23 Vermilyea Avenue
Manhattan, NY 10034BBL 1-02224-0011Map
Owner of record: Vermilyea Street Associates LLC
23 Vermilyea Avenue is a walk-up apartment building built in 1922 in Manhattan, 10034. It has 21 residential units across 5 floors. The owner of record is Vermilyea Street Associates LLC. HPD has recorded 420 housing violations here, most recently on August 29, 2026. 29 of the 50 most recent violations are still open. City tax records listed 20 rent-stabilized apartments here in 2024.
- HPD violations
- 420
- DOB violations
- 5
- ECB violations
- 0
- HPD complaints
- 287
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 420
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 1st story, 1st apartment from north at east
Aug 29, 2026 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Properly secure the loose light fixture at ceiling in the private hallway located at apt 3, 1st story, 1st apartment from north at east
Aug 29, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall and ceiling in the private hallway located at apt 3, 1st story, 1st apartment from north at east
Aug 29, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the bathroom located at apt 3, 1st story, 1st apartment from north at east
Aug 29, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall and ceiling in the 1st room from east at south located at apt 3, 1st story, 1st apartment from north at east
Aug 29, 2026 · Apt 3
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall and ceiling in the 1st room from east at south located at apt 3, 1st story, 1st apartment from north at east
Aug 29, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from east at north located at apt 3, 1st story, 1st apartment from north at east
Aug 29, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 33, 3rd story, 1st apartment from east at south
Jan 1, 2026 · Apt 33
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 33, 3rd story, 1st apartment from east at south
Jan 1, 2026 · Apt 33
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from east at south wall in the 3rd room from north at west located at apt 33, 3rd story, 1st apartment from east at south
Jan 1, 2026 · Apt 33
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 33, 3rd story, 1st apartment from east at south
Jan 1, 2026 · Apt 33
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 33, 3rd story, 1st apartment from east at south
Jan 1, 2026 · Apt 33
Open — Notice of issuance sent to tenant - BHazardous
Properly secure the loose wash basin cabinet in the bathroom located at apt 33, 3rd story, 1st apartment from east at south
Jan 1, 2026 · Apt 33
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at baseboard at south wall in the 3rd room from north at west located at apt 33, 3rd story, 1st apartment from east at south
Jan 1, 2026 · Apt 33
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 3rd room from north at west located at apt 33, 3rd story, 1st apartment from east at south
Jan 1, 2026 · Apt 33
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 33, 3rd story, 1st apartment from north at east
Oct 6, 2025 · Apt 33
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at door in the entrance located at apt 33, 3rd story, 1st apartment from north at east
Oct 6, 2025 · Apt 33
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 33, 3rd story, 1st apartment from north at east
Oct 6, 2025 · Apt 33
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective washbasin cabinet in the bathroom located at apt 33, 3rd story, 1st apartment from north at east
Oct 6, 2025 · Apt 33
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door to boiler room locked at basement
Oct 6, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 33, 3rd story, 1st apartment from north at east
Oct 6, 2025 · Apt 33
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt apt2, 1st story, 1st apartment from north at east
Sep 30, 2025 · Apt APT2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt apt2, 1st story, 1st apartment from north at east
Sep 30, 2025 · Apt APT2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt apt2, 1st story, 1st apartment from north at east
Sep 30, 2025 · Apt APT2
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bicycle under the staircase at public hall, 1st story
Nov 6, 2024
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 5 sq ft at north wall approx 10 sq ft at east wall in the bathroom located at apt 33, 3rd story, 1st apartment from east at south
May 2, 2024 · Apt 33
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 23, 2nd story, 2nd apartment from east at south
Jul 20, 2023 · Apt 23
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ' in the entrance located at apt 2, 1st story, 1st apartment from south at west
Jul 20, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 1st story, 1st apartment from south at west
Jul 20, 2023 · Apt 2
Open — Not complied with - ANon-hazardous
Paint metal in accordance with dept. regulation the steam riser. in the bathroom located at apt 23, 2nd story, 1st apartment from north at east
Mar 7, 2023 · Apt 23
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing eschutchen plate heat riser at ceiling. in the bathroom located at apt 23, 2nd story, 1st apartment from north at east
Mar 7, 2023 · Apt 23
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze of the bathtub in the bathroom located at apt 23, 2nd story, 1st apartment from north at east
Mar 7, 2023 · Apt 23
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 23, 2nd story, 1st apartment from north at east
Mar 7, 2023 · Apt 23
Open — Violation will be reinspected - BHazardous
Properly repair the broken or defective electrical outlet at west wall in the kitchen located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall in the 2nd room from north at west located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame in the foyer located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame in the 1st private hallway from north located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from west at north wall door, 2nd closet from west at north wall door, 1st door from south at west wall in the 3rd room from north at east located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at west located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall in the bathroom located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from north at east wall in the 2nd room from north at west located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at 1st closet from north at east wall door in the foyer located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from east at south wall door in the 1st private hallway from north located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east wall in the kitchen located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Open — Not complied with - BHazardous
Properly repair the broken or defective upper sash window spring balance at south wall in the 3rd room from north at west located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 3rd room from north at west located at apt 33, 3rd story, 1st apartment from east at south
Jan 24, 2023 · Apt 33
Closed — Violation closed
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Paint/plaster
Ceiling
Aug 17, 2026 · Apt 3
Close - Door/window
Window frame
Aug 17, 2026 · Apt 3
Close - Plumbing
Bathtub/shower
Aug 17, 2026 · Apt 3
Close - Paint/plaster
Wall
Aug 17, 2026 · Apt 3
Close - Door/window
Door frame
Mar 30, 2026 · Apt APARTM
Close - Door/window
Door
Mar 30, 2026 · Apt APARTM
Close - Unsanitary condition
Pests
Mar 30, 2026 · Apt APARTM
Close - Door/window
Door
Mar 30, 2026 · Apt APARTM
Close - Unsanitary condition
Sewage
Mar 30, 2026 · Apt APARTM
Close - Plumbing
Basin/sink
Dec 17, 2025 · Apt 33
Close
Show 40 more ↓
- Unsanitary condition
Pests
Dec 17, 2025 · Apt 33
Close - Water leak
Slow leak
Dec 17, 2025 · Apt 33
Close - Appliance
Refrigerator
Dec 17, 2025 · Apt 33
Close - Plumbing
Toilet
Dec 17, 2025 · Apt 33
Close - Heat/hot water
Entire building
Oct 6, 2025 · Apt 54
Close - Plumbing
Water supply
Oct 6, 2025 · Apt 54
Close - Heat/hot water
Apartment only
Oct 5, 2025 · Apt 22
Close - Plumbing
Toilet
Sep 29, 2025 · Apt APT2
Close - Heat/hot water
Apartment only
Sep 29, 2025 · Apt APT2
Close - Heat/hot water
Entire building
Dec 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 5, 2024 · Apt 22
Close - General
Signage missing
Jun 29, 2024 · Apt BLDG
Close - Appliance
Electric/gas range
Mar 17, 2023 · Apt 21
Close - General
Cooking gas
Mar 3, 2023 · Apt 21
Close - General
Cooking gas
Mar 3, 2023 · Apt BLDG
Close - General
Cooking gas
Feb 27, 2023 · Apt BLDG
Close - Electric
Outlet/switch
Jan 21, 2023 · Apt 33
Close - Water leak
Damp spot
Jan 21, 2023 · Apt 33
Close - Door/window
Window frame
Jan 21, 2023 · Apt 33
Close - General
Cooking gas
Jan 21, 2023 · Apt BLDG
Close - Door/window
Door
Jan 5, 2023 · Apt 42
Close - Unsanitary condition
Pests
Jan 5, 2023 · Apt 33
Close - Unsanitary condition
Mold
Jan 5, 2023 · Apt 33
Close - Door/window
Door
Jan 5, 2023 · Apt 32
Close - Door/window
Door
Jan 5, 2023 · Apt 23
Close - Unsanitary condition
Mold
Jan 5, 2023 · Apt 23
Close - Safety
Smoke detector
Jan 5, 2023 · Apt 21
Close - Safety
Carbon monoxide detector
Jan 5, 2023 · Apt 21
Close - Unsanitary condition
Garbage/recycling storage
Jan 5, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 5, 2023 · Apt BLDG
Close - Safety
Window guard broken/missing
Jun 30, 2021 · Apt 51
Close - Safety
Smoke detector
Jun 30, 2021 · Apt 51
Close - Safety
Carbon monoxide detector
Jun 30, 2021 · Apt 51
Close - Water leak
Slow leak
Jun 24, 2021 · Apt 3
Close - Unsanitary condition
Pests
Jun 24, 2021 · Apt 33
Close - Unsanitary condition
Pests
Jun 24, 2021 · Apt 2
Close - Unsanitary condition
Pests
Jun 24, 2021 · Apt 2
Close - Door/window
Door
Jun 24, 2021 · Apt 2
Close - Safety
Smoke detector
Jun 24, 2021 · Apt 2
Close - Safety
Carbon monoxide detector
Jun 24, 2021 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1922
- Floors
- 5
- Residential units
- 21
- Building area
- 22,650 ft²
- Lot area
- 7,500 ft²
- Zoning
- R7A
- Community board
- 112
- Council district
- 10
- Block / lot
- 2224 / 11
- Assessed value
- $435,150
- Landmark / historic district
- No
HPD registration #100210, last renewed Sep 22, 2025.
Questions about 23 Vermilyea Avenue
Who owns 23 Vermilyea Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Vermilyea Street Associates LLC.
Does 23 Vermilyea Avenue have violations?
Yes. NYC HPD has recorded 420 housing violations at this property.
Is 23 Vermilyea Avenue rent stabilized?
NYC Department of Finance tax bills listed 20 rent-stabilized units here in 2024 (about 95% of its 21 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 23 Vermilyea Avenue built?
City records list 1922 as the year it was built.
How many apartments are in 23 Vermilyea Avenue?
It has 21 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.