2201 Amsterdam Avenue
Manhattan, NY 10032BBL 1-02112-0015Map
Owner of record: Kmr Amsterdam LLC
2201 Amsterdam Avenue is an elevator apartment building built in 1929 in Manhattan, 10032. It has 82 residential units across 6 floors. The owner of record is Kmr Amsterdam LLC. HPD has recorded 540 housing violations here, most recently on September 16, 2026. 16 of the 50 most recent violations are still open. City tax records listed 57 rent-stabilized apartments here in 2024.
- HPD violations
- 540
- DOB violations
- 46
- ECB violations
- 36
- HPD complaints
- 1,337
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 540
- BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft at north wall, east wall, west wall, and at ceiling in the bathroom located at apt 1k, 1st story, 1st apartment from south at west , section at south
Sep 16, 2026 · Apt 1K
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east at south, the bathroom located at apt 1k, 1st story, 1st apartment from south at west , section at south
Sep 16, 2026 · Apt 1K
Open — Civ14 mailed - ANon-hazardous
Cleanse to the satisfaction of this department the mold on tiled serfaces at east wall, south wall, and at west wall in the bathroom located at apt 1k, 1st story, 1st apartment from south at west , section at south
Sep 16, 2026 · Apt 1K
Open — Civ14 mailed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at south wall, and at ceiling, at 1st closet from north at east wall ceiling in the 4th room from east at south located at apt 1k, 1st story, 1st apartment from south at west , section at south
Sep 16, 2026 · Apt 1K
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at south wall and at ceiling 1st closet from north at east wall ceiling in the 4th room from east at south located at apt 1k, 1st story, 1st apartment from south at west , section at south
Sep 16, 2026 · Apt 1K
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the private hallway , the foyer located at apt 1k, 1st story, 1st apartment from south at west
Aug 24, 2026 · Apt 1K
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 0 sq ft at north, east and west walls and ceiling in the bathroom located at apt 1k, 1st story, 1st apartment from south at west
Aug 24, 2026 · Apt 1K
Open — Civ14 mailed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 22, 2026
Open — Not complied with - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less then 10sq feet at west wall in the bathroom located at apt 5c, 5th story, 1st apartment from west at north
Mar 6, 2026 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 5c, 5th story, 1st apartment from west at north
Feb 6, 2026 · Apt 5C
Open — Certification postponment denied
Show 40 more ↓
- CImmediately hazardous
Properly repair or replace the broken or defective upper glass pane at vestibule door to public hall , 1st story
Dec 26, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5c, 5th story, 1st apartment from west at north
Dec 26, 2025 · Apt 5C
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5c, 5th story, 1st apartment from west at north
Dec 26, 2025 · Apt 5C
Open — Invalid certification - BHazardous
Refit the door at entrance in the 2nd room from east at south located at apt 5c, 5th story, 1st apartment from west at north
Dec 26, 2025 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance at lower sash window at north in the 4th room from east located at apt 5c, 5th story, 1st apartment from west at north
Dec 26, 2025 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wasteline at washbasin in the bathroom located at apt 5c, 5th story, 1st apartment from west at north , section at north
Dec 10, 2025 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 5c, 5th story, 1st apartment from west at north , section at north
Dec 10, 2025 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5c, 5th story, 1st apartment from west at north , section at north
Dec 10, 2025 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 5c, 5th story, 1st apartment from west at north
Dec 9, 2025 · Apt 5C
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at east wall in the bathroom located at apt 5c, 5th story, 1st apartment from west at north
Nov 11, 2025 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 5c, 5th story, 1st apartment from west at north
Nov 11, 2025 · Apt 5C
Open — Certification postponment granted - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the 1st room from east at north located at apt 5c, 5th story, 1st apartment from west at north
Oct 29, 2025 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5c, 5th story, 1st apartment from west at north
Oct 29, 2025 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5c, 5th story, 1st apartment from west at north
Oct 29, 2025 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the kitchen located at apt 5c, 5th story, 1st apartment from west at north
Sep 24, 2025 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly secure the loose electrical wire conduit at north wall electrical outlet in the 1st room from north at east located at apt 5c, 5th story, 1st apartment from west at north
Aug 21, 2025 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective bell-buzzer system at west wall in the kitchen located at apt 1f, 1st story, 1st apartment from south at west , section ''north''
Jul 11, 2025 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1f, 1st story, 1st apartment from south at west , section ''north''
Jul 11, 2025 · Apt 1F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mortise lock at building entrance door , 1st story
Apr 23, 2025
Closed — Violation closed - BHazardous
Refit upper and lower sashes at 1st window from west in the 3rd room from east located at apt 5c, 5th story, 1st apartment from west at north
Apr 7, 2025 · Apt 5C
Open — Certification postponment denied - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5c, 5th story, 1st apartment from west at north
Apr 7, 2025 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 4th room from east located at apt 5c, 5th story, 1st apartment from west at north
Mar 20, 2025 · Apt 5C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 5c, 5th story, 1st apartment from west at north
Mar 20, 2025 · Apt 5C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective bell buuzzer intercom system from building entrance to panel at north wall in the foyer located at apt 5c, 5th story, 1st apartment from west at north
Mar 20, 2025 · Apt 5C
Open — Not complied with - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5c, 5th story, 1st apartment from west at north
Mar 19, 2025 · Apt 5C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the 1st room from east at south, the 1st room from east at north located at apt 5c, 5th story, 1st apartment from west at north
Mar 19, 2025 · Apt 5C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and south wall in the bathroom located at apt 5c, 5th story, 1st apartment from west at north
Feb 7, 2025 · Apt 5C
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5c, 5th story, 1st apartment from west at north
Feb 7, 2025 · Apt 5C
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 5c, 5th story, 2nd apartment from west at north
Dec 31, 2024 · Apt 5C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5c, 2nd apartment from west at north
Dec 31, 2024 · Apt 5C
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 4th room from east located at apt 5c, 5th story, 2nd apartment from west at north
Dec 31, 2024 · Apt 5C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5c, 5th story, 2nd apartment from west at north
Dec 31, 2024 · Apt 5C
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 5c, 5th story, 2nd apartment from west at north
Dec 31, 2024 · Apt 5C
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 5c, 5th story, 2nd apartment from west at north
Dec 31, 2024 · Apt 5C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 5c, 5th story, 2nd apartment from west at north
Dec 31, 2024 · Apt 5C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling inside upper cabnet at east wall in the kitchen located at apt 2k, 2nd story, 1st apartment from south at west
Nov 20, 2024 · Apt 2K
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents rats in the entire apartment located at apt 2k, 2nd story, 1st apartment from south at west
Nov 20, 2024 · Apt 2K
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2k, 2nd story, 1st apartment from south at west
Nov 20, 2024 · Apt 2K
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2k, 2nd story, 1st apartment from south at west
Nov 20, 2024 · Apt 2K
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2k, 2nd story, 1st apartment from south at west
Nov 20, 2024 · Apt 2K
Closed — Violation dismissed
DOB building violations · 46
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 22, 2025
Dob violation - dismissed - Construction other optional
Emergency work order due to facade parapet wall cracks,spalling,defect missing mortar joints @ exp#1 (west) at mult locs. remedy:immediately take & provide safety measures to secure public & install adequate saf meas @ exp1(west)&exp3(east).make immediate repairs under supervision of lic profess. all remove & secure all loose/hanging materials
Nov 19, 2024
Dob violation - active - Construction other optional
Emergency work order due to deteriorated firescape located at rear facade exp#3(east elev)remedy: owner to immediately retain nys pe & li gc to repair fire escape under fulltime nys pe on site supervision start work immediately & continue daily until repairs are complete provide safety guard 24 hours until repair complete
Nov 19, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - dismissed - Construction other optional
Respondent requested to providea signed &sealed letter,along w/dwgs,
Mar 5, 2020
Dob violation - dismissed - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Oct 1, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 24, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 1, 2015
Dob violation - resolved - Facade safety program facade required
Fisp-facade safety program facade required
Jun 22, 2015
Dob violation - dismissed
Show 36 more ↓
- Facade safety program facade required
Fisp-facade safety program facade required
Jun 22, 2015
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 15, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 29, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 17, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 16, 2001
Vw-violation work without permit - active - Construction other optional
C-construction other optional
Apr 16, 2001
Vw-violation work without permit - active - Construction other optional
C-construction other optional
Apr 16, 2001
Vw-violation work without permit - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatorrequired
1p17275
Dec 1, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Elevator elevatorrequired
Device #1p17275
Feb 22, 1991
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
(51) cover car light
Jan 5, 1989
Dob violation - resolved
ECB violations · 36
- Class - 2
Class 2: phone inoperative repair & connect service to emergency operator. cab mirror missing install & align new mirror. light covers missing on cab lights provide. evaucation signs & braille tags missing prov
May 9, 2025 · Penalty $655
Resolve - Class - 1
Failure to provide adequate safety measures such as shed netting,ect where required to protect public and property from documented unsafe facade as per 1rcny 103-04.unsafe notification report filed as unsafe by
Nov 19, 2024 · Penalty $10,000
Resolve - Class - 3
Observed apt # 5c instate of minor water damaged on bedroom windows above. also observed minor damaged floor in kitchen by the refrigerator., repair and or replace
Sep 17, 2024
Resolve - Class - 1
Found door restrictor is not working. cease use. repair and adjust. re-inspection is required.
Aug 9, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances.exposure 1 (amsterdam ave side)observed damaged mortar joints on 1st floor masonry facade.rem:maintain exterior building facade provide safety meas
Nov 20, 2017
Resolve - Class - 2
Failure to maintain bldg exterior facade and appurtenances as noted: exp1 inadequately supported a/c's on 3rd flr, wood left on window sill on 3rd flr, spalled brick on 1st flr, damaged calded joint on 1st flr
Apr 5, 2017 · Penalty $250
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Jan 5, 2015 · Penalty $800
Resolve - Class - 2
19m07,37x10,60q03,67x10,68m07,71x10: 19m07;provide bottom safety retainer fire gibbs for hoistway doors. 37x10;repair light in overhead sheave room. 67x10;repair communication in car telephone.
Jan 13, 2012 · Penalty $500
Resolve - Class - 2
17h07 10h07 70o02 56o02 39o02 67l10. 17h07- hoistway door gibs are work replace where needed. 10h07- car door gibs are worn replace. 67l10- communication inside elevator not working provide.
Jan 18, 2011 · Penalty $500
Resolve - Class - 2
70o02,56y10,56o02,40o02,59e01.67l10,10h11,16h11,100i10.56y10-seal oil leak main machine.56o02-clean oil on machine & bedplate.40o02-clean all no elevator equipment form motor room.59e01-machine brake is rubbing
Aug 19, 2008 · Penalty $500
Resolve
Show 26 more ↓
- Hazardous
Failure to maintain adequate housekeeping building construction debris from apt 3n was stored at the rear of the bldg w/o proper container remedy: maintain adequate housekeeping
Mar 3, 2008 · Penalty $500
Resolve - Hazardous
Failure to provide approved plans at premises at time of inspection noted approved plans were not at site while construction was in progress for inspection (apt 3n) remedy: provide approved plans
Mar 3, 2008
Resolve - Hazardous
Failure to post permit for work at premises at time of inspection no permits were seen at main entrance to building of at apt 3n at time of inspection remedy: post permit for work at premises
Mar 3, 2008
Resolve - Hazardous
Work w/o permit- cement work noted: placement of concrete flr slab; approx 2" to 2 1/2" thick & 10'-0 wide & 15'-0 long cement concrete flr slab constructed at kitchen in apt #2e which likely to be increase
May 16, 2007
Resolve - Non-hazardous
85u05/14m07/15m07 85-date of tag 10/00 15-unable to post certificate.
Jul 26, 2006 · Penalty $180
Resolve - Non-hazardous
Plumbing work without a permit at time of inspection found traps and fixtures where removed and not connected remedy:obtain a permit iffeasible or restore to prior legal condition
May 3, 2005 · Penalty $800
Resolve - Non-hazardous
Work w/o a permit. work noted: cut renovation in progress by removing entire kitchen and bathroom. replacing new sub floors and tiles in kitchen and bathroom. new sheetrock replacement to the entire apartment
Apr 11, 2005 · Penalty $250
Resolve - Non-hazardous
Failure to maintain interior bldg defects are the flooring leading to the bathroom is slopingand sagging also noted in apt 5c bathroom door is out of blumb & out of square. the bedroom closet ceiling is cracked
Feb 20, 2002 · Penalty $350
Resolve - Non-hazardous
Work without a permit.work noted:1)cutting & splicing wooden floor joists approx 5-6 at bathroom of 3e.ii)installing hooder beam single 2"x10" as load bearing for 4th floor joists & iii)heavy notching of wooden
Apr 16, 2001 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit.created three store front with metal roll down gates,new sheet rocks partitions and ceiling licated at first floor front.remedy:obtain permit and approvals from this department
Apr 16, 2001
Resolve - Non-hazardous
Work without a permit.stop work noted:steel roll down gates.new store front, new hung ceiling, new access door thru concrete floor to basement location south store front grocery store.remedy:stop all work.obtai
Apr 16, 2001
Resolve - Non-hazardous
Work without a permit. created three store fronts with metal roll down gate, new sheet rocks partitions and ceilings located at first floor front. obtain permits and approvals from this department.
Apr 19, 1999
Resolve - Non-hazardous
Work without a permit. work noted created 2 new stores & fronts with new roll down gates. new sheet rock partitions. new suspended ceilings located at 1st story front, north side. remedy: obtain approvals and p
Nov 18, 1997
Resolve - Hazardous
Work without permit work noted (1) cutting & splicing wooden floor joist approx 5-6 at bathroom of apt 3e(2) installing header beam single 2"x10" as load bearing for 4 floor joists (3) heavy notching of wooden
Feb 24, 1997 · Penalty $1,000
Resolve - Non-hazardous
Failur eto maintain defect i sfloors in apt lines e&f are sagged at bathrooms /kitchens respectively remedy repair/reolace all affected portions
Feb 20, 1997 · Penalty $1,000
Resolve - Non-hazardous
Work without a permit. work noted: created two new stores fronts, with new roll-down gates, new sheet rock partitions new ceilings located at first story front north side. remedy: obtain permits and approvals i
Aug 28, 1995 · Penalty $1,000
Resolve - Non-hazardous
Work without a permit.work noted:2 stores created with new store front new roll/down gates new sheet rock partitions &new ceilings located at 1st story front.remedy:obtain permit &approvals or restore premises
Feb 28, 1995 · Penalty $350
Resolve - Non-hazardous
Work without a permit as per inspection dl 11/02/88. noted: created 3 new store fronts with new metal roll down gates, new sheet-rock partitioning, new ceiling, located at the 1st story front. remedy:---
Feb 17, 1995 · Penalty $350
Resolve - Non-hazardous
Work without a permit.noted:steel roll down gates,new store front,new hung ceiling,new access door thru concrete fl to bsmnt.as per inspect-ion alt2/2/89.location:south store front grocery store,now goradito au
Feb 17, 1995
Resolve - Hazardous
08v,11b,5h,18q,18l,21x,22d,28l,30m,47l,55x,56x,57o,75t, 8voff over 4" 5hsaddle 18lexposed wiring 30facial plates 18lbad contacts worn out rollers
Oct 25, 1994 · Penalty $500
Resolve - Non-hazardous
Work without a permit. work noted: creating three new store fronts with new metal roll down gates, sheetrock partitions and ceilings at the first story front. remedy: obtain a permit and approvals
Feb 9, 1993 · Penalty $1,000
Resolve - Non-hazardous
Workwithout a permit work noted creating three new store fronts with new metal roll down gates new sheetrock partitions new ceilings located at the first story front remedy obtain a permit and approvals
Jun 10, 1992 · Penalty $5,000
Resolve - Non-hazardous
35p,33p,57o
Aug 23, 1991 · Penalty $1,000
Resolve - Non-hazardous
35p,40p
Feb 22, 1991
Resolve - Unknown
Woerk without a permit stop work noted steel roll down gates new store front new hung ceiling new access door thru concrete floor to basement location south store front grocery store. remedy stop all work
Feb 2, 1989 · Penalty $1,000
Resolve - Unknown
Work without a permit work noted creating three new store fronts with new metal roll down gates new sheetrock partitions new ceilings located at the first story front. remedy obtain a permit and approvals
Nov 2, 1988 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close - Plumbing
Basin/sink
Oct 1, 2026 · Apt 2H
Open - Plumbing
Bathtub/shower
Oct 1, 2026 · Apt 2H
Open - Electric
Power outage
Sep 10, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Sep 8, 2026 · Apt 1K
Close - Unsanitary condition
Mold
Aug 10, 2026 · Apt 1K
Close - Heat/hot water
Entire building
Jun 22, 2026 · Apt BLDG
Close - Door/window
Window frame
Jun 15, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Mar 19, 2026 · Apt BLDG
Close - Water leak
Slow leak
Mar 4, 2026 · Apt 5C
Close - Electric
Outlet/switch
Mar 4, 2026 · Apt 5C
Close - Unsanitary condition
Mold
Mar 4, 2026 · Apt 5C
Close - Heat/hot water
Entire building
Feb 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 3E
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 3E
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 3E
Close - Electric
Outlet/switch
Jan 25, 2026 · Apt 5C
Close - Electric
Lighting
Jan 25, 2026 · Apt 5C
Close - Unsanitary condition
Mold
Jan 25, 2026 · Apt 5C
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt 4N
Close - Flooring/stairs
Floor
Jan 14, 2026 · Apt 5C
Close - Appliance
Electric/gas range
Jan 14, 2026 · Apt 5C
Close - Heat/hot water
Entire building
Jan 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 3, 2026 · Apt 3E
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt BLDG
Close - Door/window
Window frame
Dec 15, 2025 · Apt 5C
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Door/window
Door
Dec 15, 2025 · Apt 5C
Close - Unsanitary condition
Mold
Dec 15, 2025 · Apt 5C
Close - Heat/hot water
Entire building
Dec 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Dec 4, 2025 · Apt 5C
Close - Door/window
Door frame
Dec 4, 2025 · Apt 5C
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt BLDG
Close - Electric
Wiring
Dec 4, 2025 · Apt 5C
Close - Electric
Wiring
Dec 4, 2025 · Apt 5C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1929
- Floors
- 6
- Residential units
- 82
- Building area
- 84,651 ft²
- Lot area
- 20,000 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2112 / 15
- Assessed value
- $3,699,000
- Landmark / historic district
- No
HPD registration #102001, last renewed Aug 24, 2025.
Questions about 2201 Amsterdam Avenue
Who owns 2201 Amsterdam Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Kmr Amsterdam LLC.
Does 2201 Amsterdam Avenue have violations?
Yes. NYC HPD has recorded 540 housing violations at this property.
Is 2201 Amsterdam Avenue rent stabilized?
NYC Department of Finance tax bills listed 57 rent-stabilized units here in 2024 (about 70% of its 82 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2201 Amsterdam Avenue built?
City records list 1929 as the year it was built.
How many apartments are in 2201 Amsterdam Avenue?
It has 82 residential units and 85 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.