618 West 142 Street
Manhattan, NY 10031BBL 1-02088-0106Map
Owner of record: 618 Equity Corp
618 West 142 Street is an elevator apartment building built in 1915 in Manhattan, 10031. It has 44 residential units across 6 floors. The owner of record is 618 Equity Corp. HPD has recorded 1,438 housing violations here, most recently on September 23, 2026. 41 of the 50 most recent violations are still open. City tax records listed 40 rent-stabilized apartments here in 2024.
- HPD violations
- 1,438
- DOB violations
- 25
- ECB violations
- 34
- HPD complaints
- 1,110
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,438
- BHazardous
Abate the nuisance consisting of pests. evidence of flies at basement
Sep 23, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 6c, 6th story, 2nd apartment from north at east
Sep 3, 2026 · Apt 6C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 6c, 6th story, 2nd apartment from north at east
Sep 3, 2026 · Apt 6C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at east and south wall in the kitchen located at apt 6c, 6th story, 2nd apartment from north at east
Sep 3, 2026 · Apt 6C
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, east and south wall in the bathroom located at apt 6c, 6th story, 2nd apartment from north at east
Sep 3, 2026 · Apt 6C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at east and south wall in the bathroom located at apt 6c, 6th story, 2nd apartment from north at east
Sep 3, 2026 · Apt 6C
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north at west located at apt 6c, 6th story, 2nd apartment from north at east
Sep 3, 2026 · Apt 6C
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above ceiling in the bathroom located at apt 6c, 6th story, 2nd apartment from north at east
Sep 3, 2026 · Apt 6C
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Aug 28, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at east and south wall in the bathroom located at apt 6c, 6th story, 2nd apartment from north at east
Aug 27, 2026 · Apt 6C
Open — Notice of issuance sent to tenant
Show 40 more ↓
- CImmediately hazardous
Repair the leaky and/or defective water supply pipe at main water shut off valve at north wall in the bathroom located at apt 6c, 6th story, 2nd apartment from north at east
Aug 27, 2026 · Apt 6C
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at east wall in the kitchen located at apt 6c, 6th story, 2nd apartment from north at east
Aug 27, 2026 · Apt 6C
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 6c, 6th story, 2nd apartment from north at east
Aug 27, 2026 · Apt 6C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 6c, 6th story, 2nd apartment from north at east
Aug 27, 2026 · Apt 6C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 6c, 6th story, 2nd apartment from north at east
Aug 27, 2026 · Apt 6C
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Aug 27, 2026
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at west located at apt 6f, 6th story, 2nd apartment from south at west
Aug 24, 2026 · Apt 6F
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash at window at west in the kitchen located at apt 4g, 4th story, 1st apartment from west at north
Jul 29, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Provide escucheon plate at riser at ceiling and floor in the bathroom located at apt 4g, 4th story, 1st apartment from west at north
Jul 29, 2026 · Apt 4G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 4g, 4th story, 1st apartment from west at north
Jul 29, 2026 · Apt 4G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wooden floor in the 2nd room from north located at apt 4g, 4th story, 1st apartment from west at north
Jul 29, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4g, 4th story, 1st apartment from west at north
Jul 29, 2026 · Apt 4G
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4g, 4th story, 1st apartment from west at north
Jul 29, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 4g, 4th story, 1st apartment from west at north
Jul 29, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at boiler room
Jul 13, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 2nd apartment from east at south
Jul 13, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 6d, 6th story, 1st apartment from east at south
Jul 12, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking on north wall window frame in the 3rd room from east located at apt 6d, 6th story, 1st apartment from east at south
Jul 12, 2026 · Apt 6D
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6e, 6th story, 1st apartment from south at west
Jul 12, 2026 · Apt 6E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east located at apt 6d, 6th story, 1st apartment from east at south
Jul 12, 2026 · Apt 6D
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4d, 4th story, 1st apartment from east at south
Jul 12, 2026 · Apt 4D
Closed — Violation closed - BHazardous
Properly secure the loose saddle in the bathroom located at apt 6e, 6th story, 1st apartment from south at west
Jul 12, 2026 · Apt 6E
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3e, 3rd story, 1st apartment from south at west
Jul 12, 2026 · Apt 3E
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at balcony at 3rd story at 2nd stack from east at north at fire escape
May 22, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 1b, 1st story, 1st apartment from north at east
May 11, 2026 · Apt 1B
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 1b, 1st story, 1st apartment from north at east
May 11, 2026 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
May 11, 2026 · Apt 1B
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4d, 4th story, 1st apartment from east at south
May 4, 2026 · Apt 4D
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2d, 2nd story, 1st apartment from east at south
May 4, 2026 · Apt 2D
Open — First no access to re- inspect violation - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at boiler room
May 4, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the bathroom located at apt 1g, 1st story, 1st apartment from west at north
Apr 17, 2026 · Apt 1G
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 1g, 1st story, 1st apartment from west at north
Apr 17, 2026 · Apt 1G
Open — First no access to re- inspect violation - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Apr 15, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 2nd apartment from west at north
Apr 15, 2026 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4d, 4th story, 1st apartment from east at south
Apr 15, 2026 · Apt 4D
Open — Not complied with - ANon-hazardous
Properly repair with similar material the broken or defective wood door frame molding in the bathroom located at apt 6d, 6th story, 1st apartment from east at south
Apr 10, 2026 · Apt 6D
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective stool at window in the kitchen located at apt 6d, 6th story, 1st apartment from east at south
Apr 10, 2026 · Apt 6D
Open — Not complied with - ANon-hazardous
Properly repair with similar material the broken or defective gaps in wood floor near north and east walls in the 4th room from east located at apt 6d, 6th story, 1st apartment from east at south
Apr 10, 2026 · Apt 6D
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the foyer located at apt 6d, 6th story, 1st apartment from east at south
Apr 10, 2026 · Apt 6D
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 6d, 6th story, 1st apartment from east at south
Apr 10, 2026 · Apt 6D
Open — Not complied with
DOB building violations · 25
- Construction other optional
Failure to maintain building in a code compliant manner.noted at the t ime of inspection,i observed at exposure 1,cracked and damaged stone w ork and loose mortar joints at multiple locations.remedy:repair and/or replace
May 2, 2026
Dob violation - active - Construction other optional
Failure to maintain building exterior facade in a code compliant manne r.at time of inspection it was observed at exp1 north elev cracked bri ck facade at multiple locations and broken window.at exp4 west elev ve rtical crack extending approx 30ft from roof to around 4th floor was o bserved.remedy:repair and/or replace
Mar 19, 2025
Dob violation - active - Construction other optional
Failure to maintain. observed fence at exposure #2 on shared retaining wall of 620 and 618 west 142 st is poorly maintained with barbed wire that is loose and in danger of falling onto 618 west 142 st side yard (exposure#2).
Feb 10, 2023
Dob violation - active - Construction other optional
Sidewalk shed elected at premises with an expired permit#m00224322-11- sh. expired 1/26/22 posted at premises:in addition, there were missing bolts at several locations at 6 of the supporting column of the sidewl sidewalk shed( maintenance) of shed is recommenced
Jan 20, 2023
Vpw*-violation unserved ecb-work without permit-dismissed - Hazardous condition (facade) facade required
Cycle 8b unsafe report filed
Oct 26, 2021
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9b unsafe report filed
Oct 26, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 13, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 16, 2015
Dob violation - resolved
Show 15 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 20, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 19, 2004
Dob violation - resolved - Elevator elevatorrequired
1p9757
Jan 9, 2002
Dob violation - resolved - Electric signs none
Es-electric signs none
Jul 22, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 9, 1994
Vp*-violation unserved ecb- dismissed - Electric signs none
Es-electric signs none
Feb 20, 1991
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 1990
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 10, 1988
Dob violation - resolved - Elevator elevatorrequired
Provide capacity plate in elev replace missing hand nails and elevator
Oct 18, 1988
Dob violation - resolved
ECB violations · 34
- Class - 2
Pedestrian protection does not meet code specifications. noted at the time of inspection i observed defective/inadequate shed conditions ie.parapet panel on sidewalk shed is missing at the north-east side of ex
May 2, 2026 · Penalty $10,000
Active - Class - 2
Temporary construction equipment on site; expired permit. noted at thetime of inspection, i observed that permit for sidewalk shed had expired. i checked on the site and found that no permit was displayed. i th
May 2, 2026
Resolve - Class - 2
Expired sidewalk shed permit. noted at the time of inspection i observed that permit for sidewalk shed had expired. i checked on the site and found that no permit was displayed. then i checked the bis intranet
May 2, 2026 · Penalty $6,250
Active - Class - 2
Failure to file acceptable amended cycle 8b and 9b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #914079. agg1: prior nov 37026246x under
Apr 20, 2026 · Penalty $10,000
Active - Class - 1
5/l/10 class 1 car door restrictor is not working defective repair, 16/l/1 hoist way doors on all floors need adjust .
Apr 2, 2026 · Penalty $3,125
Resolve - Class - 2
Ftm temporary construction equip/installation on site expired with permit #m00224322-i1-sh for side walk shed since 1/23/2025 & was not renewed & (gc-616952) license expired on 1/23/2025 also was never renewed.
Mar 18, 2026 · Penalty $6,250
Active - Class - 2
Expired sidewalk shed permit. at time of inspection upon researching on bis and dobnow no active sidewalk shed permit was observed. permit #m00224322-i1-sh last active permit expired on 01/23/2025. remedy: rene
Mar 19, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain exterior facade and appurtenances.note:broken/cracked glass pane window at 7th story at exposure#1 north elevation.cracked/spalling terra cotta at 6th story water table at exp 1 north.rem:ma
Nov 19, 2024 · Penalty $625
Active - Class - 2
Failure to file acceptable amended cycle 8b and 9b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#914079.rem:file acceptable report.
Jan 16, 2024 · Penalty $6,250
Active - Class - 2
Pedestrian protection does not meet code specifications observed sidewalk shed installed at exp # 1 missing the minimum 5 feet extension as required (3307.6.3) on the left side of sws. extensions are to protect
Oct 26, 2023 · Penalty $2,400
Resolve
Show 24 more ↓
- Class - 2
Temporary construction equipment on site-expired permit.observed sidewalk shed erected at exp #1 temporary construction equipment required active permit to be installed to remain erected at all time.permit #(m0
Feb 6, 2023 · Penalty $625
Resolve - Class - 2
Sidewalk shed parapet information panel not provided sws erected at exp #1 missing parapet info panel building address must be identified as required by code.remedy:provide sws parapet info panel.
Feb 6, 2023 · Penalty $1,250
Resolve - Class - 2
Temporary construction equipment on site-expired permit.at time of inspection,observed temporary construction equipment sidewalk shed on site with expired permit#m00224322-i1-sh that expired on 11/24/2022 but n
Jan 31, 2023 · Penalty $625
Resolve - Class - 1
Failure to provide adequate safety measures such as shed,netting,etc. where required to protect & secure public from documented unsafe facade as per 1rcny 103-04. facade technical report filed as unsafe by qewi
Nov 15, 2021 · Penalty $25,000
Resolve - Class - 1
Failure to provide adequate safety measures such as shed netting,etc where required to protect and secure public from documented unsafe facade as per 1rcny 103-04.facade technical report filed as unsafe by qewi
Oct 7, 2021 · Penalty $10,000
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances.note observed at exp1 and 3 disconnected fire escape step and bent fire escape steps.exp1 defect is located at window line#3-4 at step between 3-4f
Oct 7, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to submit acceptable required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #814079.agg1:prior nov #37013193z under 28
Jun 1, 2021 · Penalty $3,125
Resolve - Class - 2
Found federal boiler model-fst80 operating with defects. automatic low water cut off defective. aquastat defective. correct all violating conditions and submit a certificate of correction.
Mar 4, 2020 · Penalty $625
Resolve - Class - 2
Work w/o a permit. noted: at apt#4d erected full height partition wallin living room to create bedroom. remedy: obtain all permits.
Feb 6, 2020
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: premises 6 sty nfp masonry frame bldg. at the time of inspection,i observed plaster cracks,water stain marks on dining room ceiling in apt#6b unable to
Dec 28, 2018 · Penalty $312
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control 814079. rmdy: submit required technical report.
Oct 15, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #35330943p issued 05/12/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for c of c. rem: comply w
Jul 9, 2018 · Penalty $625
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: at cellar level, the exit passage is obstructed with household items and trash and construction materials (sand, cement etc). rem: remove obstruction.
May 12, 2018 · Penalty $312
Resolve - Class - 2
39x10,37x10,02b10,59b07,68b07,68b07,56y13,57b11,52m07,26d06,14m07.(39)repair toc car light.(37)repair overhead light.(02)repair alarm.(59)propertly tag bk maint sw(no marker)and input information on log book.(6
Apr 16, 2018
Resolve - Class - 2
50a-i. as per class2 (b254)28.301.1 failure to maintain. (50a)flue pipe in basement not fire wrapped. (50b)2nd manual reset low water cut-off not installed. 1 low water cut-off, no manual reset. (50c)pigtail fo
Mar 20, 2018 · Penalty $1,562
Resolve - Class - 1
Failure to provide unobstructed exit passageway.noted:at time of inspection i observed at cellar level the exit passage is obstructed with household debris and trash.rem:remove obstruction.
Mar 17, 2018
Resolve - Class - 2
02x07,70o02,37p16. 02-2way communication inoperative; 37-no means of access to overhead sheave and governor to finish this inspection.
May 25, 2016 · Penalty $500
Resolve - Class - 2
100m07,05l10,41l01,40o02,70l10,100al10,100-cut clearance sign ,05-zone restrictor,40-self closing,40-remove all(now)elevator equipment out of motor room,70-pit ladder hand rails rise to code,100a,fire ext date.
Jul 1, 2014 · Penalty $500
Resolve - Class - 3
Failure to maintain building defect noted apt 6e bedroom (sloping) flr & also water damage section of approx 12"x12". remedy: repair and/or replace.
Apr 14, 2009 · Penalty $200
Resolve - Non-hazardous
41a09/21m07/36o02/38o02/36d06/38m07/66o02.(41-a-09) remove jumper back of controller.(21-m-07)provide covers interlock basement floor and lobby floor.(36-o-02)clean overhead.(38-o-02) clean car top.(36-d-06) pr
Mar 30, 2005
Resolve - Non-hazardous
17r,50y,35y,53r,2i,46t,48t,49t,31q,8v. 17-with wire glass.
Dec 21, 1994 · Penalty $200
Resolve - Hazardous
03v,17m,18m,33i,29r,01x,08v,21l,31m,37g,48l,50l,55x. 03 remove point from capacity plate. 17 frame on 6th floor door.
Dec 2, 1992 · Penalty $500
Resolve - Non-hazardous
03u;05l;17m;18m;33i;33i;21l;45m'45t;49t;50y;50y;57o; 03.remove permit from capcity plate. 05. hand role. 17.frame on 6th floor door up. 18. cover. 33. skylight and door. 45.m skipping device.
Feb 27, 1992
Resolve - Non-hazardous
35p,40p,33p
Jul 11, 1991
Resolve
Complaints
- Heat/hot water
Entire building
Oct 17, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 8, 2026 · Apt 4A
Close - Paint/plaster
Ceiling
Sep 27, 2026 · Apt 6F
Close - Elevator
Maintenance
Sep 26, 2026 · Apt 4G
Close - Unsanitary condition
Pests
Sep 26, 2026 · Apt 4G
Close - Unsanitary condition
Pests
Sep 26, 2026 · Apt 4G
Close - Unsanitary condition
Pests
Sep 26, 2026 · Apt 4G
Close - Heat/hot water
Apartment only
Sep 22, 2026 · Apt 2D
Close - Heat/hot water
Apartment only
Sep 18, 2026 · Apt 2D
Close - Unsanitary condition
Pests
Sep 16, 2026 · Apt 4A
Close
Show 40 more ↓
- Elevator
Maintenance
Sep 16, 2026 · Apt 4A
Close - Door/window
Door
Sep 16, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Sep 16, 2026 · Apt 4A
Close - Plumbing
Water supply
Sep 5, 2026 · Apt 4A
Close - Water leak
Slow leak
Sep 1, 2026 · Apt 6C
Close - Paint/plaster
Ceiling
Sep 1, 2026 · Apt 6C
Close - Unsanitary condition
Mold
Sep 1, 2026 · Apt 6C
Close - Paint/plaster
Ceiling
Aug 26, 2026 · Apt 6C
Close - Unsanitary condition
Mold
Aug 26, 2026 · Apt 6C
Close - Water leak
Slow leak
Aug 26, 2026 · Apt 6C
Close - Unsanitary condition
Mold
Aug 21, 2026 · Apt 6F
Close - Paint/plaster
Ceiling
Aug 21, 2026 · Apt 6F
Close - Paint/plaster
Ceiling
Aug 20, 2026 · Apt 6F
Close - Water leak
Heavy flow
Aug 20, 2026 · Apt 6F
Close - Unsanitary condition
Pests
Jul 27, 2026 · Apt 4G
Close - Paint/plaster
Window/frame
Jul 27, 2026 · Apt 4G
Close - Door/window
Window frame
Jul 27, 2026 · Apt 4G
Close - Paint/plaster
Wall
Jul 27, 2026 · Apt 4G
Close - Paint/plaster
Wall
Jul 27, 2026 · Apt 4G
Close - Paint/plaster
Ceiling
Jul 27, 2026 · Apt 4G
Close - Flooring/stairs
Floor
Jul 27, 2026 · Apt 4G
Close - Flooring/stairs
Floor
Jul 27, 2026 · Apt 4G
Close - Paint/plaster
Wall
Jul 27, 2026 · Apt 4G
Close - Paint/plaster
Ceiling
Jul 27, 2026 · Apt 4G
Close - Heat/hot water
Apartment only
Jul 12, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
May 20, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
May 17, 2026 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
May 13, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
May 10, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
May 7, 2026 · Apt 4A
Close - Paint/plaster
Wall
May 4, 2026 · Apt 1B
Close - Heat/hot water
Apartment only
May 3, 2026 · Apt 2D
Close - Heat/hot water
Apartment only
May 3, 2026 · Apt 2D
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 16, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Apr 15, 2026 · Apt 1G
Close - Heat/hot water
Apartment only
Apr 14, 2026 · Apt 2D
Close - Heat/hot water
Apartment only
Apr 13, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Apr 9, 2026 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1915
- Floors
- 6
- Residential units
- 44
- Building area
- 42,270 ft²
- Lot area
- 9,992 ft²
- Zoning
- R8
- Community board
- 109
- Council district
- 7
- Block / lot
- 2088 / 106
- Assessed value
- $1,350,000
- Landmark / historic district
- No
HPD registration #129146, last renewed Jul 23, 2026.
Questions about 618 West 142 Street
Who owns 618 West 142 Street?
The owner of record in NYC Department of City Planning PLUTO data is 618 Equity Corp.
Does 618 West 142 Street have violations?
Yes. NYC HPD has recorded 1,438 housing violations at this property.
Is 618 West 142 Street rent stabilized?
NYC Department of Finance tax bills listed 40 rent-stabilized units here in 2024 (about 91% of its 44 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 618 West 142 Street built?
City records list 1915 as the year it was built.
How many apartments are in 618 West 142 Street?
It has 44 residential units and 45 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.