310 East 151 Street
Bronx, NY 10451BBL 2-02410-0028Map
Owner of record: 310 Bricks LLC
310 East 151 Street is a walk-up apartment building built in 1925 in Bronx, 10451. It has 14 residential units across 4 floors. The owner of record is 310 Bricks LLC. HPD has recorded 155 housing violations here, most recently on September 19, 2026. 50 of the 50 most recent violations are still open. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 155
- DOB violations
- 11
- ECB violations
- 21
- HPD complaints
- 184
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 155
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, 1st window frame from east at south wall in the kitchen located at apt 4e, 4th story, 1st apartment from north at east
Sep 19, 2026 · Apt 4E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st riser from north at east wall, west wall, 1st door frame from west at north wall in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Sep 19, 2026 · Apt 4E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall, baseboard at west wall in the 3rd room from north located at apt 4e, 4th story, 1st apartment from north at east
Sep 19, 2026 · Apt 4E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall, south wall, north wall in the 1st room from north located at apt 4e, 4th story, 1st apartment from north at east
Sep 19, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Sep 19, 2026 · Apt 4E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north located at apt 4e, 4th story, 1st apartment from north at east
Sep 19, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 4e, 4th story, 1st apartment from north at east
Sep 19, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall, west wall in the 3rd room from north located at apt 4e, 4th story, 1st apartment from north at east
Sep 19, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the 1st room from north located at apt 4e, 4th story, 1st apartment from north at east
Sep 19, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4e, 4th story, 1st apartment from north at east
Sep 4, 2026 · Apt 4E
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq feet at the south and west walls in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Sep 4, 2026 · Apt 4E
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective door knob at entrance door in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Sep 4, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel reglaze at bathtub in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Sep 4, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floors in the kitchen located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation riser pipe at east in the 2nd room from north located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective woods floors in the 3rd room from north located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at bottom in the entrance located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Replace the broken or defective cracked washbasin in the bathroom located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floors in the foyer located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout at public hall
Sep 4, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening padlock at roof hatch at 4th sty at public hall
Sep 4, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bicycles, shoppng carts and household items at public hall, 4th story
Sep 4, 2026
Open — Nov sent out - BHazardous
Provide wired glass at vestibule door at public hall, 1st story
Sep 4, 2026
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of plexi glass at vestibule door at public hall, 1st story
Sep 4, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 4, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood soffit between the 4th and 3rd sty at public hall stairs
Sep 4, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of tires, furniture and household items at rear yard
Sep 4, 2026
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout yard
Sep 4, 2026
Open — Nov sent out - BHazardous
Provide wired glass at building entrance door at public hall, 1st story
Sep 4, 2026
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of plexi glass at building entrance door at public hall, 1st story
Sep 4, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floors in the 3rd room from north located at apt 4e, 4th story, 1st apartment from north at east
Sep 4, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4e, 4th story, 1st apartment from north at east
Sep 4, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4e, 4th story, 1st apartment from north at east
Sep 4, 2026 · Apt 4E
Open — Civ14 mailed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4e, 4th story, 1st apartment from north at east
Sep 4, 2026 · Apt 4E
Open — Civ14 mailed - BHazardous
Provide escutcheon plate at top riser at east in the 3rd room from north located at apt 4e, 4th story, 1st apartment from north at east
Sep 4, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floors in the 2nd room from north located at apt 4e, 4th story, 1st apartment from north at east
Sep 4, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at bottom in the entrance located at apt 4e, 4th story, 1st apartment from north at east
Sep 4, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower counter balance at the south 1 window in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Sep 4, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Repair the broken or defective connection leaky pipe at wasteline at washbasin in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Sep 4, 2026 · Apt 4E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective latch set at the secondary egress door in the 1st room from north located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective cracked upper glass pane at the north 1 window in the 1st room from north located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood base cabinet at west in the kitchen located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair the broken or defective connection wasteline pipe at washbasin in the bathroom located at apt 1e, 1st story, 1st apartment from north at east
Sep 4, 2026 · Apt 1E
Open — Nov sent out - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories at building front at fire escape
Sep 4, 2026
Open — Nov sent out
DOB building violations · 11
- Construction other optional
Requesting a structural stability report due to cracks observed at exposure 1 masonry stoop at 1st story. temporary shoring with installed screw jack has been installed to support structure above with no permits on file.
Jul 9, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 9, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 15, 2010
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed
ECB violations · 21
- Class - 1
Removed or defaced a written posted vacate order. noted: at time of inspection - pvo posted at front entry door on 05/08/2026 was observed removed., comply with code
Jul 28, 2026 · Penalty $5,000
Active - Class - 1
Work without a permit. at the time of inspection, temporary shoring consisting of screw jacks was observed at the exposure 1 basement supporting the masonry entrance stoop. no permit was on file for the install
Jul 9, 2026 · Penalty $2,500
Active - Class - 1
Failure to maintain entrance stoop. at the time of inspection, the masonry entrance stoop at exposure 1 1st story exhibited stress cracks, and temporary screw-jack shoring was installed below the stoop, indicat
Jul 9, 2026 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code compliant manner: lack of required number of means of egress for every floor per bc 1018.1 (2008 code); 27-366; bc 102.1 (2014 code). noted: at time of inspection cellar apt
May 7, 2026 · Penalty $25,000
Active - Class - 2
W/o a permit. noted: water & waste lines at cellar observed removed for a 2 pc bthrm (toilet, sink); installed at rear for a toilet. see signed off flr plans for job # 220091415., obtain all permits
May 7, 2026 · Penalty $6,250
Active - Class - 1
Contrary to flr plans for signed off job # 220091415 - rear storage & utility rm area was observed created & occupied as a bdrm w/o natural light & ventilation. also, contrary to hpd mdr # 208821, building crea
May 7, 2026 · Penalty $12,500
Active - Class - 2
W/o a permit. noted: full height partition walls were removed & erected to change floor layout: see signed off flr plans for job # 220091415., obtain all permits
May 7, 2026 · Penalty $6,250
Active - Class - 2
Occupancy contrary to that allowed by the c of o or bldgs dept records@time of insp noted illegal class a apts in cellar w/full partition,3 pc bathroom full kitchen w/gas & waster & electrical lines run through
Apr 9, 2018
Resolve - Class - 2
B254,36. 36-as per class 254-36. boiler not registered as per dob records. correct all violating conditions and submit a certificate of correction.
Aug 14, 2017 · Penalty $500
Active - Class - 1
Unlawful acts.failure to comply w/ the comm's order.noted:respondent failed to correct the conditions cited in the prior nov#34850658z.installed gas line & plumbing for 3pc bathroom,@ apt#1w w/o a permit.comply
Nov 10, 2010
Resolve
Show 11 more ↓
- Class - 1
Failure to comply w/an order of the commissioner. noted: respondent failed to correct the conditions cited in the prior nov #34850658z. install gas line for stove & all plumbing for 3 pc bathroom, in apt 1w w/o
Sep 20, 2010
Resolve - Class - 1
Occupancy contrary to that allowed by the certificate of occupancy or bldg dept. records. noted: apt # 1w converted into two apts. which is illegal & also contrary to c of o & hpd # 63845. remedy: discontinue i
Jul 13, 2010
Resolve - Class - 1
Unlawful acts. failure to comply with an order of the commissioner. noted: respondent failed to correct the condition(s) cited in the prior n.o.v.# 34812425k. full-height partition walls erected in order to con
Jul 13, 2010
Resolve - Class - 1
Work w/o a permit.noted:on previously issued ecb violation#34812425k dated 02/02/10 for installing gasline for stove,residential sink & 3pc bathroom(toilet,sink,tub)@ apt 1w,west sect of bldg front now all plum
May 3, 2010 · Penalty $1,600
Resolve - Class - 2
Work w/o a permit found at location 1st fl apt 1w 1-ktcn including gas stove and 1-full btrm capped and removed w/o a permit rem; obtain a permit and arrange for insp w/ this dept
Feb 25, 2010 · Penalty $800
Resolve - Class - 1
Work w/out permit. noted: @ 1st story apt 1w, west side of bldg, illegal conversion of 1 apt into 2, creating full ht partition, blocking & sealing circulation of original apt layout from front to rear. @ front
Feb 2, 2010 · Penalty $800
Resolve - Class - 1
Occupancy contrary to that allowed by bldg dept records. dob/hpd records indicate bldg to be occupied as legal 8 class "a" apts. illegal occupancy created @ 1st sty apt 1w (west side of bldg) converted into 2 a
Feb 2, 2010 · Penalty $1,200
Resolve - Class - 1
Bc907.2.10.1 failure to provide required smoke detection device. defect noted: @ time of inspection sd/co device missing from apts 3e & 3w @3rd story. rem: comply with notice of violation provide sd/co.
Feb 2, 2010 · Penalty $1,600
Resolve - Class - 1
Residence altered for occupancy as a dwelling for more than the legally approved # of families bldg is an 8 dwelling property now 3 dwelling units have been converted to sros w/ 2 illegal class a apts @ cellar
Dec 8, 2009 · Penalty $17,000
Resolve - Class - 1
Work w.o permit. work noted: at 1st fl a partition was erected at apt 1w to subdivide to (2) illegal class "a" apts. at the cellar, (2) illegal class "a" apts were created with 3pc kitchens & bathrooms. at 2nd
Dec 8, 2009 · Penalty $8,000
Resolve - Class - 1
Failure to provide unobstructed exit passageway @ 4th fl apt #4w livingroom has been converted to a bedroom w/ a door & keylocking devices obstructing fire escape @ apt 1w & 2w a partition was erected so that
Dec 8, 2009 · Penalty $6,000
Resolve
Complaints
- Electric
No lighting
Oct 19, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Mar 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2025 · Apt 2E
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2025 · Apt BLDG
Close - Door/window
Window frame
Dec 6, 2024 · Apt 4W
Close - Heat/hot water
Apartment only
Dec 6, 2024 · Apt 4W
Close - Flooring/stairs
Floor
Dec 6, 2024 · Apt 4W
Close - Unsanitary condition
Pests
Dec 6, 2024 · Apt 4W
Close - General
Cabinet
Dec 6, 2024 · Apt 4W
Close - Unsanitary condition
Pests
Dec 6, 2024 · Apt 4W
Close - Door/window
Door
Dec 6, 2024 · Apt 4W
Close - Door/window
Door
Dec 6, 2024 · Apt 4W
Close - Flooring/stairs
Floor
Mar 25, 2024 · Apt 1E
Close - Heat/hot water
Entire building
Jan 17, 2024 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1925
- Floors
- 4
- Residential units
- 14
- Building area
- 6,712 ft²
- Lot area
- 2,960 ft²
- Zoning
- R6
- Community board
- 201
- Council district
- 17
- Block / lot
- 2410 / 28
- Assessed value
- $288,450
- Landmark / historic district
- No
HPD registration #208821, last renewed Aug 25, 2025.
Questions about 310 East 151 Street
Who owns 310 East 151 Street?
The owner of record in NYC Department of City Planning PLUTO data is 310 Bricks LLC.
Does 310 East 151 Street have violations?
Yes. NYC HPD has recorded 155 housing violations at this property.
Is 310 East 151 Street rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 50% of its 14 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 310 East 151 Street built?
City records list 1925 as the year it was built.
How many apartments are in 310 East 151 Street?
It has 14 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.