153 Sherman Avenue

Manhattan, NY 10034BBL 1-02221-0005Map

Owner of record: Tep Charter School Assistance, INC.

153 Sherman Avenue is a school building built in 2016 in Manhattan, 10034. The owner of record is Tep Charter School Assistance, INC.. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
12
ECB violations
13
HPD complaints
8

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 12

  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 16, 2019

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Nov 5, 2010

    Dob violation - dismissed
  • Unsafe buildings none

    Ub-unsafe buildings none

    Oct 18, 2010

    Dob violation - dismissed
  • Construction other optional

    Dob violation issued for matters not provided

    Oct 14, 2010

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Oct 14, 2010

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Nov 2, 2007

    Dob violation - dismissed
Show 2 more ↓
  • Construction other optional

    C-construction other optional

    Nov 2, 2007

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Feb 28, 2001

    Vw*-violation - work w/o permit dismissed

ECB violations · 13

  • Class - 1

    Bc 1905.6.3.3.2 final curing.failure to properly laboratory cure concrete cylinders in accordance w/astm c31,10.1.2,10.1.3 & 11.as noted @time of insp @ nyc dob actively licensed concrete testing lab,concrete c

    Feb 27, 2019 · Penalty $625

    Resolve
  • Class - 1

    Work does not conform to approved plans. at time of inspection noted @expo #2 and 4 that the roof protection was not installed as per design approved plans-needle beams @ top of plywood not on plans. rem: pswo

    Nov 3, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    Work does not conform to approved site plans. at time of inspection noted: job site fence @ expo #2 adjoining property able to gain access onto site. rem: pswo provide jobsite fence to fully enclose site email

    Nov 3, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by construction operations. at time of inspection no cable railings or a control access zone on floors from 3rd floor to 6th floor posing a hazardous condi

    Nov 3, 2017 · Penalty $5,000

    Resolve
  • Class - 2

    Bc3303.11 stairs during construction. at time of inspection bldg steel and qdeck erected up to the 6th floor level no permanent stairs erected up to 2nd floor level bldg approx 70' above grade. rem: comply with

    Nov 3, 2017 · Penalty $400

    Resolve
  • Hazardous

    Failrue to maintain ext. bldg walk note: 1 story structure have no roof due to fire. remedy: maintain ext. bldg walls.

    Jun 28, 2008 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to maintain. defects observed: unsecured plywood cover for broken window allowing access to fire damaged bldg. remedy: re-secure plywood protection.

    Jan 29, 2008 · Penalty $2,500

    Resolve
  • Hazardous

    Sidewalk shed not adequately maintained. noted: sidewalk shed lightinginstalled to accept extension cord, which is an improper application. lights were not on at time of inspection. remedy: maintain sidewalk

    Jan 29, 2008 · Penalty $1,000

    Resolve
  • Hazardous

    Job site fence defective. hazardous defects noted: sidewalk fence at 155a sherman ave has a 4'x 8' panel loose w/multiple 2" nails exposed to passersby. panel has been removed enough to allow public access to

    Dec 5, 2007 · Penalty $2,500

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by the certificate of occupancy #19007 of 06/30/55. note: from legal occupancy cellar: storage and boiler room. 1st floor: restaurant with dancing and stores. to illegal

    Jul 12, 2004

    Resolve
Show 3 more ↓
  • Non-hazardous

    Failure to provide approved plans at premise at time of inspection noted: at 1st floor commercial space being gutted and removed without plans at site. remedy: stop all work provide plans

    Jun 25, 2004 · Penalty $130

    Resolve
  • Non-hazardous

    Work without a permit.in that an opening approx 9ft long x 3ft wide was made to create an interior stainway from 1 to cellar fl thus connecting both spaces.rem:obtain a permit if feasible.

    Feb 28, 2001 · Penalty $250

    Resolve
  • Non-hazardous

    Work without a permit. in that an opening approx. 9 feet long x 3 ft wide was made to create an interior stairway from 1st floor to cellar floor - thus connecting both spaces. remedy: obtain permit if feasible

    Jun 8, 1998 · Penalty $2,500

    Resolve

Complaints

  • Paint/plaster

    Wall

    Nov 6, 2023 · Apt 6C

    Close
  • Flooring/stairs

    Floor

    Nov 6, 2023 · Apt 6C

    Close
  • Appliance

    Electric/gas range

    Nov 6, 2023 · Apt 6C

    Close
  • Safety

    Carbon monoxide detector

    Nov 6, 2023 · Apt 6C

    Close
  • General

    Bell/buzzer/intercom

    Nov 6, 2023 · Apt 6C

    Close
  • Door/window

    Door

    Nov 6, 2023 · Apt 6C

    Close
  • Door/window

    Window pane

    Nov 6, 2023 · Apt 6C

    Close
  • Heating

    Heat related

    Dec 9, 2010 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
School building (W3)
Year built
2016
Floors
6
Residential units
—
Building area
61,556 ft²
Lot area
12,000 ft²
Zoning
R7A
Community board
112
Council district
10
Block / lot
2221 / 5
Assessed value
$9,093,600
Landmark / historic district
No

Questions about 153 Sherman Avenue

Who owns 153 Sherman Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Tep Charter School Assistance, INC..

Does 153 Sherman Avenue have violations?

NYC HPD has no housing violations on record for this property.

Is 153 Sherman Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 153 Sherman Avenue built?

City records list 2016 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.