Bruckner Boulevard
Bronx, NY 10454BBL 2-02278-0070Map
Owner of record: Arw Realty LLC
Bruckner Boulevard is an elevator apartment building built in 2020 in Bronx, 10454. It has 55 residential units across 7 floors. The owner of record is Arw Realty LLC. HPD has recorded 49 housing violations here, most recently on June 23, 2026. 3 of the 49 most recent violations are still open. City tax records listed 18 rent-stabilized apartments here in 2024.
- HPD violations
- 49
- DOB violations
- 2
- ECB violations
- 8
- HPD complaints
- 105
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 49
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6f, 6th story, 4th apartment from east at south
Jun 23, 2026 · Apt 6F
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6f, 6th story, 4th apartment from east at south
Jun 23, 2026 · Apt 6F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ptec heating system in the 3rd room from north located at apt 6i, 6th story, 1st apartment from north at east
Mar 1, 2026 · Apt 6I
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees at all water fixtures in the entire apartment located at apt 6i, 6th story, 1st apartment from north at east
Mar 1, 2026 · Apt 6I
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3h, 3rd story, 2nd apartment from east at south
Jan 21, 2026 · Apt 3H
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 3h, 3rd story, 2nd apartment from east at south
Jan 21, 2026 · Apt 3H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 3h, 3rd story, 2nd apartment from east at south
Jan 21, 2026 · Apt 3H
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective heating unit at south wall in the 1st room from east at north located at apt 3h, 3rd story, 2nd apartment from east at south
Jan 21, 2026 · Apt 3H
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective heating unit at south wall in the 1st room from east at south located at apt 3h, 3rd story, 2nd apartment from east at south
Jan 21, 2026 · Apt 3H
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at ... in the entrance located at apt 3h, 3rd story, 2nd apartment from east at south
Jan 21, 2026 · Apt 3H
Closed — Violation dismissed
Show 39 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3h, 3rd story, 2nd apartment from east at south
Jan 21, 2026 · Apt 3H
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from east located at apt 2e, 2nd story, 1st apartment from west at north
Oct 24, 2025 · Apt 2E
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 2nd room from east located at apt 2e, 2nd story, 1st apartment from west at north
Oct 24, 2025 · Apt 2E
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 2e, 2nd story, 1st apartment from west at north
Oct 24, 2025 · Apt 2E
Closed — Violation dismissed - BHazardous
Provide security in case of power outage by means of mechanical heavy duty lock and latch set at building entrance door , 1st story
Oct 24, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2e, 2nd story, 1st apartment from west at north
Oct 24, 2025 · Apt 2E
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east located at apt 7e, 7th story, 2nd apartment from west at north
Jul 9, 2025 · Apt 7E
Open — Not complied with - ANon-hazardous
Properly repair or replace the broken or defective upper cabinet door at south wall in the kitchenette located at apt 7e, 7th story, 2nd apartment from west at north
Jul 9, 2025 · Apt 7E
Open — Not complied with - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchenette located at apt 7e, 7th story, 2nd apartment from west at north
Jul 9, 2025 · Apt 7E
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective electrical outlet at eastwall in the kitchenette located at apt 7b, 7th story, 5th apartment from west at north
Jul 9, 2025 · Apt 7B
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 7b, 7th story, 5th apartment from west at north
Jul 9, 2025 · Apt 7B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective (hinge) at door in the entrance located at apt 2e, 2nd story, 1st apartment from west at north
Mar 25, 2025 · Apt 2E
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste line at washbasin in the bathroom located at apt 7b, 7th story, 4th apartment from north at east
Mar 24, 2025 · Apt 7B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2e, 2nd story, 1st apartment from west at north
Jan 24, 2025 · Apt 2E
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of vinyl floor tiles (raising up) at floor in the 3rd room from east located at apt 2e, 2nd story, 1st apartment from west at north
Jan 24, 2025 · Apt 2E
Closed — Violation dismissed - ANon-hazardous
M/d law abate the nuisance consisting of torn vinyl floor tiles in the kitchen located at apt 5f, 5th story, 4th apartment from south at west
Nov 15, 2024 · Apt 5F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective hvac heating split unit in the 2nd room from north located at apt 5f, 5th story, 4th apartment from south at west
Nov 15, 2024 · Apt 5F
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 7b, 7th story, 6th apartment from north at east
Jun 12, 2024 · Apt 7B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at the south wall in the kitchen located at apt 7b, 7th story, 6th apartment from north at east
Jun 12, 2024 · Apt 7B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechainical ventilation fan at ceiling in the bathroom located at apt 2f, 2nd story, 4th apartment from east at south
Sep 30, 2023 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable two-motion electromagnetic locking device installed at building entrance door (street to 1st story public hall) at public hall, 1st story
Sep 30, 2023
Closed — Violation dismissed - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lockset at the building entrance door (street to 1st story public hall) at public hall, 1st story
Sep 30, 2023
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west and south walls in the 1st room from east located at apt 2g, 2nd story, 3rd apartment from east at south
Aug 29, 2023 · Apt 2G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north and south walls in the 2nd room from east located at apt 2g, 2nd story, 3rd apartment from east at south
Aug 29, 2023 · Apt 2G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2g, 2nd story, 3rd apartment from east at south
Aug 29, 2023 · Apt 2G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st bathroom from east at center located at apt 2g, 2nd story, 3rd apartment from east at south
May 31, 2023 · Apt 2G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the 1st room from east located at apt 2g, 2nd story, 3rd apartment from east at south
May 31, 2023 · Apt 2G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from east located at apt 2g, 2nd story, 3rd apartment from east at south
May 31, 2023 · Apt 2G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 2g, 2nd story, 3rd apartment from east at south
May 31, 2023 · Apt 2G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 3rd room from east located at apt 2g, 2nd story, 3rd apartment from east at south
May 31, 2023 · Apt 2G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the foyer located at apt 2g, 2nd story, 3rd apartment from east at south
May 31, 2023 · Apt 2G
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the foyer located at apt 2g, 2nd story, 3rd apartment from east at south
May 31, 2023 · Apt 2G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the 3rd room from east located at apt 2g, 2nd story, 3rd apartment from east at south
May 31, 2023 · Apt 2G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2g, 2nd story, 3rd apartment from east at south
May 31, 2023 · Apt 2G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the 2nd room from east located at apt 2g, 2nd story, 3rd apartment from east at south
May 31, 2023 · Apt 2G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, west wall in the 1st room from east located at apt 2g, 2nd story, 3rd apartment from east at south
May 31, 2023 · Apt 2G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st bathroom from east at center located at apt 2g, 2nd story, 3rd apartment from east at south
May 31, 2023 · Apt 2G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south, east and west walls in the 1st room from east located at apt 2g, 2nd story, 3rd apartment from east at south
May 30, 2023 · Apt 2G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 3rd room from east located at apt 2g, 2nd story, 3rd apartment from east at south
May 30, 2023 · Apt 2G
Closed — Violation closed
DOB building violations · 2
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed
ECB violations · 8
- Class - 1
Failure to communicate site specific hazards during pre-shift safety meeting.at time of inspection on a proposed 7 story new building currently in finishing stages observed aprox workers on site engating in va
Jun 2, 2021 · Penalty $1,250
Resolve - Class - 2
Construction superintendent failed to do duties per code.at time of inspection of a 7 story new building in finishing stages observed aprox 7 workers on site.upon request for designated competent person 'salvad
Jun 2, 2021 · Penalty $2,500
Resolve - Class - 1
Bc 3303.4.1 slipping and tripping hazard.at time of inspection i observed an active construction site with steel of concrete in progress,during inspection noted on the 5 floor electrical cable on the ground can
Dec 1, 2020
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments.at time of inspection i observed an active construction site with steel work of converted in progress.during inspection noted
Dec 1, 2020
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments.at time of inpsection i observed an active construction site with steel of concrete work in progress.during inspection noted a
Dec 1, 2020
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.at time of inspection i observed an active construction site with steel of concrete work in progress.during inspection note of various location
Dec 1, 2020
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments site safety plans.at time of inspection observed an active construction site with steel work of concrete in progress.during in
Dec 1, 2020
Resolve - Class - 2
Jobsite fence not constructed & maintained pursuant to subsection.at time of inspection i observed an active construction site with steel ofconcrete work in progress.during inspection noted at exposure#3 there
Dec 1, 2020
Resolve
Complaints
- Water leak
Heavy flow
Oct 19, 2026 · Apt 3B
Open - Heat/hot water
Entire building
Oct 9, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Aug 17, 2026 · Apt 4H
Close - Heat/hot water
Entire building
Aug 16, 2026 · Apt BLDG
Close - Plumbing
Radiator
Aug 6, 2026 · Apt 5F
Close - General
Ventilation system
Jul 6, 2026 · Apt 5F
Close - Heat/hot water
Apartment only
Jun 23, 2026 · Apt 6F
Close - General
Ventilation system
May 21, 2026 · Apt 2H
Close - Electric
Power outage
May 21, 2026 · Apt 2H
Close - Heat/hot water
Apartment only
May 20, 2026 · Apt 6I
Close
Show 40 more ↓
- General
Ventilation system
May 5, 2026 · Apt 2H
Close - Unsanitary condition
Garbage/recycling storage
Mar 17, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Mar 15, 2026 · Apt 4E
Close - Heat/hot water
Apartment only
Feb 27, 2026 · Apt 6I
Close - Heat/hot water
Apartment only
Feb 21, 2026 · Apt 6I
Close - Heat/hot water
Apartment only
Feb 21, 2026 · Apt 6I
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Electric
Power outage
Jan 21, 2026 · Apt 6B
Close - Heat/hot water
Apartment only
Jan 20, 2026 · Apt 3B
Close - Electric
No lighting
Jan 20, 2026 · Apt 3B
Close - Appliance
Electric/gas range
Jan 20, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Jan 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 19, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 4, 2026 · Apt 6I
Close - Heat/hot water
Entire building
Jan 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 1, 2026 · Apt 3H
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Door/window
Door
Jan 1, 2026 · Apt 3H
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt BLDG
Close - Unsanitary condition
Sewage
Dec 11, 2025 · Apt 2E
Close - General
Janitor/super
Dec 11, 2025 · Apt 2E
Close - Unsanitary condition
Sewage
Dec 10, 2025 · Apt 2E
Close - Unsanitary condition
Sewage
Dec 10, 2025 · Apt 2E
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2025 · Apt BLDG
Close - Door/window
Door
Oct 17, 2025 · Apt 7F
Close - Flooring/stairs
Floor
Sep 23, 2025 · Apt 2E
Close - Flooring/stairs
Floor
Sep 23, 2025 · Apt 2E
Close - Paint/plaster
Door/frame
Sep 23, 2025 · Apt 2E
Close - Door/window
Door
Sep 23, 2025 · Apt 2E
Close - Paint/plaster
Wall
Sep 23, 2025 · Apt 2E
Close - Water leak
Heavy flow
Aug 15, 2025 · Apt APT3C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2020
- Floors
- 7
- Residential units
- 55
- Building area
- 44,482 ft²
- Lot area
- 12,500 ft²
- Zoning
- M1-2/R6A
- Community board
- 201
- Council district
- 8
- Block / lot
- 2278 / 70
- Assessed value
- $3,960,000
- Landmark / historic district
- No
HPD registration #228363, last renewed Oct 29, 2025.
Questions about Bruckner Boulevard
Who owns Bruckner Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Arw Realty LLC.
Does Bruckner Boulevard have violations?
Yes. NYC HPD has recorded 49 housing violations at this property.
Is Bruckner Boulevard rent stabilized?
NYC Department of Finance tax bills listed 18 rent-stabilized units here in 2024 (about 33% of its 55 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was Bruckner Boulevard built?
City records list 2020 as the year it was built.
How many apartments are in Bruckner Boulevard?
It has 55 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.