425 East 161 Street
Bronx, NY 10451BBL 2-02383-0039Map
Owner of record: Melrose Commons Supportive Housing Devel Opment
425 East 161 Street is a hotel built in 2017 in Bronx, 10451. The owner of record is Melrose Commons Supportive Housing Devel Opment. HPD has recorded 8 housing violations here, most recently on April 2, 2025. City tax records listed 59 rent-stabilized apartments here in 2024.
- HPD violations
- 8
- DOB violations
- 8
- ECB violations
- 4
- HPD complaints
- 49
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 8
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 6h, 6th story, 1st apartment from south at west
Apr 2, 2025 · Apt 6H
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame improperly installed , 1st story
Sep 23, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 8b, 8th story, 1st apartment from south at west
Sep 14, 2021 · Apt 8B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl tile at floor in the kitchen located at apt 8b, 8th story, 1st apartment from east at south
Jul 15, 2021 · Apt 8B
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 20, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 8b, 8th story, 1st apartment from east at south
Mar 27, 2021 · Apt 8B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all ceilings and all walls in the entire apartment located at apt 8b, 8th story, 1st apartment from east at south
Mar 15, 2021 · Apt 8B
Closed — Violation dismissed
DOB building violations · 8
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 11, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 11, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 25, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 25, 2019
Dob violation - resolved
ECB violations · 4
- Class - 2
Failure 2 class rts to maintain building in code compliant manner. upon inspection, the device is found to be out of service. remedy: restore to service and contact the dob elevator division at elevatorir@build
Aug 26, 2026 · Penalty $625
Active - Class - 2
Failure 2 class rts to maintain building in code compliant manner. upon inspection, the device is found to be out of service. remedy: restore to service and contact the dob elevator division at elevatorir@build
Jul 21, 2026 · Penalty $655
Active - Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #917711. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $2,530
Active - Class - 2
02-x-10, 68-b-07, 68-b-07, 61-t-07, 59-bb-05.(02) repair two-way comminication(68) missing mcp(68) update maint log (61) provide maint company(59)expired brake maint tag.
Jul 24, 2019
Resolve
Complaints
- Paint/plaster
Wall
Mar 11, 2025 · Apt 6H
Close - Unsanitary condition
Mold
Mar 11, 2025 · Apt 6H
Close - General
Cabinet
Mar 11, 2025 · Apt 6H
Close - Paint/plaster
Wall
Mar 11, 2025 · Apt 6H
Close - Unsanitary condition
Pests
Oct 28, 2024 · Apt 6H
Close - Paint/plaster
Ceiling
Oct 28, 2024 · Apt 6H
Close - Paint/plaster
Wall
Oct 28, 2024 · Apt 6H
Close - Unsanitary condition
Pests
Sep 2, 2024 · Apt 6H
Close - Plumbing
Toilet
Apr 27, 2024 · Apt 4E
Close - Unsanitary condition
Pests
Nov 18, 2023 · Apt 68
Close
Show 39 more ↓
- Paint/plaster
Wall
Nov 18, 2023 · Apt 68
Close - Unsanitary condition
Pests
Nov 18, 2023 · Apt 6H
Close - Unsanitary condition
Pests
Feb 21, 2023 · Apt 5H
Close - Unsanitary condition
Pests
May 10, 2022 · Apt 6H
Close - Unsanitary condition
Pests
May 10, 2022 · Apt 6H
Close - Flooring/stairs
Floor
Sep 28, 2021 · Apt 8B
Open - Unsanitary condition
Mold
Sep 28, 2021 · Apt 8B
Open - Flooring/stairs
Floor
Sep 28, 2021 · Apt 8B
Open - Flooring/stairs
Floor
Sep 28, 2021 · Apt 8B
Open - Flooring/stairs
Floor
Sep 6, 2021 · Apt 8B
Close - Unsanitary condition
Mold
Sep 3, 2021 · Apt 8B
Close - Flooring/stairs
Floor
Sep 3, 2021 · Apt 8B
Close - Flooring/stairs
Floor
Sep 3, 2021 · Apt 8B
Close - Unsanitary condition
Pests
Aug 19, 2021 · Apt 2C
Close - Unsanitary condition
Mold
Jul 11, 2021 · Apt 8B
Close - Flooring/stairs
Floor
Jul 8, 2021 · Apt 8B
Close - Unsanitary condition
Mold
Jul 8, 2021 · Apt 8B
Close - Flooring/stairs
Floor
Jul 7, 2021 · Apt 8B
Close - Unsanitary condition
Mold
Jul 7, 2021 · Apt 8B
Close - Unsanitary condition
Mold
Jul 6, 2021 · Apt 8B
Close - Heat/hot water
Apartment only
Jun 17, 2021 · Apt 8D
Close - Paint/plaster
Ceiling
Apr 15, 2021 · Apt 8B
Close - Paint/plaster
Wall
Apr 15, 2021 · Apt 8B
Close - Flooring/stairs
Floor
Apr 15, 2021 · Apt 8B
Close - Unsanitary condition
Mold
Apr 15, 2021 · Apt 8B
Close - Unsanitary condition
Mold
Apr 12, 2021 · Apt 8B
Close - Unsanitary condition
Mold
Apr 8, 2021 · Apt 8B
Open - Paint/plaster
Ceiling
Mar 24, 2021 · Apt 8B
Close - Flooring/stairs
Floor
Mar 24, 2021 · Apt 8B
Close - Unsanitary condition
Mold
Mar 24, 2021 · Apt 8B
Close - Paint/plaster
Ceiling
Mar 17, 2021 · Apt 8B
Close - Unsanitary condition
Mold
Mar 17, 2021 · Apt 8B
Close - Flooring/stairs
Floor
Mar 10, 2021 · Apt 8B
Close - Paint/plaster
Ceiling
Mar 10, 2021 · Apt 8B
Close - Unsanitary condition
Mold
Mar 10, 2021 · Apt 8B
Close - Unsanitary condition
Mold
Mar 3, 2021 · Apt 8B
Close - Unsanitary condition
Mold
Mar 2, 2021 · Apt 8B
Close - Water leak
Slow leak
Sep 30, 2020 · Apt 6H
Close - Water leak
Heavy flow
Sep 30, 2020 · Apt 6H
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H6)
- Year built
- 2017
- Floors
- 9
- Residential units
- —
- Building area
- 35,356 ft²
- Lot area
- 6,097 ft²
- Zoning
- R8
- Community board
- 203
- Council district
- 17
- Block / lot
- 2383 / 39
- Assessed value
- $2,760,300
- Landmark / historic district
- No
HPD registration #227843, last renewed Mar 31, 2026.
Questions about 425 East 161 Street
Who owns 425 East 161 Street?
The owner of record in NYC Department of City Planning PLUTO data is Melrose Commons Supportive Housing Devel Opment.
Does 425 East 161 Street have violations?
Yes. NYC HPD has recorded 8 housing violations at this property.
Is 425 East 161 Street rent stabilized?
NYC Department of Finance tax bills listed 59 rent-stabilized units here in 2024. To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 425 East 161 Street built?
City records list 2017 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.