1 Jumel Place
Manhattan, NY 10032BBL 1-02112-0058Map
Owner of record: NYC Department Of Education
1 Jumel Place is a school building built in 1993 in Manhattan, 10032. The owner of record is NYC Department Of Education. HPD has recorded 11 housing violations here, most recently on July 31, 2008. 11 of the 11 most recent violations are still open.
- HPD violations
- 11
- DOB violations
- 63
- ECB violations
- 122
- HPD complaints
- 36
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 11
- BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt g, 1st story, 2nd apartment from west at north
Jul 31, 2008 · Apt G
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the base cabinets in the kitchen located at apt g, 1st story, 2nd apartment from west at north
Jul 31, 2008 · Apt G
Open — Nov sent out - BHazardous
Repair the broken or defective connection at the wasteline at the sink in the kitchen located at apt g, 1st story, 2nd apartment from west at north
Jul 31, 2008 · Apt G
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt g, 1st story, 2nd apartment from west at north
Jul 31, 2008 · Apt G
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east at north located at apt g, 1st story, 1st apartment from west at north
Jul 31, 2008 · Apt G
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of a concealed water leak at the ceiling in the 2nd room from east at north located at apt g, 1st story, 1st apartment from west at north
Jul 31, 2008 · Apt G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at north located at apt g, 1st story, 1st apartment from west at north
Jul 31, 2008 · Apt G
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... on the window stools 6 sq ft in the 2nd room from east at north located at apt g, 1st story, 2nd apartment from west at north
Jul 31, 2008 · Apt G
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the north court
Jul 31, 2008
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at the window stools 6 sqft in the 2nd room from north at east located at apt g, 1st story, 1st apartment from west at north
Jul 31, 2008 · Apt G
Open — Nov sent out
Show 1 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood floor at the radiator in the 2nd room from north at east located at apt g, 1st story, 1st apartment from west at north
Jul 31, 2008 · Apt G
Open — Nov sent out
DOB building violations · 63
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2010
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 29, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 29, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 16, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2003
Dob violation - dismissed - Elevator elevatorrequired
1p37353
Jan 17, 2002
Dob violation - resolved - Elevator elevatorrequired
1p37354
Jan 17, 2002
Dob violation - resolved - Elevator elevatorrequired
1p37353
Jan 23, 2001
Dob violation - resolved - Elevator elevatorrequired
1p37354
Jan 23, 2001
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 27, 1995
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 1995
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 1994
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 30, 1988
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 1988
Dob violation - active
ECB violations · 122
- Class - 2
Failure to maintain building in code-compliant manner. use of prohibited door and/or stair b 4th floor and 3rd floor stair b had installed door kick stops on all 4 fire rated smoke doors on both floors. remedy:
Mar 3, 2026 · Penalty $1,250
Resolve - Class - 2
Reissue on ecb #35692512l. failure to maintain building in code-compliant manner. noted: upon inspection approx 7-10 state step treads broken and in disrepair on stairwell b from 4th fl to roof bulkhead. remedy
Mar 3, 2026 · Penalty $3,125
Active - Class - 2
Failure to maintain building in code-compliant manner. illumination for exits, exit discharges and public corridors per bc 1006.1; 27-352 onall public assembly areas which includes gym, auditorium and cafeteria
Mar 3, 2026 · Penalty $3,125
Active - Class - 2
Exit door not self-closing. noted: upon inspection emergency exterior exit doors not self-closing properly due to hardware, or binding on exit 10, 1st floor and exit 8 first floor. remedy: repair/replace door.
Mar 3, 2026 · Penalty $625
Active - Class - 2
Failure to maintain building in code-compliant manner. noted: upon inspection, fire rated/smoke doors not self-closing. properly due to binding or hardware on classrooms, b407, b405, a410, a412, a418, c402, c40
Mar 3, 2026 · Penalty $1,250
Active - Class - 2
Reissue ecb #35692514p. failure to maintain building in code-compliantmanner. lack of emergency lighting for exits, exit discharges and public corridors per bc 100.,1; 27-542. noted: kitchen emergency lighting
Mar 3, 2026 · Penalty $1,250
Active - Class - 1
At time of inspection, obs supported scaffold with required protective debris netting in place; however, netting was not securely fastened to the supported scaffold on all open sides and elevations. failure to
Feb 21, 2026
Resolve - Class - 2
At time of inspection, observed sidewalk shed with several vertical posts out of plumb and multiple bent/damaged cross braces. structural framing members not properly aligned or maintained in sound condition. f
Feb 21, 2026
Resolve - Class - 1
Failure to maintain pedestrian protection for sidewalks and walkways. bc 3307.4 warning signs: inspection of the shed & work zone i observed a blind spot under the shed & a makeshift corner, that was not clearl
Feb 21, 2026
Resolve - Class - 2
At time of inspection, it was observed that contractor failed to post required work permit in a conspicuous place at the site. no work permits were visibly displayed for ongoing construction work. failure to po
Feb 21, 2026
Resolve
Show 40 more ↓
- Class - 2
Reissue: 35676127p date of issue: 01-30-2024. failure to maintain building in code-compliant manner. at the time of inspection observed and noted that at 4th floor near stair "d" ceiling and in room #b412 ceili
Feb 19, 2025 · Penalty $3,125
Resolve - Class - 2
Reissue: 35676129z date of issue: 01-30-2024. failure to maintain building in code-compliant manner. at the time of inspection, noted and observed at stairway lending to bulkhead from 4 floor several stapes are
Feb 19, 2025 · Penalty $3,125
Active - Class - 2
Reissue: 35676130x date of issue: 01-30-2024. failure to maintain building in code-compliant manner lack of emergency lighting for exits, exit discharges and public corridors per bc 1006.1; 27-542. at the time
Feb 19, 2025 · Penalty $3,125
Active - Class - 2
Reissue #35676128r date of issue: 01-30-2024. failure to maintain building in code-compliant manner at the time of inspection i observed andnoted at roof level numerous cement tiles are in state of disrepair th
Feb 19, 2025 · Penalty $3,125
Active - Class - 2
Re-issue #35663314h-failure to maintain building in code-compliant manner. noted: at 4th floor near stair 'd' ceiling and in room #b412 ceiling are damaged due to leak coming from roof. remedy: repair and/or re
Jan 30, 2024 · Penalty $1,562
Resolve - Class - 2
Re-issue 35207731j-failure to maintain building in code-compliant manner: lack of emergency lighting for exits, exit discharges and public corridors per bc 1006.1; 27-542. noted: at 1st flr., kitchen 2nd means
Jan 30, 2024 · Penalty $3,125
Active - Class - 2
Re-issue #35663313x-failure to maintain building in code-compliant manner. noted: at roof level, numerous cement tiles are in state of disrepair throughout the entire roof which are the probable cause of the da
Jan 30, 2024 · Penalty $1,562
Active - Class - 2
Re-issue #35663312y-failure to maintain building in code-compliant manner. noted: at stairway leading to bulkhead from 4 flr. several slatessteps are broken creating a hazard to anyone on the stair using it to/
Jan 30, 2024 · Penalty $1,562
Active - Class - 2
Reissue #35658032n date of issue #06.13.2022 failure to maintain building in code compliant manner at the time of inspection i observed that at 4th floor damage in room no-d412 near stairway - exit-d in room d-
Jun 13, 2023 · Penalty $1,562
Resolve - Class - 3
Reissue #35658031l date of issue #06.13.2022 failure to maintain building in code-compliant manner. at the time of inspection observed at 4th floor stair landing to roof access has broken, slate step near to ro
Jun 13, 2023 · Penalty $500
Active - Class - 2
Reissue #35495194m date of issue # 05.11.2020 failure to maintian building in code-compliant manner note at roof level roof in disrepair, broken cement tiles throughout entire roof causing leak & damage to ceil
Jun 13, 2023 · Penalty $1,562
Active - Class - 2
Exit door not self closing properly, at the time of inspection at 3rd floor gym, 3 exit door are not self closing properly, at 1st fl main entrance two exit door not self closing properly, at first floor, stair
Jun 13, 2023 · Penalty $625
Resolve - Class - 3
Reissue#35577460p.failure to maintain building in code compliant manner.at time of my inspection,i observed at 4th floor stair landinf to roof access has broken slate and step from rooftop throughout.issued 6/2
Jun 13, 2022 · Penalty $500
Active - Class - 2
Reissue#35577459h.failure to maintain building in code compliant manner.at time of inspection,i observed at 4th floor ceiling damage in roomb412,stairway exit to cellar from roof.issued on 6/22/2022.need to mak
Jun 13, 2022 · Penalty $1,562
Resolve - Class - 2
Reissue #35577461r.failure to maintain building in code-compliant manner.at time of inspection observed at 3rd floor in disrepair floor boards alt stearming under window rootted violation #35577461r issued 6/21
Jun 13, 2022 · Penalty $1,562
Resolve - Class - 2
Reissue35495196y failure to maintain bldg in codecompliant manner.noted:ato my insp i observed@4fl ceiling damage in rmb412&stairway extid to leak from roof v35495195y issued5/11/20 for violating condition need
Jun 21, 2021 · Penalty $1,562
Resolve - Class - 2
Reissue35495197h failure to maintain bldg in codecompliant manner.noted:ato my insp i observed@3fl a320 fl in disrepair where flboards are separating under window rotted v35475197h issued5/11/21 (illegible) to
Jun 21, 2021 · Penalty $1,562
Resolve - Class - 3
Reissue39495193k failure to maintain bldg in codecompliant manner.noted:ato my insp i observed@4fl stairs leading to roof access has broken slate tread&step from top thruout entire stoop,v39495193k issued for v
Jun 21, 2021 · Penalty $500
Active - Class - 2
Reissue#35415388h exit door not self closing. note the following doors not closing;4th fl near room b403 corridor door,exit d,3rd fl cafeteria door,2nd fl exit d & corridor door near room208,& 1st fl staircase
May 11, 2020 · Penalty $1,562
Resolve - Class - 3
Reissue#35325900z failure to maintain bldg in code compliant manner. noted at 4th fl stairs leading to roof access has broken slate tread & step from top. remedy: repair & or replace.
May 11, 2020 · Penalty $500
Active - Class - 2
Failure to maintain bldg in code compliant manner. note at 4th fl ceiling damage in room b 412 & stairway exit d due to leak from roof. remedy: repair & or replace.
May 11, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. note: on 3rd fl looker have seperated from wall & are leaning in w/a possibility of falling over. remedy: repair & or replace.
May 11, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in code compliatn manner. note at roof level roof in disrepair w/broken cement tiles throughout entire roof causingleak & damage to ceilings below. remedy: repair & or replace.
May 11, 2020 · Penalty $625
Active - Class - 2
Failure to maintain bldg in code compliant manner. note at 3rd fl room a320 the floor is in disrepair where the floor boards are seperating under the window & coming up. remedy: repair &/or replace.
May 11, 2020 · Penalty $625
Resolve - Class - 2
Sec. 28-301.1 unlawful display of artwork in corridors greater than 20% per fdny code 2008 gc 803.3.2. note at all floor artwork more than 20% also artwork hanging from ceilings blocking sight to exits & exit
May 11, 2020 · Penalty $1,250
Resolve - Class - 2
Exit door not self closing.noted:on the 1st fl.staircase d,e,exit3,exit8,the doors next to room 101,exit6 kitchen.the 2nd floor next to 208 3rd fl next to the gymnasium.4th fl.next to rm.b403,all these doors ar
May 13, 2019
Resolve - Class - 3
Re-issue #35325901k failure to maintain bld.in code compliant manner.noted:on the 4th fl.stair case "c"going to the roof,the slate tread is broken.rem:repair and/or replace.
May 13, 2019
Resolve - Class - 2
28-301.1 reissue #35253183p. failure to provide ventilation to gas meter room per p115.6 (1968 code)(fgc appendix e ce4)(2014 code). noted: at basement level in gas meter room exhaust fan is not working. need t
Mar 23, 2018
Resolve - Class - 3
Reissue #35253184r. failure to maintain building in code-compliant manner. noted: at time of inspection, observed broken slate tread #2 from the top down on the 4th floor going to the roof needs to be repaired
Mar 23, 2018
Active - Class - 2
28-301.1 failure to provide ventilation to gas meter room per p115.6 (1968 code),fgc appendix e (e4) (2014 code) noted: there is no ventilation to the gas meter room at cellar level. the mechanical ventilation
Apr 20, 2017
Resolve - Class - 3
Failure to maintain building in code compliant manner. noted: broken slate tread #2 from the top down on the 4 floor going to the roof.rmdyrepair and/or replace.
Apr 20, 2017
Active - Class - 2
Failure to maintain bldg in code compliant manner: use of prohibited door and/or hardware per bc 1008.1.8, 27-3711j. noted at multiple stairways keys to wire mesh gate leading to the roof are being stored in lo
Apr 20, 2017
Resolve - Class - 3
Failure to maintain bldg in code-compliant manner. observed. roof havemany defects at main exit door under ac units and other places which need to be fixed. rmdy: repair/or replace.
Sep 13, 2016 · Penalty $500
Resolve - Class - 2
715.3.7 exit door not self-closing.observed at 3rd floor small door entrance to auditorium.defective; doors near of oroom 319 and d312 defective too. rmdy: repair/replace door.
Sep 13, 2016
Resolve - Class - 2
Failure to maintain building in code-compliant manner:lack for emergency lighting for exit dischargees and public corridors per bc 1006.1; 27-542. observed. missing exit sign at exit no.06 and st. floor at kitc
Sep 13, 2016
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. observed leak at ac units to roof (freon) seat on roof under 90% of ac units.
Sep 13, 2016
Resolve - Class - 2
Failure to maintain building in code compliant manner.observed tick atac units to roof...custodian states is from slot on roof--under 90% ofac units..housekeeping at cellar found garbage near at room a002.rmdy:
Sep 13, 2016
Resolve - Class - 2
Cellar level electrical room is being used for storage. ( couch, ladders lifts) etc.. remedy: remove strorage items
Feb 12, 2014
Resolve - Class - 2
Reissue : 34954411n 2nd fl smoke doors near room b 206 not closing. 4th fl. smoke doors near room a 425 are racked stwy "g" door not closing3rd fl gym door not closing. stwy "h" door racked. 1st fl stwy "c" doo
Feb 12, 2014
Resolve - Class - 2
Reissue: 35015601p cellar level, hall in front of room a 002 fire retardant spalling off the steel decking. ( decking corroded ) remedy: repair defects
Feb 12, 2014
Resolve
Complaints
- Heat/hot water
Entire building
Jan 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Apr 27, 2025 · Apt 3BB
Close - Plumbing
Basin/sink
Apr 27, 2025 · Apt 3BB
Close - Heat/hot water
Entire building
Jun 29, 2023 · Apt 3BB
Close - Heat/hot water
Entire building
May 24, 2023 · Apt BLDG
Close - Electric
No lighting
May 4, 2022 · Apt 3BB
Close
Show 26 more ↓
- General
Cabinet
Dec 30, 2009 · Apt G
Close - General
Floor
Dec 30, 2009 · Apt G
Close - Plumbing
Basin/sink
Dec 30, 2009 · Apt G
Close - Nonconst
Rubbish
Dec 30, 2009 · Apt G
Close - General
Mold
Dec 30, 2009 · Apt G
Close - Electric
Wiring
Dec 30, 2009 · Apt G
Close - General
Mold
Dec 30, 2009 · Apt G
Close - Electric
Wiring
Dec 30, 2009 · Apt G
Close - Nonconst
Vermin
Dec 30, 2009 · Apt G
Close - Nonconst
Vermin
Dec 30, 2009 · Apt G
Close - Paint/plaster
Wall
Dec 30, 2009 · Apt G
Close - General
Windows
Dec 30, 2009 · Apt G
Close - Nonconst
Rubbish
Dec 30, 2009 · Apt G
Close - Paint/plaster
Wall
Jul 28, 2008 · Apt G
Close - Nonconst
Rubbish
Jul 28, 2008 · Apt G
Close - Nonconst
Vermin
Jul 28, 2008 · Apt G
Close - General
Ceramic-tile
Jul 28, 2008 · Apt G
Close - General
Mold
Jul 28, 2008 · Apt G
Close - General
Cabinet
Jul 28, 2008 · Apt G
Close - Plumbing
Basin/sink
Jul 28, 2008 · Apt G
Close - Paint/plaster
Ceiling
Jul 28, 2008 · Apt G
Close - General
Floor
Jul 28, 2008 · Apt G
Close - General
Mold
Jul 28, 2008 · Apt G
Close - Plumbing
Water-leaks
Jul 28, 2008 · Apt G
Close - Heating
Heat related
Jun 9, 2008 · Apt 1
Close - General
Cooking gas
Jun 9, 2008 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 1993
- Floors
- 4
- Residential units
- —
- Building area
- 195,000 ft²
- Lot area
- 116,575 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2112 / 58
- Assessed value
- $33,324,750
- Landmark / historic district
- No
Questions about 1 Jumel Place
Who owns 1 Jumel Place?
The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Education.
Does 1 Jumel Place have violations?
Yes. NYC HPD has recorded 11 housing violations at this property.
Is 1 Jumel Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1 Jumel Place built?
City records list 1993 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.