79 St Nicholas Place
Manhattan, NY 10032BBL 1-02069-0008Map
Owner of record: 79 S N Ltd
79 St Nicholas Place is a walk-up apartment building built in 1921 in Manhattan, 10032. It has 27 residential units across 6 floors. The owner of record is 79 S N Ltd. HPD has recorded 594 housing violations here, most recently on May 18, 2026. 9 of the 50 most recent violations are still open. City tax records listed 26 rent-stabilized apartments here in 2024.
- HPD violations
- 594
- DOB violations
- 3
- ECB violations
- 8
- HPD complaints
- 737
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 594
- BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
May 18, 2026
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Dec 12, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at bulkhead door at public hall, 6th story
Dec 10, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Sep 30, 2025 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective roof bulkhead door
Sep 30, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock at door to the room leading to fire escape window in the 1st room from east at north located at apt 1b, 2nd story, 2nd apartment from north at east
Mar 6, 2024 · Apt 1B
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the all stories floors and treads at public halls and stairs throughout
Mar 6, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1b, 2nd story, 2nd apartment from north at east
Feb 8, 2024 · Apt 1B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 12 sq. ft. at ceiling, north wall in the bathroom located at apt 1a, 2nd story, 1st apartment from west at north
Jan 31, 2024 · Apt 1A
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from west at north wall door in the private hallway located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 2 sq ft at east window frame, south and north wall in the bathroom located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame in the foyer located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from north at east wall in the 2nd room from east at south located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the bathroom located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the private hallway located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st door frame from north at east wall in the 2nd room from east at south located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east at south located at apt 1b, 2nd story, 2nd apartment from north at east
Jan 3, 2024 · Apt 1B
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of house hold items at public hall, 3rd story
Aug 23, 2023
Closed — Violation dismissed - ANon-hazardous
Refit vestibule door at public hall, 1st story
Aug 24, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 1b, 2nd story, 2nd apartment from north at east
Aug 24, 2022 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective spring balance at upper and lower sashes at east 1 window in the 1st room from east located at apt 1b, 2nd story, 2nd apartment from north at east
Aug 24, 2022 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 1b, 2nd story, 2nd apartment from north at east
Aug 24, 2022 · Apt 1B
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1b, 2nd story, 2nd apartment from north at east
Aug 24, 2022 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 1b, 2nd story, 2nd apartment from north at east
Aug 24, 2022 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestibule at public hall, 1st story
Aug 24, 2022
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at south located at apt 5a, 6th story, 1st apartment from north at east
May 28, 2022 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the bathroom located at apt 5a, 6th story, 1st apartment from north at east
May 28, 2022 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 2nd room from east at south located at apt 5a, 6th story, 1st apartment from north at east
May 28, 2022 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 5a, 6th story, 1st apartment from north at east
May 28, 2022 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 1st room from east at south located at apt 5a, 6th story, 1st apartment from north at east
May 28, 2022 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, west wall in the 1st room from east at south located at apt 5a, 6th story, 1st apartment from north at east
May 28, 2022 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 5a, 6th story, 1st apartment from north at east
May 28, 2022 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 5a, 6th story, 1st apartment from north at east
May 28, 2022 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from south at west wall in the 2nd room from east at south located at apt 5a, 6th story, 1st apartment from north at east
May 19, 2022 · Apt 5A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, west wall, east wall in the 1st room from east at south located at apt 5a, 6th story, 1st apartment from north at east
May 19, 2022 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the foyer located at apt 5a, 6th story, 1st apartment from north at east
May 19, 2022 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 5a, 6th story, 1st apartment from north at east
May 19, 2022 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st door frame from south at west wall in the 2nd room from east at south located at apt 5a, 6th story, 1st apartment from north at east
May 19, 2022 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the 1st room from east at north located at apt 5a, 6th story, 1st apartment from north at east
May 19, 2022 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at south located at apt 5a, 6th story, 1st apartment from north at east
May 19, 2022 · Apt 5A
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the foyer located at apt 5a, 6th story, 1st apartment from north at east
May 19, 2022 · Apt 5A
Closed — Violation dismissed
DOB building violations · 3
- Construction other optional
Retaining wall approx 10'-0" in height at rear of 79 st nicholas place located on property line between 880 st nicholas ave & 79 st nicholas pl is defective with vertical crack present running full height of wall and concrete slab of high elevation property (880 st nicholas ave) overhanging retaining wall.
May 22, 2023
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 8
- Class - 2
Failure to maintain exterior building walls and appurtenances. as noted: at time of inspection i observed on exposure #1 cracks and step crack in brick work at several floors; sagging corroded metal lintels at
Aug 8, 2023 · Penalty $6,250
Active - Class - 1
Failure to maintain building in code compliant manner.note:at the timeof inspection observed at expo#4 north elevation at chimney top level spalling/damaged masonry above the courtyard area.rem:repair and/or re
Jun 15, 2023 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order to file a cofc w/the dob.respondent failed to comply w/the comm's order to correct the violating conditions & file a cofc pursuant to 28-204.2 for nov#34889286p.rem:correct
Mar 9, 2011 · Penalty $800
Resolve - Class - 1
Failure to provide unobstructed exit passageway. note: fire escape passageway from rear yard of above premises is blocked by garage bays & plywood & numerous bags of cement. remedy: remove obstructions forthwi
Mar 9, 2011 · Penalty $2,400
Resolve - Class - 2
Failure to provide unobstructed exit passageway from rear yard. roof exit door hardware defective,broken,leaving roof door open to unauthorized entry at any time. remedy: remove obstruction,repair hardware at
Dec 18, 2010 · Penalty $250
Resolve - Non-hazardous
Failure to maintain exterior building wall noted: vertical crack in brick facade of 3/4" wide. bricks at top of crack are loose . location : n/w corner of bldg . adjacent to north fire escape at rear of bldg.r
Jan 10, 2000
Resolve - Hazardous
Failure to maintain exterior building wall. defect is: vertical crack in brick exterior wall approx. 1/2"-1 1/2" starting at west side of north fire passage and continuing up west side of building through to ro
May 15, 1997 · Penalty $800
Resolve - Hazardous
Failure to maintain. noted: vertical structural cracks ranging from 1/2"--1 1/2" in exterior wall over northwest fire passageway from rooflevel to 1st floor--in danger of collapse. creating hazardous conditi
Jun 7, 1995 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Apartment only
Jan 30, 2026 · Apt 4H
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2025 · Apt 2C
Close - Unsanitary condition
Garbage/recycling storage
Nov 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 6, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt 1E
Close - Heat/hot water
Entire building
Mar 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 17, 2024 · Apt 3G
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Oct 26, 2024 · Apt 6F
Close - Heat/hot water
Entire building
Sep 9, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2024 · Apt 2A
Close - Heat/hot water
Entire building
Jan 19, 2024 · Apt BLDG
Close - Plumbing
Basin/sink
Dec 26, 2023 · Apt 1B
Close - Flooring/stairs
Floor
Dec 24, 2023 · Apt 1B
Close - Water leak
Slow leak
Dec 24, 2023 · Apt 1B
Close - Water leak
Heavy flow
Aug 29, 2023 · Apt 5K
Close - Unsanitary condition
Mold
Aug 29, 2023 · Apt 5K
Close - Unsanitary condition
Garbage/recycling storage
Aug 12, 2023 · Apt BLDG
Close - Plumbing
Toilet
Jul 31, 2023 · Apt 2B
Close - Water leak
Slow leak
Sep 20, 2022 · Apt A
Close - Flooring/stairs
Floor
Aug 22, 2022 · Apt 1B
Close - Flooring/stairs
Floor
Aug 22, 2022 · Apt 1B
Close - Paint/plaster
Ceiling
Aug 22, 2022 · Apt 1B
Close - Water leak
Slow leak
Aug 8, 2022 · Apt 1B
Close - Heat/hot water
Entire building
Jul 24, 2022 · Apt BLDG
Close - Unsanitary condition
Pests
May 27, 2022 · Apt 5A
Close - Electric
Wiring
May 27, 2022 · Apt 5A
Close - Unsanitary condition
Mold
May 27, 2022 · Apt 5A
Close - Door/window
Door
May 27, 2022 · Apt 5A
Close - Paint/plaster
Wall
May 27, 2022 · Apt 5A
Close - Paint/plaster
Ceiling
May 27, 2022 · Apt 5A
Close - Paint/plaster
Ceiling
May 27, 2022 · Apt 5A
Close - Paint/plaster
Wall
May 27, 2022 · Apt 5A
Close - Paint/plaster
Wall
May 24, 2022 · Apt 5A
Close - Paint/plaster
Ceiling
May 16, 2022 · Apt APT5A
Close - Door/window
Door
May 16, 2022 · Apt APT5A
Close - Unsanitary condition
Pests
May 16, 2022 · Apt APT5A
Close - Water leak
Heavy flow
May 16, 2022 · Apt APT5A
Close - Plumbing
Radiator
May 16, 2022 · Apt APT5A
Close - Plumbing
Radiator
May 16, 2022 · Apt APT5A
Close - Paint/plaster
Wall
May 16, 2022 · Apt APT5A
Close - Heat/hot water
Entire building
Dec 2, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 2, 2020 · Apt 2E
Close - Heat/hot water
Apartment only
Nov 16, 2020 · Apt 2D
Close - Appliance
Electric/gas range
Apr 20, 2018 · Apt 5A
Close - Flooring/stairs
Floor
Dec 6, 2017 · Apt 3D
Close - Paint/plaster
Wall
Dec 6, 2017 · Apt 3D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1921
- Floors
- 6
- Residential units
- 27
- Building area
- 25,884 ft²
- Lot area
- 6,240 ft²
- Zoning
- R8A
- Community board
- 109
- Council district
- 9
- Block / lot
- 2069 / 8
- Assessed value
- $778,950
- Landmark / historic district
- Hamilton Heights / Sugar Hill Northeast Historic District
HPD registration #113041, last renewed Aug 29, 2025.
Questions about 79 St Nicholas Place
Who owns 79 St Nicholas Place?
The owner of record in NYC Department of City Planning PLUTO data is 79 S N Ltd.
Does 79 St Nicholas Place have violations?
Yes. NYC HPD has recorded 594 housing violations at this property.
Is 79 St Nicholas Place rent stabilized?
NYC Department of Finance tax bills listed 26 rent-stabilized units here in 2024 (about 96% of its 27 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 79 St Nicholas Place built?
City records list 1921 as the year it was built.
How many apartments are in 79 St Nicholas Place?
It has 27 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.