4321 Broadway
Manhattan, NY 10033BBL 1-02180-0120Map
Owner of record: Lincoln Prospect Associates LLC
4321 Broadway is a walk-up apartment building built in 1949 in Manhattan, 10033. It has 69 residential units across 6 floors. The owner of record is Lincoln Prospect Associates LLC. HPD has recorded 351 housing violations here, most recently on March 7, 2026. 33 of the 50 most recent violations are still open. City tax records listed 54 rent-stabilized apartments here in 2024.
- HPD violations
- 351
- DOB violations
- 6
- ECB violations
- 6
- HPD complaints
- 824
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 351
- BHazardous
Properly repair or replace the broken or defective spring balance at upper window sash 1st window at east wall in the 3rd room from north located at apt 5j, 6th story, 1st apartment from north at east
Mar 7, 2026 · Apt 5J
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 5j, 6th story, 1st apartment from north at east
Mar 7, 2026 · Apt 5J
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5j, 6th story, 1st apartment from north at east
Mar 7, 2026 · Apt 5J
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at upper window sash 2nd window at east wall in the 1st room from north at east located at apt 5j, 6th story, 1st apartment from north at east
Mar 7, 2026 · Apt 5J
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at upper window sash 1st window at east wall in the 1st room from north at east located at apt 5j, 6th story, 1st apartment from north at east
Mar 7, 2026 · Apt 5J
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash 1st window at east wall in the kitchen located at apt 5j, 6th story, 1st apartment from north at east
Mar 7, 2026 · Apt 5J
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash 1st window at north wall in the bathroom located at apt 5j, 6th story, 1st apartment from north at east
Mar 7, 2026 · Apt 5J
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 4th room from east located at apt 4b, 4th story, 2nd apartment from east at south
Mar 7, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 4b, 4th story, 2nd apartment from east at south
Mar 7, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 4b, 4th story, 2nd apartment from east at south
Mar 7, 2026 · Apt 4B
Open — Nov sent out
Show 40 more ↓
- BHazardous
Replace with new the missing eschutchen plate heat riser at ceiling in the 2nd room from east located at apt 4b, 4th story, 2nd apartment from east at south
Mar 7, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4b, 4th story, 2nd apartment from east at south
Mar 7, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4b, 4th story, 2nd apartment from east at south
Mar 7, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 2nd apartment from east at south
Mar 7, 2026 · Apt 4B
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective floor at sink base cabinet in the kitchen located at apt 4b, 4th story, 2nd apartment from east at south
Mar 7, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 4b, 4th story, 2nd apartment from east at south
Mar 7, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ...door and frame at vestibule , 1st story, section ''east''
Aug 18, 2025
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing ...kick stand install at vestibule door , 1st story, section ''east''
Aug 18, 2025
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing at vestibule at public hall, 1st story
May 5, 2025
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3l, 4th story, 1st apartment from west at north
Jun 27, 2024 · Apt 3L
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq fts at ceiling in the bathroom located at apt 3l, 4th story, 1st apartment from west at north
Jun 27, 2024 · Apt 3L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3l, 4th story, 1st apartment from west at north
Jun 27, 2024 · Apt 3L
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq fts at ceiling in the bathroom located at apt 3l, 4th story, 1st apartment from west at north original violation 17078282 issued 27-jun-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 27, 2024 · Apt 3L
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north at west located at apt 4e, 5th story, 1st apartment from west at north
Jan 10, 2024 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 4e, 5th story, 1st apartment from west at north
Jan 10, 2024 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at the north wall in the 1st room from north at west located at apt 4e, 4th story, 1st apartment from west at north
Apr 17, 2023 · Apt 4E
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the north wall in the 1st room from north at west located at apt 4e, 4th story, 1st apartment from west at north
Apr 17, 2023 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt l, 1st story, 1st apartment from west at north
Feb 28, 2023 · Apt L
Closed — Violation closed - BHazardous
Replace with new the broken or defective glass pane at lower sash window at south wall in the 2nd room from north at east located at apt l, 1st story, 1st apartment from west at north
Feb 28, 2023 · Apt L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt l, 1st story, 1st apartment from west at north
Feb 28, 2023 · Apt L
Open — Nov sent out - BHazardous
Replace with new the broken or defective handle in the bathroom located at apt l, 1st story, 1st apartment from west at north
Feb 28, 2023 · Apt L
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt l, 1st story, 1st apartment from west at north
Feb 28, 2023 · Apt L
Open — Notice of issuance sent to tenant - BHazardous
Replace with new the broken or defective gasket at refrigerator door in the kitchen located at apt l, 1st story, 1st apartment from west at north
Feb 28, 2023 · Apt L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 4th room from east located at apt 4e, 5th story, 1st apartment from west at north , section ''703''
Jan 21, 2023 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 4th room from east located at apt 4e, 5th story, 1st apartment from west at north , section ''703''
Jan 21, 2023 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3k, 4th story, 2nd apartment from north at east
Jan 5, 2023 · Apt 3K
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 3k, 4th story, 2nd apartment from north at east
Jan 5, 2023 · Apt 3K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 2nd room from north located at apt 3k, 4th story, 2nd apartment from north at east
Jan 5, 2023 · Apt 3K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the bathroom located at apt 3k, 4th story, 2nd apartment from north at east
Jan 5, 2023 · Apt 3K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway , the 3rd room from north located at apt 3k, 4th story, 2nd apartment from north at east
Jan 5, 2023 · Apt 3K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall in the 2nd room from north located at apt 3k, 4th story, 2nd apartment from north at east
Jan 5, 2023 · Apt 3K
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 3k, 4th story, 2nd apartment from north at east
Jan 5, 2023 · Apt 3K
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3k, 4th story, 2nd apartment from north at east
Jan 5, 2023 · Apt 3K
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3k, 4th story, 2nd apartment from north at east
Jan 5, 2023 · Apt 3K
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 3k, 4th story, 2nd apartment from north at east
Jan 5, 2023 · Apt 3K
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroom located at apt 3k, 4th story, 2nd apartment from north at east
Jan 5, 2023 · Apt 3K
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 3k, 4th story, 2nd apartment from north at east
Jan 5, 2023 · Apt 3K
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 5 sq ft at west wall in the bathroom located at apt 3k, 3rd story, 2nd apartment from west at north original violation 15154036 issued 14-may-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
May 14, 2022 · Apt 3K
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 3k, 3rd story, 2nd apartment from west at north
May 14, 2022 · Apt 3K
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 5 sq ft at west wall in the bathroom located at apt 3k, 3rd story, 2nd apartment from west at north
May 14, 2022 · Apt 3K
Closed — Violation closed
DOB building violations · 6
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 12, 2015
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Jun 27, 2007
Vp*-violation unserved ecb- dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 6
- Class - 2
Failure to comply with the commissioners order contained in nov#35078769r issued on 05/16/15 and to file a certificate of correction pursuant to 28-201.1,28-204.4 and 1rcny 102-01.for full renovated and comple
Oct 8, 2016 · Penalty $800
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in nov# 35078769r issued on 5/16/15 & to file a c of c pursuant to 28-201.1, 28-204.4 & 1rcny 102-01. noted: no document file for work w/out a permit. rem
Jul 28, 2016 · Penalty $2,400
Resolve - Class - 1
Work w/o a permit. at time of inspection observed the following groundfloor(restaurant)being fully renovated. the following work was completed new partition walls full height,now bathrooms which included plumbi
May 16, 2015 · Penalty $1,630
Resolve - Non-hazardous
Failure to maintain bldg(exterior)noted:parapet section approx 7' on 4327 broadway side of bldg(east)where-as said parapet is bowing(leaning)outward w/defects observed on inside roof area consisting of temp
Jun 20, 2007 · Penalty $800
Resolve - Hazardous
Sidewalk shed does not conform to building code specifications note shed erected on both broadway & w 184 st has no illumination remedy:provide lights on shed
Apr 15, 2005 · Penalty $5,000
Resolve - Hazardous
Sidewalk shed does not conformed to or meet building code specifications. noted: sidewalk shed erected at both b,way facade approx. 75'-0"long, and 85'-0" long at w 184 st. facade with no lights. today tues is
Dec 7, 2004 · Penalty $2,000
Resolve
Complaints
- Plumbing
Basin/sink
Sep 21, 2026 · Apt 4E
Open - Paint/plaster
Wall
Sep 21, 2026 · Apt 4E
Open - Unsanitary condition
Pests
May 14, 2026 · Apt 2J
Close - Unsanitary condition
Pests
Feb 9, 2026 · Apt 4B
Close - Paint/plaster
Wall
Feb 9, 2026 · Apt 4B
Close - Paint/plaster
Ceiling
Feb 9, 2026 · Apt 4B
Close - Flooring/stairs
Floor
Feb 9, 2026 · Apt 4B
Close - Paint/plaster
Wall
Feb 9, 2026 · Apt 4B
Close - Water leak
Slow leak
Feb 9, 2026 · Apt 4B
Close - Plumbing
Basin/sink
Feb 9, 2026 · Apt 4B
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Feb 9, 2026 · Apt 4B
Close - Unsanitary condition
Pests
Feb 9, 2026 · Apt 4B
Close - Paint/plaster
Wall
Feb 9, 2026 · Apt 4B
Close - Paint/plaster
Wall
Feb 9, 2026 · Apt 4B
Close - Plumbing
Basin/sink
Feb 9, 2026 · Apt 4B
Close - Door/window
Door
Feb 3, 2026 · Apt 3K
Close - Flooring/stairs
Floor
Nov 11, 2025 · Apt 5J
Close - Door/window
Window frame
Nov 11, 2025 · Apt 5J
Close - Door/window
Window frame
Nov 11, 2025 · Apt 5J
Close - Paint/plaster
Wall
Sep 15, 2025 · Apt 3K
Close - Door/window
Door
Mar 14, 2025 · Apt 4E
Close - Plumbing
Basin/sink
Jan 2, 2025 · Apt 4D
Close - Unsanitary condition
Garbage/recycling storage
Sep 18, 2024 · Apt BLDG
Close - Water leak
Heavy flow
May 19, 2024 · Apt 3L
Close - Door/window
Door
Jan 8, 2024 · Apt 4E
Close - Electric
Lighting
Jan 8, 2024 · Apt 4E
Close - Heat/hot water
Apartment only
Jan 8, 2024 · Apt 4E
Close - Unsanitary condition
Mold
Jan 8, 2024 · Apt 4E
Close - Paint/plaster
Ceiling
Jan 8, 2024 · Apt 4E
Close - General
Bell/buzzer/intercom
Jan 8, 2024 · Apt 4E
Close - Door/window
Door
Aug 22, 2023 · Apt L
Close - Unsanitary condition
Mold
Aug 22, 2023 · Apt L
Close - Flooring/stairs
Floor
Aug 22, 2023 · Apt L
Close - Plumbing
Basin/sink
May 18, 2023 · Apt L
Close - Paint/plaster
Wall
May 18, 2023 · Apt L
Close - Unsanitary condition
Pests
May 18, 2023 · Apt L
Close - Paint/plaster
Door/frame
May 18, 2023 · Apt L
Close - Plumbing
Water supply
Mar 24, 2023 · Apt 4E
Close - Electric
No lighting
Mar 24, 2023 · Apt 4E
Close - Unsanitary condition
Mold
Mar 24, 2023 · Apt 4E
Close - Door/window
Window pane
Feb 26, 2023 · Apt L
Close - Plumbing
Steam pipe/riser
Feb 26, 2023 · Apt L
Close - Flooring/stairs
Floor
Feb 26, 2023 · Apt L
Close - Plumbing
Bathtub/shower
Feb 26, 2023 · Apt L
Close - Paint/plaster
Ceiling
Feb 26, 2023 · Apt L
Close - Door/window
Window frame
Feb 26, 2023 · Apt L
Close - Plumbing
Toilet
Feb 26, 2023 · Apt L
Close - Flooring/stairs
Floor
Feb 26, 2023 · Apt L
Close - Unsanitary condition
Pests
Feb 26, 2023 · Apt L
Close - Appliance
Refrigerator
Feb 26, 2023 · Apt L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1949
- Floors
- 6
- Residential units
- 69
- Building area
- 56,300 ft²
- Lot area
- 12,400 ft²
- Zoning
- C8-3
- Community board
- 112
- Council district
- 10
- Block / lot
- 2180 / 120
- Assessed value
- $2,736,000
- Landmark / historic district
- No
HPD registration #128589, last renewed Oct 20, 2025.
Questions about 4321 Broadway
Who owns 4321 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Lincoln Prospect Associates LLC.
Does 4321 Broadway have violations?
Yes. NYC HPD has recorded 351 housing violations at this property.
Is 4321 Broadway rent stabilized?
NYC Department of Finance tax bills listed 54 rent-stabilized units here in 2024 (about 78% of its 69 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 4321 Broadway built?
City records list 1949 as the year it was built.
How many apartments are in 4321 Broadway?
It has 69 residential units and 74 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.