45 Hamilton Terrace
Manhattan, NY 10031BBL 1-02050-0109Map
Owner of record: Ham Terr 42 LLC
45 Hamilton Terrace is a walk-up apartment building built in 1899 in Manhattan, 10031. It has 10 residential units across 4 floors. The owner of record is Ham Terr 42 LLC. HPD has recorded 427 housing violations here, most recently on September 29, 2026. 43 of the 50 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2023.
- HPD violations
- 427
- DOB violations
- 7
- ECB violations
- 1
- HPD complaints
- 406
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 427
- CImmediately hazardous
Provide an adequate supply of gas to the fixtures at the gas range in the kitchen located at apt 10, 4th story, 1st apartment from north at east
Sep 29, 2026 · Apt 10
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective door frame in the entrance located at apt 10, 4th story, 1st apartment from north at east
Sep 29, 2026 · Apt 10
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and west wall at public hall, 3rd story
Sep 29, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective plaster at the ceiling and west wall at public hall, 3rd story
Sep 29, 2026
Open — Nov sent out - BHazardous
Provide 3 extra sprinkler heads and suitable wrench for emergency purposes at o.s.y. valve of sprinkler in accordance with the rules and regulations of this department .. at basement
Sep 29, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls at basement
Sep 29, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective plaster with fire rated material at the ceiling and all walls at basement
Sep 29, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls at boiler room
Sep 29, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective plaster with fire rated material at the ceiling and all walls at boiler room
Sep 29, 2026
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 10, 4th story, 1st apartment from north at east
Sep 29, 2026 · Apt 10
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Properly repair or replace the broken or defective lower window sash in the bathroom located at apt 10, 4th story, 1st apartment from north at east
Sep 29, 2026 · Apt 10
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at boiler room
Aug 13, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles at community kitchen, 4th story
Aug 13, 2026
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures .. at community bathroom, 4th story
Aug 13, 2026
Closed — Violation closed - BHazardous
Provide an adequate supply of gas to the fixtures at the gas range at community kitchen, 4th story
Aug 13, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective plaster with fire rated material at the ceiling at basement
Aug 13, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire door hinges at public hall
Aug 13, 2026
Open — Nov sent out - BHazardous
Properly repair the broken or defective paving concrete at boiler room
Aug 13, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock at entrance door at basement
Aug 13, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at basement
Aug 13, 2026
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .. at community bathroom, 4th story
Aug 13, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wooden cabinets in the kitchen located at apt 10, 4th story, 1st apartment from north at east
Aug 13, 2026 · Apt 10
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair with similar material the broken or defective plaster with fire rated material at the ceiling at boiler room
Aug 13, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lower window sash in the entire apartment located at apt 8, 4th story, 1st apartment from west at north
Aug 13, 2026 · Apt 8
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door latch set in the entrance located at apt 10, 4th story, 1st apartment from north at east
Aug 13, 2026 · Apt 10
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt 10, 4th story, 1st apartment from north at east
Aug 13, 2026 · Apt 10
Open — First no access to re- inspect violation - BHazardous
Repair the roof so that it will not leak at the ceiling in the 3rd room from east located at apt 10, 4th story, 1st apartment from north at east
Aug 13, 2026 · Apt 10
Open — First no access to re- inspect violation - BHazardous
Repair the leaky and/or defective faucets at the sink in the kitchen located at apt 10, 4th story, 1st apartment from north at east
Aug 13, 2026 · Apt 10
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair or replace the broken or defective lower window sash in the bathroom located at apt 10, 4th story, 1st apartment from north at east
Aug 13, 2026 · Apt 10
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective sloping subfloor in the bathroom located at apt 10, 4th story, 1st apartment from north at east
Aug 13, 2026 · Apt 10
Open — First no access to re- inspect violation - BHazardous
Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 10, 4th story, 1st apartment from north at east
Aug 13, 2026 · Apt 10
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
May 7, 2026 · Apt 10
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures bathroom and kitchen in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Mar 30, 2026 · Apt 10
Open — First no access to re- inspect violation - CImmediately hazardous
Provide adequate supply of hot water for the fixtures bathroom and kitchen in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Mar 30, 2026 · Apt 10
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective entrance door hinges at basement
Mar 26, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door leading to boiler room hinges at public hall
Mar 26, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective glass pane at the entrance door at basement
Mar 26, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hinges at boiler room
Mar 26, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective plaster with fire rated materials at all walls and ceiling at basement
Mar 26, 2026
Open — Nov sent out - BHazardous
Properly repair the broken or defective paving concrete paving at boiler room
Mar 26, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and the ceiling at basement
Mar 26, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule door hinges at public hall, 1st story
Mar 26, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Mar 26, 2026 · Apt 10
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Mar 23, 2026 · Apt 10
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Mar 23, 2026 · Apt 10
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling approx 5 sq feet at boiler room
Mar 21, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at boiler room
Mar 21, 2026
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at all hot water fixtures in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Mar 21, 2026 · Apt 10
Closed — Violation closed - CImmediately hazardous
Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 10, 4th story, 1st apartment from north at east
Mar 21, 2026 · Apt 10
Open — First no access to re- inspect violation
DOB building violations · 7
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Landmark none
Landmk-landmark none
Oct 14, 2016
Dob violation - active - Landmark none
Landmk-landmark none
Oct 14, 2016
Dob violation - dismissed
ECB violations · 1
- Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 10000069524y0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Dec 16, 2024 · Penalty $3,125
Active
Complaints
- Plumbing
Water supply
Oct 20, 2026 · Apt 8
Open - Plumbing
Water supply
Oct 20, 2026 · Apt 10
Open - Electric
No lighting
Aug 7, 2026 · Apt 8
Close - Appliance
Electric/gas range
Aug 7, 2026 · Apt 8
Close - Paint/plaster
Ceiling
Aug 7, 2026 · Apt 10
Close - General
Cabinet
Aug 7, 2026 · Apt 10
Close - Appliance
Refrigerator
Aug 7, 2026 · Apt 10
Close - Plumbing
Bathtub/shower
Aug 7, 2026 · Apt 10
Close - Door/window
Door
Aug 7, 2026 · Apt BUILDI
Close - Door/window
Door frame
Aug 7, 2026 · Apt BUILDI
Close
Show 40 more ↓
- Door/window
Door to dumbwaiter
Aug 7, 2026 · Apt BUILDI
Close - Door/window
Window frame
Aug 7, 2026 · Apt 8
Close - General
Cooking gas
Aug 7, 2026 · Apt 8
Close - Plumbing
Basin/sink
Aug 7, 2026 · Apt 8
Close - Appliance
Electric/gas range
Aug 7, 2026 · Apt 10
Close - General
Cooking gas
Aug 7, 2026 · Apt 10
Close - Door/window
Window frame
Aug 7, 2026 · Apt 10
Close - Door/window
Door frame
Aug 7, 2026 · Apt 10
Close - Flooring/stairs
Floor
Aug 7, 2026 · Apt 8
Close - Door/window
Door
Jun 25, 2026 · Apt 10
Close - Safety
Window guard broken/missing
Jun 25, 2026 · Apt 10
Close - Door/window
Door
Jun 10, 2026 · Apt 10
Close - Door/window
Door
Jun 10, 2026 · Apt 10
Close - Outside building
Gutter/leader
Jun 10, 2026 · Apt 10
Close - Safety
Window guard broken/missing
Jun 10, 2026 · Apt 10
Close - Heat/hot water
Entire building
May 8, 2026 · Apt 10
Close - Heat/hot water
Entire building
May 7, 2026 · Apt 8
Close - Heat/hot water
Entire building
May 6, 2026 · Apt 8
Close - Heat/hot water
Entire building
May 5, 2026 · Apt 10
Close - Heat/hot water
Entire building
May 4, 2026 · Apt 10
Close - Heat/hot water
Entire building
May 4, 2026 · Apt 8
Close - Heat/hot water
Entire building
May 4, 2026 · Apt 8
Close - Heat/hot water
Entire building
May 4, 2026 · Apt 10
Close - Plumbing
Water supply
Mar 30, 2026 · Apt 10
Close - Heat/hot water
Entire building
Mar 30, 2026 · Apt 10
Close - Plumbing
Water supply
Mar 30, 2026 · Apt 8
Close - Heat/hot water
Entire building
Mar 30, 2026 · Apt 8
Close - Heat/hot water
Entire building
Mar 30, 2026 · Apt 8
Close - Heat/hot water
Entire building
Mar 29, 2026 · Apt 8
Close - Heat/hot water
Entire building
Mar 28, 2026 · Apt 8
Close - Heat/hot water
Entire building
Mar 27, 2026 · Apt 10
Close - Heat/hot water
Entire building
Mar 26, 2026 · Apt 8
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt 10
Close - Heat/hot water
Entire building
Mar 23, 2026 · Apt 10
Close - Heat/hot water
Entire building
Mar 22, 2026 · Apt 10
Close - Heat/hot water
Entire building
Mar 21, 2026 · Apt 10
Close - Heat/hot water
Entire building
Mar 19, 2026 · Apt 10
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt 10
Close - Heat/hot water
Entire building
Mar 16, 2026 · Apt 10
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt 10
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jan 5, 2026 | $10 | Rentals - walkup apartments | 10 |
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1899
- Floors
- 4
- Residential units
- 10
- Building area
- 4,300 ft²
- Lot area
- 1,870 ft²
- Zoning
- R6A
- Community board
- 109
- Council district
- 9
- Block / lot
- 2050 / 109
- Assessed value
- $378,900
- Landmark / historic district
- Hamilton Heights Historic District
HPD registration #132052, last renewed Jul 20, 2026.
Questions about 45 Hamilton Terrace
Who owns 45 Hamilton Terrace?
The owner of record in NYC Department of City Planning PLUTO data is Ham Terr 42 LLC.
Does 45 Hamilton Terrace have violations?
Yes. NYC HPD has recorded 427 housing violations at this property.
Is 45 Hamilton Terrace rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2023 (about 90% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 45 Hamilton Terrace built?
City records list 1899 as the year it was built.
How many apartments are in 45 Hamilton Terrace?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.