428 East 162 Street
Bronx, NY 10451BBL 2-02383-0017Map
Owner of record: 428 Partners LLC
428 East 162 Street is a walk-up apartment building built in 1931 in Bronx, 10451. It has 10 residential units across 4 floors. The owner of record is 428 Partners LLC. HPD has recorded 458 housing violations here, most recently on September 16, 2026. 16 of the 50 most recent violations are still open.
- HPD violations
- 458
- DOB violations
- 11
- ECB violations
- 8
- HPD complaints
- 1,004
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 458
- CImmediately hazardous
Properly repair or replace the broken or defective glass pane at lower sash at building entrance door at public hall, 1st story
Sep 16, 2026
Open — Nov certified on time - CImmediately hazardous
Properly repair or replace the broken or defective balance at lower sash at 1st window from north at east in the 4th room from north located at apt 3e, 3rd story, 1st apartment from east at south
Sep 16, 2026 · Apt 3E
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective connection at waste line at washbasin in the bathroom located at apt 3e, 3rd story, 1st apartment from east at south
Sep 16, 2026 · Apt 3E
Open — Civ14 mailed - ANon-hazardous
Properly repair with similar material the broken or defective sink base cabinet in the kitchen located at apt 3e, 3rd story, 1st apartment from east at south
Sep 16, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at building entrance door , 1st story
Sep 16, 2026
Open — Nov certified on time - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3e, 3rd story, 1st apartment from east at south
Sep 16, 2026 · Apt 3E
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3e, 3rd story, 1st apartment from east at south
Sep 16, 2026 · Apt 3E
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective latch set and its assemblies at building entrance door 1st story public hall
Sep 8, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door
Sep 8, 2026
Closed — Violation closed - BHazardous
Provide approved wire mesh underneath skylight at public hall, 4th story
Sep 8, 2026
Open — Nov certified on time
Show 40 more ↓
- BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination to electrical light fixture at ceiling at public hall, 4th story
Sep 8, 2026
Open — Nov certified on time - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 2nd room from north located at apt 3e, 3rd story, 1st apartment from east at south
Jun 27, 2026 · Apt 3E
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 3e, 3rd story, 1st apartment from east at south
Jun 27, 2026 · Apt 3E
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 3e, 3rd story, 1st apartment from east at south
Jun 27, 2026 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at north 1 door in the entrance located at apt 3e, 3rd story, 1st apartment from east at south
Jun 27, 2026 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3e, 3rd story, 1st apartment from east at south
Jun 27, 2026 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the 2nd room from north located at apt 3e, 3rd story, 1st apartment from east at south
Jun 27, 2026 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall, north wall in the 2nd room from north located at apt 3e, 3rd story, 1st apartment from east at south
Jun 27, 2026 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at south wall, west wall, and at ceiling in the kitchen located at apt 3e, 3rd story, 1st apartment from east at south
Jun 27, 2026 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at west wall, and at ceiling in the bathroom located at apt 3e, 3rd story, 1st apartment from east at south
Jun 27, 2026 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective heavy duty lock assembly at front entrance door to building
Jun 27, 2026
Open — Not complied with - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at upper sash at window at, at east wall in the 4th room from north located at apt 3e, 3rd story, 1st apartment from east at south
Jun 27, 2026 · Apt 3E
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of discarder garbage full of rubbish, wood beams and poles at front areaway of building
Jun 27, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4e, 4th story, 1st apartment from south at west
Jun 1, 2026 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from west at north wall in the bathroom located at apt 1w, 1st story, 1st apartment from south at west
Mar 5, 2026 · Apt 1W
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from west at north wall in the 4th room from north located at apt 1w, 1st story, 1st apartment from south at west
Mar 5, 2026 · Apt 1W
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch mechanism at door at building entrance , 1st story
Mar 5, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of folding table, outdoor cooking grill and bicycles at public hall, 1st story
Mar 5, 2026
Closed — Violation dismissed - BHazardous
Replace the broken or defective steam radiator at north in the 1st room from north located at apt 1w, 1st story, 1st apartment from south at west
Feb 28, 2026 · Apt 1W
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective the vinyl tiles on the floor in the 4th room from north located at apt 1w, 1st story, 1st apartment from south at west
Feb 28, 2026 · Apt 1W
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 1w, 1st story, 1st apartment from south at west
Dec 31, 2025 · Apt 1W
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door lcked at boiler room
Dec 28, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2e, 2nd story, 1st apartment from east at south
Dec 28, 2025 · Apt 2E
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2e, 2nd story, 1st apartment from east at south
Dec 28, 2025 · Apt 2E
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at 3rd room from east
Dec 22, 2025
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling at 2nd room from east
Dec 22, 2025
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling at 3rd room from east
Dec 22, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at 2nd room from east
Dec 22, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 18, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4e, 4th story, 1st apartment from south at west
Dec 18, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from east located at apt 4e, 4th story, 1st apartment from south at west
Dec 18, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from east located at apt 4e, 4th story, 1st apartment from south at west
Dec 18, 2025 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximum of 130 degrees at all hot water fixtures in the entire apartment located at apt 4e, 4th story, 1st apartment from east at south
Dec 9, 2025 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Dec 9, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4e, 4th story, 1st apartment from east at south
Dec 9, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical light fixtures at ceiling at public hall, 4th story
Dec 3, 2025
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 1st room from north located at apt 4e, 4th story, 1st apartment from east at south
Dec 3, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Replace the broken or defective washbasin in the bathroom located at apt 4e, 4th story, 1st apartment from east at south
Dec 3, 2025 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 4th story, 1st apartment from east at south
Dec 3, 2025 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4e, 4th story, 1st apartment from east at south
Dec 3, 2025 · Apt 4E
Closed — Violation dismissed
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed
ECB violations · 8
- Class - 1
Failure to maintain bldg in code compliant manner: @ (4e) in bathroom defective plywood & tile flr approx 16' x 2' collapsed between jois ts causing injury to 1 minor.also ceiling @ apt 3e sheetrock defective
Apr 21, 2012 · Penalty $1,000
Resolve - Class - 1
Occupancy contrary to that allowed by the dob records. hpd records indicate cellar to have a boiler rm and storage. now, there are 4 sros throughout cellar w/a 3 pc kitchen and bathroom. there is an additional
Aug 31, 2011
Resolve - Class - 1
Work w/o permit. work noted: at the cellar, owner has erected partitions from flr to ceiling to create rooms for living. there are 4 sros throughout cellar. there is also a 3 pc watercloset & kitchen. there is
Aug 31, 2011
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner: use of prohibited door and/or hardware per bc 1008. @ apt #2e, tenant has an illegal gate at the fire escape window. there was no padlock at the time of
Mar 23, 2011 · Penalty $250
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved # of families. dob records indicates legal residence as a 8family dwelling. residence is altered for occupancy by 4 sros in
Nov 15, 2007 · Penalty $12,125
Resolve - Hazardous
Failure to maintain interior of bldg. defect: at 4th floor the shower body of apt #4n is defective and broken. when faucets are turned on water does not come out of shower head. the water drains to all floors
Aug 22, 2007 · Penalty $800
Resolve - Hazardous
Resuidence altered for occupancy as a dwelling for more than the legally approved # of families.eight family dwelling altered w/4 sro's in cellar.remedy:discontinue illegal use forthwith/vacate cellar.
Jul 31, 2007 · Penalty $7,550
Resolve - Hazardous
Work w/o a permit.work noted:partitions erected in cellar to create seperate rooms.four sro's created in cellar.remedy:obtain permits & approvals if feasible or restore premises to prior legal conditions.
Jul 31, 2007
Resolve
Complaints
- Unsanitary condition
Pests
Oct 17, 2026 · Apt 4E
Open - Unsanitary condition
Pests
Oct 17, 2026 · Apt 4E
Open - Unsanitary condition
Mold
Oct 15, 2026 · Apt 2E
Open - Plumbing
Basin/sink
Oct 15, 2026 · Apt 2E
Open - Flooring/stairs
Floor
Sep 8, 2026 · Apt 3E
Close - Paint/plaster
Wall
Sep 8, 2026 · Apt 3E
Close - Door/window
Window frame
Sep 8, 2026 · Apt 3E
Close - Unsanitary condition
Pests
Sep 8, 2026 · Apt 3E
Close - Paint/plaster
Wall
Sep 8, 2026 · Apt 3E
Close - Heat/hot water
Entire building
Sep 8, 2026 · Apt 3E
Close
Show 40 more ↓
- Water leak
Heavy flow
Jun 21, 2026 · Apt 3E
Close - Heat/hot water
Entire building
May 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 29, 2026 · Apt 4E
Close - Heat/hot water
Entire building
May 25, 2026 · Apt 4E
Close - Heat/hot water
Apartment only
May 24, 2026 · Apt 2E
Close - Plumbing
Water supply
May 23, 2026 · Apt 3E
Close - Heat/hot water
Entire building
May 8, 2026 · Apt 2E
Close - Heat/hot water
Entire building
Mar 31, 2026 · Apt 1W
Close - Heat/hot water
Apartment only
Feb 26, 2026 · Apt 1W
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 1W
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 4W
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 4E
Close - Heat/hot water
Apartment only
Jan 12, 2026 · Apt 1W
Close - Heat/hot water
Entire building
Dec 29, 2025 · Apt 1W
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt 2E
Close - Water leak
Slow leak
Dec 27, 2025 · Apt 3E
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt 3E
Close - Heat/hot water
Apartment only
Dec 26, 2025 · Apt 1W
Close - Flooring/stairs
Floor
Dec 17, 2025 · Apt 1W
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt 4E
Close - Heat/hot water
Apartment only
Dec 8, 2025 · Apt 4E
Close - Heat/hot water
Apartment only
Dec 6, 2025 · Apt 4E
Close - Plumbing
Water supply
Dec 2, 2025 · Apt 4E
Close - Heat/hot water
Apartment only
Dec 2, 2025 · Apt 4E
Close - Door/window
Door frame
Nov 26, 2025 · Apt 3E
Close - Appliance
Electric/gas range
Nov 26, 2025 · Apt 3E
Close - Unsanitary condition
Pests
Nov 26, 2025 · Apt 3E
Close - Electric
Outlet/switch
Nov 26, 2025 · Apt 3E
Close - Unsanitary condition
Pests
Nov 26, 2025 · Apt 3E
Close - Appliance
Refrigerator
Nov 26, 2025 · Apt 3E
Close - Heat/hot water
Entire building
Nov 26, 2025 · Apt 3E
Close - Plumbing
Basin/sink
Nov 26, 2025 · Apt 3E
Close - Door/window
Door
Nov 26, 2025 · Apt 3E
Close - Paint/plaster
Wall
Nov 26, 2025 · Apt 3E
Close - Paint/plaster
Ceiling
Nov 10, 2025 · Apt 3E
Close - Appliance
Electric/gas range
Nov 10, 2025 · Apt 3E
Close - Paint/plaster
Wall
Nov 10, 2025 · Apt 3E
Close - Door/window
Door
Nov 10, 2025 · Apt 3E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1931
- Floors
- 4
- Residential units
- 10
- Building area
- 7,800 ft²
- Lot area
- 2,500 ft²
- Zoning
- R7-2
- Community board
- 203
- Council district
- 17
- Block / lot
- 2383 / 17
- Assessed value
- $583,650
- Landmark / historic district
- No
HPD registration #211540, last renewed Oct 3, 2025.
Questions about 428 East 162 Street
Who owns 428 East 162 Street?
The owner of record in NYC Department of City Planning PLUTO data is 428 Partners LLC.
Does 428 East 162 Street have violations?
Yes. NYC HPD has recorded 458 housing violations at this property.
Is 428 East 162 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 428 East 162 Street built?
City records list 1931 as the year it was built.
How many apartments are in 428 East 162 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.