2023 · Penalty $12,500
Resolve - Class - 1
Manufacture specifications. in response to incident where motorcyclist hit forklift in street area upon request to see operator's certification none was provided showing he was qualified to use forklift in safe
Mar 6, 2023 · Penalty $6,250
Resolve - Class - 1
Failure to institute and maintain safety measures. at time of inspection i observed on numerous floors electrical panel covers missing exposing electrical wires creating a hazardous condition to workers and per
Mar 6, 2023 · Penalty $6,250
Resolve - Class - 1
Storage& safeguarding of material and equipment. in response to incident i observed street area where fork lift was parked when it was hit by motorcyclist without any protection . failure to provide protection
Mar 6, 2023 · Penalty $6,250
Resolve - Class - 1
Use and tampering prohibited. in response to incident where motorcyclist hit parked forklift in street i observed forklift had been removed from incident area.nothing most removed/ touched at incident area unti
Mar 6, 2023 · Penalty $6,250
Resolve - Class - 2
12 story nb, i observed large accumulation of combustible debris made out of paper, plastic bags, wood, on the ground floor near the main entrance at exp1. hazard of fire exists, that can cause serious property
Jan 10, 2023
Resolve - Class - 2
12 story nb, i observed sidewalk shed(sws) at exp1, near exp2, horizontal brace at 6f 10inches, less than the minimum 8f clearance bc 3307.6.4.2 requires. hazard of struck by exists for the public, that can cau
Jan 10, 2023 · Penalty $2,400
Resolve
Show 17 more ↓
- Class - 2
At time of inspection of an active site, observed unsafe one level scaffold on the roof. scaffold was missing guard rails, loose planks, and no base plate. maintain as per code or remove
Dec 2, 2022
Resolve - Class - 1
At time of complaint inspection at new 12 story building approximately 6320 square feet. observed jobsite closed with no construction activity. upon shouting at perimeter and banging on jobsite fence to alert w
Aug 23, 2022 · Penalty $625
Resolve - Class - 1
Observed sidewalk shed erected at new 12 sty building with no lights on and fixtures present creating a hazardous condition to pedestrians walking under sidewalk shed from muggings, assaults, and other heinous
Aug 23, 2022 · Penalty $625
Resolve - Class - 1
Observed guardrail at expo #2 on 11 story at leading edge not properly secured loose and wobbly causing a potential fall hazard to workers and persons accessing that area resulting in injuryproperly repair and
Aug 22, 2022 · Penalty $2,500
Resolve - Class - 1
Observed missing electrical cover panel at circuit breaker 1st story creating a electrical hazard to workers and persons accessing that area from a potential electric shock resulting in injuryprovide missing co
Aug 22, 2022 · Penalty $625
Resolve - Class - 1
Observed large amounts of construction debris ( wood, concrete and metal) piled high and scattered throughout jobsite causing a trip and fall hazard resulting in injury.provide and maintain adequate housekeepin
Aug 22, 2022 · Penalty $625
Resolve - Class - 2
Observed vertical netting inadequately maintained with large gaps throughout jobsite allowing material and debris too roll under falling down below causing potential injury too workers or persons below.properly
Aug 22, 2022
Resolve - Class - 1
Observed horizontal netting attached / tied too d-rings upon request to see design drawings for horizontal netting showing safety and stability none were provided creating a hazard of potential dislodgement ca
Aug 22, 2022 · Penalty $625
Resolve - Class - 1
Observed construction material stored close to leading edge creating a hazardous condition from material falling off causing injury too workers and persons below. also observed material stacked high above 5 fee
Aug 22, 2022 · Penalty $625
Resolve - Class - 2
Work does not conform to plans. needle beams details missing information-no measurements for overhanging part at exposure # 4.amend plans
Jul 13, 2022
Resolve - Class - 2
Inadequate egress. there is only one mean of egress from 6th to 9th floor level. install one more ladder.
Jul 13, 2022
Resolve - Class - 1
Contractor continued work while on notice of stop work order issued on 06/04/2022 with complaint # 2346958 for failure to maintain protection to adjoining property at exposure # 4. job site was at 3rd floor le
Jul 13, 2022 · Penalty $5,000
Resolve - Class - 1
3309.1 & 3309.13 protection required of adjoining equipment and spacesat exp4 side-parking lot and electrical equipment.at time of inspection at a 12 story new building,i observed an active jobsite with workers
Jun 4, 2022
Resolve - Class - 2
Failure to maintain adequate housekeeping as per section requirements-2nd,3rd,4th floors.at time of inspection at a 12 story new building,i observed 2nd and 4th floor housekeeping in poor conditions throughout
Jun 4, 2022
Resolve - Class - 2
3301.7 documents to be kept onsite.i observed active worksite at foundation pile driving phase.responding to a complaint from neighbor at exp2 claiming of a big crack that appeared on his floor,i requested to s
Jan 3, 2022 · Penalty $620
Resolve - Class - 2
3301.1.2 improper storage of flammable gas.i observed acetylene tanks and oxygen tanks stored together in the same cage.fdny chapter 35 clearly states oxygen must be stores 20ft away from acetylene in seperate
Jan 3, 2022 · Penalty $620
Resolve - Class - 1
Failure to have site safety coordinator present at site required.i observed active worksite at foundation phase with 1 worker operating the excavator.1 worker cutting tree branches at exp2,3 and 1 worker riggin
Jan 3, 2022 · Penalty $10,000
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 20, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Oct 19, 2026 · Apt 2E
Close - Unsanitary condition
Pests
Sep 30, 2026 · Apt 2I
Close - General
Bell/buzzer/intercom
Sep 30, 2026 · Apt 2I
Close - Unsanitary condition
Pests
Sep 30, 2026 · Apt 2I
Close - Heat/hot water
Apartment only
Sep 30, 2026 · Apt 2I
Close - Electric
Outlet/switch
Sep 30, 2026 · Apt 2I
Close - Unsanitary condition
Pests
Aug 12, 2026 · Apt 2I
Close - General
Bell/buzzer/intercom
Aug 12, 2026 · Apt 2I
Close - Plumbing
Water supply
May 4, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
May 1, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 30, 2026 · Apt 10
Close - Heat/hot water
Apartment only
Apr 26, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Apr 25, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Apr 24, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Apr 22, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Mar 22, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Mar 21, 2026 · Apt 2E
Close - Heat/hot water
Entire building
Mar 20, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 19, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Mar 18, 2026 · Apt 2E
Close - Unsanitary condition
Mold
Mar 9, 2026 · Apt 12E
Close - Water leak
Heavy flow
Mar 9, 2026 · Apt 12E
Close - Paint/plaster
Wall
Mar 9, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Mar 9, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Mar 5, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 3I
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Feb 2, 2026 · Apt 2E
Close - Flooring/stairs
Floor
Jan 30, 2026 · Apt 2E
Close - Electric
Lighting
Jan 30, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 2E
Close - Door/window
Window frame
Jan 30, 2026 · Apt 2E
Close - Unsanitary condition
Mold
Jan 30, 2026 · Apt 2E
Close - Paint/plaster
Wall
Jan 30, 2026 · Apt 2E
Close - Plumbing
Radiator
Jan 30, 2026 · Apt 2E
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt 2E
Close - Door/window
Window frame
Jan 27, 2026 · Apt 7B
Close - Paint/plaster
Ceiling
Jan 27, 2026 · Apt 7B
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 7B
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 2I
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 2I
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 7B
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 2E
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 2E
Close - Plumbing
Radiator
Jan 23, 2026 · Apt 2E
Close - Unsanitary condition
Pests
Jan 23, 2026 · Apt 2E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2022
- Floors
- 12
- Residential units
- 110
- Building area
- 80,660 ft²
- Lot area
- 10,350 ft²
- Zoning
- R9A
- Community board
- 204
- Council district
- 16
- Block / lot
- 2506 / 54
- Assessed value
- $6,398,550
- Landmark / historic district
- No
HPD registration #228805, last renewed Jul 15, 2025.
Questions about 1249 Edward L Grant Hwy
Who owns 1249 Edward L Grant Hwy?
The owner of record in NYC Department of City Planning PLUTO data is 1245 Elgh LLC.
Does 1249 Edward L Grant Hwy have violations?
Yes. NYC HPD has recorded 63 housing violations at this property.
Is 1249 Edward L Grant Hwy rent stabilized?
NYC Department of Finance tax bills listed 110 rent-stabilized units here in 2024 (about 100% of its 110 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1249 Edward L Grant Hwy built?
City records list 2022 as the year it was built.
How many apartments are in 1249 Edward L Grant Hwy?
It has 110 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.