2809 3 Avenue
Bronx, NY 10455BBL 2-02327-0022Map
Owner of record: 2809 Third Realty LLC
2809 3 Avenue is a mixed residential and retail building built in 1905 in Bronx, 10455. It has 6 residential units across 4 floors. The owner of record is 2809 Third Realty LLC. HPD has recorded 141 housing violations here, most recently on September 13, 2026. 47 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 141
- DOB violations
- 17
- ECB violations
- 2
- HPD complaints
- 154
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 141
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 3rd story balcony north exterior wall building front
Sep 13, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective erroded bricks and motar joints at south exterior parpet wall
Apr 25, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective celing light fixture at vestibule
Apr 25, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Apr 25, 2026
Open — Nov sent out - CImmediately hazardous
Properly secure the loose light fixture (with a fan) at ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective sash lock at lower window sash loose at south wall at public hall, 2nd story
Apr 25, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective broken ceramic tiles at west wall (vestibule)
Apr 25, 2026
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Apr 25, 2026
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at observed live rats and dropping at building front
Apr 25, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage bags piled up against building front wall at east of the entrance door
Apr 25, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent material at vestibule at ceiling
Apr 25, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox signage missing at public hall, 1st story
Apr 25, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 25, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at floor at public hall, 1st story
Apr 25, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling at public hall, 2nd story
Apr 25, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent material at all walls and ceiling at public hall, 2nd story
Apr 25, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at floor at public hall, 2nd story
Apr 25, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing (if installed on wall must be 4'' to 12'' from ceiling- if on ceiling must be 4'' from wall) in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing (if installed on wall must be 4'' to 12'' from ceiling- if on ceiling must be 4'' from wall) in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective leak at air valve releasing steam in the 3rd room from north located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden sub floor sagging in the 3rd room from north located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 3rd room from north located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration accoustical drop ceiling installled. in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of cracked vinyl tiles at floor (creating a trip hazard) in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective entrance door knob in the 2nd room from east located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door
Apr 25, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from north located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch and it's assembly at vestibule door
Apr 25, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2026 · Apt 2
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 2, 2nd story, 2nd apartment from south at west
Mar 3, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly secure the loose ceiling fan / light fixture at ceiling in the 2nd room from east located at apt 2, 2nd story, 2nd apartment from south at west
Mar 3, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2, 2nd story, 2nd apartment from south at west
Mar 3, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2, 2nd story, 2nd apartment from south at west
Mar 3, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations deffective in the entire apartment located at apt 2, 2nd story, 2nd apartment from south at west
Mar 3, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules deffective in the entire apartment located at apt 2, 2nd story, 2nd apartment from south at west
Mar 3, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees at all water fixtures in the entire apartment located at apt 2, 2nd story, 2nd apartment from south at west
Mar 3, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 2nd apartment from south at west
Mar 3, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 2nd story, 1st apartment from west at north
Mar 3, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the 2nd room from east located at apt 2, 2nd story, 2nd apartment from south at west
Mar 3, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling acoustic panels throughout in the kitchen located at apt 2, 2nd story, 2nd apartment from south at west
Mar 3, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 3, 2026
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees at all water fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from west at north
Mar 3, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock and assembly at building vestibule door , 1st story
Mar 3, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building vestibule door , 1st story
Mar 3, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective air valve at radiator ( leaking) in the 3rd room from east located at apt 6, 4th story, 1st apartment from west at north
Jan 9, 2026 · Apt 6
Open — Nov sent out
DOB building violations · 17
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Electric signs none
Es-electric signs none
Jan 13, 1994
Dob violation - dismissed
Show 7 more ↓
- Electric signs none
Es-electric signs none
Jan 13, 1994
Dob violation - dismissed - Electric signs none
Es-electric signs none
Jan 13, 1994
Dob violation - dismissed - Electric signs none
Es-electric signs none
Jan 13, 1994
Dob violation - dismissed - Electric signs none
Es-electric signs none
Jan 13, 1994
Dob violation - active - Electric signs none
Es-electric signs none
Jan 13, 1994
Dob violation - active - Electric signs none
Es-electric signs none
Jan 13, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 2
- Class - 2
Failure to maintain building wall(s) or appurtenances.noted:observed at corner's single row of windows,spider cracks above second story window and bleow third story,third story window still has cracked in the m
May 28, 2021 · Penalty $1,250
Active - Class - 2
Failure to maintain bldg in code compliant manner. approx 15'ft of awning had broke off & was on sidewalk in front of business (blimple) remedy: comply w/notice of violation.
Nov 22, 2016
Resolve
Complaints
- General
Janitor/super
Jul 7, 2026 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Jul 7, 2026 · Apt 1
Close - Paint/plaster
Ceiling
Apr 21, 2026 · Apt 2
Close - Paint/plaster
Ceiling
Apr 21, 2026 · Apt 2
Close - Appliance
Electric/gas range
Apr 21, 2026 · Apt 2
Close - Paint/plaster
Ceiling
Apr 21, 2026 · Apt 2
Close - Electric
Outlet/switch
Apr 21, 2026 · Apt 2
Close - Water leak
Damp spot
Apr 21, 2026 · Apt 2
Close - Water leak
Heavy flow
Apr 21, 2026 · Apt 2
Close - Water leak
Slow leak
Mar 17, 2026 · Apt 2
Close
Show 40 more ↓
- Heat/hot water
Entire building
Mar 4, 2026 · Apt BUILDI
Close - Water leak
Slow leak
Mar 2, 2026 · Apt 2
Close - Paint/plaster
Wall
Mar 2, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 2
Close - Heat/hot water
Entire building
Feb 28, 2026 · Apt 1
Close - Water leak
Heavy flow
Feb 24, 2026 · Apt 2
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt BLDG
Close - Appliance
Refrigerator
Jan 5, 2026 · Apt 6
Close - Unsanitary condition
Pests
Jan 5, 2026 · Apt 6
Close - Plumbing
Radiator
Jan 5, 2026 · Apt 6
Close - Door/window
Door
Jan 5, 2026 · Apt 6
Close - Plumbing
Bathtub/shower
Jan 5, 2026 · Apt 6
Close - General
Mailbox
Jan 5, 2026 · Apt 6
Close - Appliance
Electric/gas range
Jan 5, 2026 · Apt 6
Close - Unsanitary condition
Mold
Jan 5, 2026 · Apt 6
Close - General
Bell/buzzer/intercom
Jan 5, 2026 · Apt 6
Close - Appliance
Refrigerator
Dec 11, 2025 · Apt 6
Close - Appliance
Electric/gas range
Dec 11, 2025 · Apt 6
Close - Appliance
Electric/gas range
Dec 11, 2025 · Apt 6
Close - Unsanitary condition
Pests
Dec 11, 2025 · Apt 6
Close - Unsanitary condition
Mold
Dec 11, 2025 · Apt 6
Close - Plumbing
Steam pipe/riser
Dec 11, 2025 · Apt 6
Close - Plumbing
Bathtub/shower
Dec 11, 2025 · Apt 6
Close - Unsanitary condition
Pests
Dec 11, 2025 · Apt 6
Close - Appliance
Refrigerator
Oct 17, 2025 · Apt 6
Close - Appliance
Electric/gas range
Oct 17, 2025 · Apt 6
Close - Unsanitary condition
Pests
Oct 17, 2025 · Apt 6
Close - Plumbing
Bathtub/shower
Oct 17, 2025 · Apt 6
Close - Plumbing
Bathtub/shower
Aug 6, 2025 · Apt 6
Close - Appliance
Refrigerator
Aug 6, 2025 · Apt 6
Close - Appliance
Electric/gas range
Aug 6, 2025 · Apt 6
Close - Electric
Outlet/switch
Aug 6, 2025 · Apt 6
Close - Plumbing
Water supply
Aug 6, 2025 · Apt 6
Close - Heat/hot water
Entire building
May 7, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
May 6, 2025 · Apt 2
Close - Heat/hot water
Entire building
May 3, 2025 · Apt 1
Close - Door/window
Door
Jan 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2024 · Apt 1
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S5)
- Year built
- 1905
- Floors
- 4
- Residential units
- 6
- Building area
- 7,248 ft²
- Lot area
- 1,943 ft²
- Zoning
- R6
- Community board
- 201
- Council district
- 8
- Block / lot
- 2327 / 22
- Assessed value
- $520,650
- Landmark / historic district
- No
HPD registration #210668, last renewed Aug 18, 2023.
Questions about 2809 3 Avenue
Who owns 2809 3 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2809 Third Realty LLC.
Does 2809 3 Avenue have violations?
Yes. NYC HPD has recorded 141 housing violations at this property.
Is 2809 3 Avenue rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2809 3 Avenue built?
City records list 1905 as the year it was built.
How many apartments are in 2809 3 Avenue?
It has 6 residential units and 7 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.